大亜ソイル

Contact this company
Contact Us Online
大亜ソイル Company Profile
We will respond to urban development with the reliable technology of "foundation pile construction method" aimed at the next generation!
Since our establishment in 1978, we have been engaged in "foundation work and pile work," which serves as the foundation for various structures for many years. We always strive to construct foundation piles that can safely and reliably support structures, utilizing various methods, including patented techniques, to improve the quality of pile construction.
Business Activities
【Business Categories】 ■ Earth Drill Type Enlarged Base Pile Method (HND Method) ■ STBC-SR II Cast-in-Place Steel Pipe Concrete Pile Method ■ Reseau fond pier Method ■ NS Eco Pile (Rotary Press-in Steel Pipe Pile Method) ■ All Casing Pile Method (Full Rotation Type) ■ Deep Foundation Pile Method ■ HND-NB Method (Cast-in-Place Concrete Pile Method with Enlarged Diameter Section at the Intermediate or Tip of the Pile, or Either One)
Recommended information
The pile method "Resophon Pier Method" prevents the leakage of ready-mixed concrete, ensuring safety even in hollow ground.
Simply cover the rebar cage with a net! Prevent concrete runoff into abandoned mines and drainage ditches. It prevents the mixing of impurities and enables high-quality pile construction even on weak ground.
During concrete placement, troubles such as the outflow of fresh concrete into cavities like horizontal holes, drainage ditches, and abandoned mines can be resolved with a simple construction method that involves covering the rebar cage with a net. This physically prevents the inclusion of soil and impurities, ensuring the construction of high-quality piles as designed. This pile construction method is ideal for sites requiring reliable quality control in soft ground conditions such as peat layers and reclaimed land. <Features of the Resophon Pier Method> ■ Thorough protection against concrete outflow: A permeable synthetic fiber net prevents outflow into cavities. ■ Prevention of impurity inclusion: It prevents soil from mixing into the ground, ensuring the integrity of the piles. ■ Versatile method applicable to various techniques: Compatible with earth drills, all-casing methods, and underground continuous walls. ■ Over 250 successful cases: Widely adopted in public works by the Ministry of Land, Infrastructure, Transport and Tourism and in private projects. ■ Hassle-free construction method: Simply cover with a lightweight lattice mesh fabric. No special skills required. *For more details, please download the PDF or feel free to contact us.
Products/Services (11)
catalog(2)
Survey responses are required to view e-book details. Click to view the e-book.
news(2)
Detailed information
| Company name | 大亜ソイル |
|---|---|
| number of employees | 18 |
| Contact address | postalcode 103-0001 Tokyo/ Chuo-ku/ 5-15 Nihonbashi Kodenmachō, Ōkura BuildingView on map TEL:03-3661-6031 FAX:03-3661-6160 |
| Industry | Other construction industries |
大亜ソイル Building Image
