Construction method Product List and Ranking from 1597 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Dec 10, 2025~Jan 06, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Dec 10, 2025~Jan 06, 2026
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. ナカムラ Hyogo//Other construction industries
  3. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  4. 4 シーカ・ジャパン Tokyo//Building materials, supplies and fixtures manufacturers
  5. 5 HOKOKU ENGINEERING CO.,LTD. Osaka//Other construction industries

Construction method Product ranking

Last Updated: Aggregation Period:Dec 10, 2025~Jan 06, 2026
This ranking is based on the number of page views on our site.

  1. Construction method for achieving large wooden structures: "NK Method" ナカムラ
  2. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  3. Foundation Omega Method HOKOKU ENGINEERING CO.,LTD.
  4. 4 [Disaster Measures] A must-see for those who want to reduce the amount of leftover soil! Liter Method 吉光組
  5. 5 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック

Construction method Product List

61~75 item / All 4277 items

Displayed results

Wooden gate-type frame, Guts Frame method

Wooden gate-type frame Guts frame method

By utilizing the exceptionally durable Guts Frame, it becomes possible to create homes like never before. - Achieves strength comparable to steel frames while being wooden - Can be ordered from a single frame - Allows for flexible design as it does not require durable walls - More affordable compared to steel frames *For details, please download the catalog.

  • Special Construction Method
  • Structural Materials
  • Special wooden structures

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Bird damage prevention special net Selview series

Bird damage prevention and bird control special net Selvue series

Cell view can physically prevent bird intrusion, making it effective. Additionally, it does not limit installation locations when using special mounting fixtures. It can be installed securely without gaps, ensuring a clean space free from bird intrusion. Even stubborn birds can be reliably repelled. <Features> - Easy installation - Eliminates the feeling of pressure at the installation site, gentle and does not compromise aesthetics - Does not obstruct evacuation routes and clears fire safety issues *Patent obtained *For details, please download the catalog.

  • Net fence
  • Dam construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Acid soil amendment pH Balance S

Neutralizing agent for acidic soil that does not cause alkaline damage.

The soil on slopes and other areas targeted for greening projects often lacks nutrients and soil bacteria, making it unsuitable for plant growth, as it is not "rich soil." In particular, in the case of cooperative soils, necessary bases in the soil can be leached away by acids, leading to deficiencies, and the number of effective soil bacteria drastically decreases. pH Balance S contains organic materials such as polysaccharides and proteins, which promote the explosive growth of soil bacteria. The relationship between soil and soil bacteria is essential for plant growth and "soil creation," as processes like soil aggregation, nutrient supply, and organic matter supply are all functions of the soil.

  • Soil improvement material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Road Upcon Method (Concrete Pavement Slab Repair Method)

We will repair various defects that occur in concrete pavement slabs within a short construction period.

New Technology from Upcon Contributing to the Longevity of Road Infrastructure Upcon quickly corrects defects that occur in concrete pavement slabs: - Elimination of step differences - Correction of subsidence - Resolution of fluttering - Elimination of voids and cavities - Restoration of water drainage gradients - Correction of subsidence in bearing plates For repairs on highways and other surfaces requiring high strength, we use a uniquely developed high-strength polyurethane resin to correct concrete pavement slabs in a short time. *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Miyagi Prefecture Onagawa Fishing Port Miyagasaki Wharf Disaster Recovery Work

"The surface drainage is becoming a puddle due to the unevenness" "It is hindering the operation of the forklift" Solved by the Upcon method.

This is a construction case study of the unloading quay at Onagawa Fishing Port and Fish Market in Miyagi Prefecture. The structure allowed for the continuous surface drainage of used water and seawater from the unloading area towards the quay. However, due to ground subsidence, a step was created in the concrete pavement, causing surface drainage to form puddles, which hindered the loading and unloading of cargo and the movement of forklifts. The Upcon method was adopted because it allowed for the correction of the step without breaking the concrete pavement and within a short construction period. 【Site Information】 Disaster Recovery Work at Miyagasaki Quay, Onagawa Fishing Port Construction Area: 338 square meters Maximum Subsidence: 32mm Construction Period: 5 days For more details on the construction process, you can view the PDF download below.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Quickly correct the tilts, steps, and gaps in school facility floors using the Upcon method.

