Construction method (bellows unit method)
The construction period for rebar assembly work can be shortened. (About half of the usual on-site assembly time) Assembly in the factory improves work efficiency and leads to a reduction in personnel. Since pre-assembly can be done, installation on-site can be carried out by a small number of people. By folding the components, efficiency during transportation can be improved compared to traditional factory pre-assembly methods.
Inquire About This Product
basic information
The construction period for rebar assembly can be shortened. (About half of the usual on-site assembly time) Assembly in the factory improves work efficiency and leads to a reduction in personnel. Since preliminary work can be done, installation on-site can be carried out with fewer people. By folding the components, efficiency during transportation can be improved compared to traditional factory pre-assembly methods.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
General construction, etc.
catalog(1)
Download All CatalogsCompany information
A major revolution in rebar construction! Assembled rebar can be folded freely.



![[Construction Information] Cutting and drilling structures without using water - Dry diamond method](https://image.www.ipros.com/public/product/image/d4b/2001334644/IPROS17825609710203586506.png?w=280&h=280)
![[Catalog] Construction Method](https://image.www.ipros.com/public/product/image/23a/2000720178/IPROS96933943588621603187.jpeg?w=280&h=280)

![Tometaro Non-curing Water Stop Material [Rodent Control Measures - Rodent Prevention NETIS Registered]](https://image.www.ipros.com/public/product/image/de1/2000953404/IPROS91492270909228477210.png?w=280&h=280)
![Non-drying polyolefin-based one-component waterproofing putty "Tometaro" [NETIS registered]](https://image.www.ipros.com/public/product/image/ceb/2001411481/IPROS09042418105265901879.png?w=280&h=280)