The Upcon method quickly corrects floor deformations in classrooms, gymnasiums, and poolside areas caused by earthquakes and ground subsidence through polyurethane resin injection.

■There is a sense of discomfort when entering the classroom. ■The floor is slanted, posing a risk of injury or worsening health. ■The slanted floor causes the desks to wobble. ■Windows and doors are difficult to close. ■The gym floor is warped. ■The gym stage is distorted. ■Puddles form by the poolside. The "Upcon Method," which uses polyurethane resin, quickly resolves issues caused by floor slanting and warping due to earthquakes or ground subsidence, as well as voids and gaps that have formed beneath the floor.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Correction of floor subsidence and tilting due to earthquakes and ground subsidence in a short construction period: Upcon method.

Quickly correct the sinking of concrete floors with rigid polyurethane resin without stopping operations or sales [Factories, warehouses, stores, residences, etc.] [Case studies available].

The "Upcon Method" is a concrete floor slab sinking correction method that quickly rectifies floor tilts, steps, and voids caused by earthquakes or ground subsidence using rigid polyurethane resin. It does not require the dismantling of existing floors, nor does it necessitate the movement of machinery or products, allowing for corrections to be made without stopping operations or business. In addition to correcting sinking and filling voids in concrete floors of factories, warehouses, stores, and slab foundation houses, the "Upcon Method" is widely adopted for correcting steps and fluttering in concrete pavement slabs of roads and port facilities. 【Features of the Upcon Method】 ■ Short construction period Reduces construction time to about 1/10 of conventional concrete replacement methods. ■ No interruption of operations or business Since there is no need to move machinery or goods, construction can be carried out without stopping production lines or business operations. ■ Comprehensive high technical capability Construction is performed by 100% in-house technical staff who have received specialized training. Floor levels are managed to the millimeter, providing a high-precision finish. ■ Compact construction system Construction can be carried out using a truck equipped with all necessary materials and equipment, eliminating the need for large plant installation or removal. *For more details, please refer to the PDF materials (catalogs and case studies) or contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Miyagi Prefecture Port Facility Quay Disaster Recovery Work

Harbor facility quay disaster recovery work

In 2021, the earthquake off the coast of Fukushima caused multiple ground fissures in the loading area and storage yard of the Hibari district in Ishinomaki and Shiogama ports. Traditionally, repairs for similar ground fissures involved open excavation down to the deepest part of the fissure, followed by repeated compaction to create a subgrade. However, this time there were several challenges, leading to the decision to explore methods that could fill the fissures without excavation and within a short construction period. Among these, the Upcon method was adopted as the most effective technique. 【Site Information】 Total construction length: 503 m Maximum depth of fissure: 2,400 mm Construction period: 5 days For detailed explanations and observations of the construction, please refer to the PDF download below.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Akita Prefecture Port Facility (RTG Running Path) Repair Work Settlement Correction

Port facility quay disaster recovery work

The Upcon method, which allows for modifications without breaking existing concrete pavement slabs and within a short construction period, has been widely adopted in public works such as roads and airports as a maintenance repair method. This time, we will introduce a case of subsidence correction work for the RTG (rubber-tired gantry crane) running path slab at a container terminal within a port. Over time, the RTG running path slab had subsided, causing a step to form in the adjacent vehicle running path. Additionally, unevenness occurred in the longitudinal direction, which affected the operation of the RTG and snow removal work. Compared to other methods, the Upcon method was chosen because it allows for construction without breaking the RTG running path slab and without halting operations during the short construction period. 【Site Information】 Construction Area: 258 square meters Maximum Correction Amount: 57 mm Construction Period: 6 days (nighttime) For detailed explanations and visuals of the construction, please refer to the PDF download below.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Food Processing Plant: Earthquake Recovery Floor Slab Settlement Correction Work

Settlement of the earthen floor caused by the earthquake! Correcting the settled floor before the factory renovation work in a short period of time.

We would like to introduce a case of "floor sinking correction work (earthquake recovery work)" carried out at a food processing factory in Iwate Prefecture. Due to the impact of the Great East Japan Earthquake, extensive renovations were necessary, and to achieve a swift recovery, the Upcon method, which allows for quick corrections, was adopted. The construction area was approximately 1,135 m², with a maximum gap of 221 mm. The construction period was six days, utilizing two construction plant vehicles. [Case Overview] - Construction Area: Approximately 1,135 m² - Maximum Gap: 221 mm - Area: Iwate Prefecture - Construction Period: 6 days (Handled by 2 construction plant vehicles) *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Repairing the gaps between the floor and walls of a large shopping center.

A significant subsidence of the floor due to weak ground! Introducing a case where corrections were made at night during the business closure.

Here is a case study of "floor sinking correction" conducted at a large shopping center in Nara Prefecture. Due to weak ground, the floor had sunk significantly. As a result of the floor sinking, gaps were observed in various places, such as between the floor and walls and between the walls and ceiling. An up-con method that can be corrected during nighttime while the business is closed was adopted, and our company carried out the correction. 【Case Overview】 ■ Construction Area: Approximately 3,240m2 (Backyard 405m2, Store Interior 2,835m2) ■ Maximum Sinking Amount: 94mm ■ Area: Nara Prefecture ■ Construction Period: 25 nights *Supported by 2 construction plant vehicles *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete Column Urethane Reinforcement Method "Gankyō Column"

Inject rigid polyurethane resin into existing concrete columns for reinforcement with a short construction period. Prevent the collapse of concrete columns during natural disasters.

Natural disasters such as earthquakes and typhoons have caused utility poles to fall, obstructing emergency vehicles and delaying recovery efforts, which has become a social issue. In recent years, accidents have also occurred where strong winds have caused utility poles to fall, leading to traffic disruptions and damage to buildings and homes. Upcon has developed a concrete pole reinforcement method called "Sturdy Pole," which increases the destructive load capacity of existing concrete poles to prevent collapse. The "Sturdy Pole" method involves injecting high-strength foam polyurethane resin, specifically developed for reinforcement, into the hollow section of existing concrete poles, achieving a short construction period and ease of installation. This method increases the strength of existing concrete poles without the need for replacement. Since there is no need for removal, it helps reduce construction time and costs while also contributing to the resilience of the national infrastructure. 【Features】 1. Short construction period Special polyurethane resin is injected, quickly filling the cavity with foaming and expansion pressure. 2. Easy installation Only drilling and injection into the existing concrete poles are required, allowing for installation by a small team. 3. Suitable for narrow spaces Reinforcement in narrow areas or along major roads where replacing existing concrete poles is difficult can be easily accomplished. ■ More details can also be viewed in the PDF data.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Instant Hardening Coating Method "Swael Upper Water System"

The curing time after construction can also be shortened! Material management is easy, and uniform quality and film thickness management can be achieved.

We would like to introduce our instant curing coating method, the "Swael Drinking Water System." This revolutionary instant curing coating system is developed based on a spray technology that mixes and ejects two components: isocyanate and a special curing agent, which form a polyurea resin. It is designed for corrosion protection and waterproofing of concrete structures for drinking water. The use of a two-component high-pressure collision mixing spray machine has significantly reduced labor and dramatically improved construction efficiency. 【Technical Features】 ■ Instant curing ■ Cures regardless of humidity and temperature ■ Increased efficiency with a mechanical construction system ■ Excellent workability for ceilings and walls *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Water Treatment Conditioner CALFA BAS

"Cooling tower cooling water" water treatment conditioner! It does not contain "phosphorus or nitrogen," which are subject to "total water quality regulations," and is 100% environmentally friendly!

Environmentally Friendly Water Treatment Conditioner for Cooling Towers ~ Phosphate-free / Nitrogen-free / No Polymers ~ 'CALFA BAS' Solving cooling tower issues (silica and calcium scale) and reducing heat exchange with amorphous solid water treatment technology recognized in the environmentally advanced EU! - A simple, safe, reliable, and economical water treatment conditioner made only from "natural inorganic components," replacing the current management of circulating cooling water with organic compound chemicals. It efficiently removes silica scale that adheres to heat exchangers, maintaining optimal performance at all times, achieving significant energy savings and cost reductions. A different grade, 'CALFA BAS ~Free~,' is also available, which contains no components subject to the Water Pollution Prevention Act, Sewer Act, or Total Water Quality Regulation, making it 'discharge regulation-free!' A 100% environmentally protective conditioner has arrived! Only CALFA BAS can safely "remove and prevent silica scale." * 'CALFA BAS' is a registered trademark of Calfa Chemical Co., Ltd. Please be cautious of "similar products" and "imitations (copy products)."

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration