Construction method Product List and Ranking from 1588 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:May 06, 2026~Jun 02, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:May 06, 2026~Jun 02, 2026
This ranking is based on the number of page views on our site.

  1. AP工法協会 Tokyo//Interior construction business
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. 徳和工業 Miyagi//Other construction industries
  4. 4 アーキヤマデ Osaka//Building materials, supplies and fixtures manufacturers
  5. 5 アウロステクノロジーズ Ishikawa//others

Construction method Product ranking

Last Updated: Aggregation Period:May 06, 2026~Jun 02, 2026
This ranking is based on the number of page views on our site.

  1. Wet-type spray seismic reinforcement method "AP Method" AP工法協会
  2. Vacuum concrete construction method 徳和工業
  3. APLAS Sheet Method for Shortening Construction Periods of Aging Infrastructure Reinforcement アウロステクノロジーズ
  4. 4 Soil Coating Method "PoliSoil Greening" <NETIS Registered> 丸八土建
  5. 5 Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研

Construction method Product List

4261~4290 item / All 4324 items

Displayed results

Sinking Correction Method: Load-Bearing Slab Method

Create improved ground from the support layer to take reaction forces! Suitable when the layer of weak ground under the building is less than 1.5m.

The "Pressure-resistant slab method" is a settlement correction method used when there is a layer of weak ground less than 1.5 meters beneath a building. It creates improved ground from the supporting layer to take reaction force. By correcting the building to a solid ground, it is possible to reduce earthquake damage. The building's tilt is jacked up and leveled, restoring a comfortable and safe living environment. 【Features】 ■ Suitable when there is a layer of weak ground less than 1.5 meters beneath the building ■ Creates improved ground from the supporting layer to take reaction force ■ Reduces earthquake damage by correcting the building to a solid ground ■ Jacks up the building to level it and restores a comfortable and safe living environment *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground improvement
  • Residential foundations
  • Earthquake-resistant construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction method: foundation raising method

Jack up only the building above the foundation using the base as a reaction force! This is an introduction to the sinking correction method.

The "Foundation Lifting Method" is a sinking correction method used when the settlement of a building has stabilized. It involves jacking up only the building above the foundation, using the foundation as a reaction force. This method corrects the tilt of the building by jacking it up to restore it to a level position, allowing for a comfortable and safe living environment. 【Features】 ■ Suitable for cases where the building's settlement has stabilized ■ Jacks up only the building above the foundation, using the foundation as a reaction force ■ Corrects the tilt of the building by jacking it up to restore a level position, allowing for a comfortable and safe living environment *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground improvement
  • Residential foundations
  • Earthquake-resistant construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A must-see! Comprehensive equipment and tools for asbestos removal work in commercial buildings.

All materials for floor removal, wall sanding, and scraping will be ready.

In asbestos removal work that occurs during the demolition of commercial buildings and factory structures, various equipment and grinding tools are required. Our company has quickly proposed floor polishing machines to asbestos removal specialists, and they are currently being utilized. At the same time, we also provide various scraper replacement blades for wall sanding tools and hammer scraping for wet asbestos hidden in ceiling areas. We can respond to any region within the country, so please feel free to consult with us first. ★ For inquiries regarding our products, please contact us through our company website. Inquiries through this site cannot be used. Website: https://www.ebisu-tool.org

  • Dismantling and moving
  • Dismantling equipment and parts
  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

「CFS工法」で建築した多機能型障がい者施設!※施工動画あり

鉄骨・RC工法と比べ工期が短く低価格なスチール建材!パネル製造は自社で行うため、高精度で低コストを実現!

新工法「CFS工法」は、耐久性・耐震性の高い2×4スチールハウスです。 2×4スチールハウスは亜鉛めっき鋼板を使用しており高い耐久性を実現! 木造パネルの1.5倍の強度がありながら、RC・重量鉄骨よりもローコストで、品質と価格のバランスが優れています。 RC・鉄骨造の費用減や工期短縮、木材の代替としてCFS工法を導入したい等様々なご要望にお応え致します。 CFS工法導入についてご不明点、御見積等ご要望がございましたら、是非一度一度お問合せ下さい。 ※カタログはPDFをダウンロードして頂くか、お問い合わせください。

  • Wood panel and frame wall construction
  • Structural Materials
  • Systems Architecture
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete anti-corrosion method "Vandex WS System"

Concrete anti-corrosion method with excellent workability, water resistance, and chemical resistance.

The "Vandex WS System" excels in the durability and protection of concrete, possesses high safety standards, and is a concrete anti-corrosion method suitable for drinking water and other potable water applications, compliant with the Japan Water Works Association standard JWWA K 143 for "solvent-free epoxy resin coatings for the inner surfaces of concrete water tanks." Since it is a solvent-free epoxy resin coating, it does not contain solvents, eliminating the risk of solvent poisoning, and there is almost no shrinkage after curing. 【Features】 ■ Complies with Japan Water Works Association standard K 143 ■ Safe to handle ■ Excellent filling properties for pinholes in concrete substrates and workability with trowels ■ Superior mechanical strength after curing ■ Excellent water resistance and chemical resistance after curing *For more details, please download the PDF or feel free to contact us.

  • Anti-rot, anti-termite, anti-mold material
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reduce the risk of fuel oil leakage (environmental pollution)! Underground buried resin double-shell piping.

Double the piping to dramatically reduce the risk of fuel oil leakage (environmental pollution)! Capable of pinpoint detection of fuel oil leaks from within!

The "Leak Detection Device Equipped Underground Buried Resin Double-Shell Piping" features a structure that incorporates sensors in the gap between the inner oil transport (main) pipe and the outer shell pipe of the double-shell piping. Patent: No. 4421711, Utility Model: No. 3183085, Patent Application: 2014-235598, Patent Application: 2015-115624 - Double Piping Structure Utility Model: No. 3195379, Patent Application: 2014-176033, Utility Model Application: 2014-005777 - Piping Structure [Features] ■ Pinpoint detection of leaks from external water and internal fuel oil ■ Doubling the piping significantly reduces the risk of fuel oil leaks (environmental pollution) ■ Repairs can be made to the faulty areas before any harm occurs, among others *For more details, please download the PDF or contact us.

  • Piping materials (plastic pipes)
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Integrated construction method for expansion devices and waterproofing of floor slabs - AOS method (NETIS)

[NETIS Registration Method] No need for processes such as anchor installation or rebar welding! A method that integrates expansion devices and floor waterproofing, reducing construction and curing time by 50%.

The "Integrated Method of Expansion Devices and Deck Waterproofing (ARCHIST ONEPIECE-GEL SYSTEM®)" achieves a reduction in construction time and high economic efficiency by using the same asphalt emulsion-based expansion material and waterproofing material, allowing for the installation of embedded expansion devices and membrane-type deck waterproofing. This method maintains both the expansion device function and waterproofing function in bridges. *For bridge surface waterproofing materials, both room temperature membrane-type waterproofing materials (ONEPIECE-GEL PROOF) and membrane-type deck waterproofing (asphalt heating type) can be used. 【Features】 ■ More than 15% reduction in construction costs compared to conventional methods ■ Easy to construct at room temperature, enabling a reduction in construction time ■ Passes performance verification tests for 15 years *For more details, please contact us or download the PDF to view.

  • Bridge Construction
  • Coating film waterproofing material/permeable waterproofing material
  • Bridge Materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Prevent concrete runoff in the peat layer! "Reseau fond pier Method"

Prevent concrete runoff even in weak peat layers, achieving high-quality pile construction.

The peat layer is extremely soft, and traditional pile construction carries a high risk of concrete leakage, making quality assurance a challenge. The Reseau fond pier Method effectively suppresses concrete leakage by covering the pile reinforcement cage with a Reseau fond net. It enables stable pile construction even in sites with low ground strength. It uses a lightweight and easy-to-handle polyethylene permeable lattice fabric, which can be introduced without increasing construction effort. It accommodates various methods, including earth drill methods and all-casing methods. There are over 250 successful projects in both public and private construction. This method is helpful for ensuring quality and controlling costs in pile construction on peat ground. *For more details, please check by clicking the "Download Catalog" button.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Outflow measures for limestone layers with cracks! "Reseau fond pier Method"

It suppresses the risk of concrete loss due to cracks and voids in the limestone layer.

In limestone layers with cracks, there is a possibility that concrete may flow out through the fissures, leading to increased costs and insufficient pile cross-sections. The Reseau fond pier method covers the perimeter of the rebar cage with a highly durable net, effectively preventing outflow into the cracks, which allows for reduced concrete loss and stable quality. It can be used with various pile methods and can be applied without increasing the burden of construction, which is a significant feature. It boasts over 250 adoption cases in both public and private sectors. It is recommended for sites pursuing reliable pile construction in uncertain limestone ground. *For more details, please check by clicking the "Download Catalog" button.*

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Securing pile concrete at a coal mine site! "Reseau fond pier Method"

We will control the outflow into the cavities and cracks of the former coal mine site and ensure the integrity of the pile cross-section.

In abandoned coal mine sites, there are often cases where cavities of various sizes remain underground, posing a risk of concrete leakage during pile construction. The Reseau fond pier method easily covers the outside of the rebar cage with a Reseau fond net, preventing leakage into the cavities and ensuring the designed cross-section is maintained. Due to its lightweight nature, it is easy to handle and can be implemented without compromising construction efficiency. It has a wealth of proven results in both public and private projects and is increasingly adopted as a reliable quality improvement method. This method is useful for projects that aim to ensure reliable pile quality in the special ground conditions of abandoned coal mines. *For more details, please check by clicking the "Download Catalog" button.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Weed Coat Method for Construction

Suppressing weeds in curbs and gaps! Site-following resin-based weed control material.

Weeds growing from the gaps between the pavement and the curbs, as well as from the joints of structures, can accelerate the deterioration of those structures. Additionally, they detract from aesthetics and lead to increased maintenance costs. The Weed Coat method provides high weed prevention performance through a polyurethane resin coating to address these issues. 【Usage Scenarios】 - Gaps between pavement and curbs - Joints of structures - Parking lots - Sidewalks 【Benefits of Implementation】 - Protection of structures through high waterproof performance - Maintenance of aesthetics through weed suppression - Reduction of maintenance costs - Consideration for landscape through a variety of color options

  • DSC_1629.jpg
  • DSC_0858.jpg
  • DSC_1999.jpg
  • 支柱周り.JPG
  • ホワイト.jpg
  • Road facilities
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Weed Coat Method for Agriculture

Suppressing weeds in curbs and gaps! Site-adaptive resin-based weed control materials.

The emergence of weeds from gaps around fields and facilities, as well as from curbs and structures, increases the labor involved in weeding and leads to higher costs. The Weed Coat method seals these gaps with polyurethane resin, suppressing weed growth and reducing management efforts. 【Usage Scenarios】 * Curbs around fields * Gaps around facilities * Pathways 【Benefits of Implementation】 * Reduces the frequency of weeding * Lowers management costs * Maintains aesthetics

  • DSC_1629.jpg
  • DSC_0858.jpg
  • DSC_1999.jpg
  • 支柱周り.JPG
  • ホワイト.jpg
  • Road facilities
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Weed Coat Method for Amusement Parks

Suppress weeds from curbs and pavement! A beautiful amusement park with the weed coat method.

In amusement parks, maintaining aesthetics is the top priority. In particular, weeds growing from curbs and pavement significantly detract from the visual appeal. The weed coat method addresses these issues and supports the operation of beautiful amusement parks. 【Usage Scenarios】 - Sidewalks in amusement parks - Stairs - Poolside - Around attractions 【Benefits of Implementation】 - Weed suppression - Color variations that do not compromise aesthetics - Reduced maintenance costs due to high durability

  • DSC_1629.jpg
  • DSC_0858.jpg
  • DSC_1999.jpg
  • 支柱周り.JPG
  • ホワイト.jpg
  • Road facilities
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Weed Coat Method for Parking Lots

It suppresses weeds growing from the sides of the parking lot asphalt and concrete, maintaining its aesthetic appeal.

In parking lots, weeds growing from the sides of asphalt and concrete not only detract from the aesthetic appeal but also promote deterioration due to rainwater infiltration, potentially leading to further damage. Additionally, the increased management effort is also a challenge. The Weed Coat method was developed to address these issues. 【Usage Scenarios】 * Suppression of weeds from the sides of asphalt pavement * Suppression of weeds from the sides of concrete pavement * Suppression of weeds from the sides of pathways within parking lots 【Benefits of Implementation】 * Prevents weed infiltration from cracks, extending the lifespan of the pavement. * Suppresses weed growth, reducing maintenance costs. * Maintains aesthetic appeal and enhances the value of the parking lot.

  • DSC_1629.jpg
  • DSC_0858.jpg
  • DSC_1999.jpg
  • 支柱周り.JPG
  • ホワイト.jpg
  • Road facilities
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Weed Court Construction Method for Sports Facilities

Supports curbs and curves! Site-following resin-based weed control material.

Weed control in sports facilities is important for maintaining the aesthetic appeal of the facility and ensuring the safety of users. In particular, in outdoor facilities, the emergence of weeds not only detracts from the appearance of the pavement but also increases cleaning efforts and contributes to higher maintenance costs. The Weed Coat method suppresses weed growth through a polyurethane resin coating, helping to maintain the aesthetic appeal around the pavement. 【Usage Scenarios】 - Pathways - Boundaries with retaining walls of other sports facilities 【Benefits of Implementation】 - Maintenance of aesthetics through weed suppression - Reduction in cleaning and maintenance costs - Increased value of the facility

  • DSC_1629.jpg
  • DSC_0858.jpg
  • DSC_1999.jpg
  • 支柱周り.JPG
  • ホワイト.jpg
  • Road facilities
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Weed Coat Method for Schools

Field-following resin-based weed control materials that suppress weeds and maintain a safe environment.

At school, the safety of students and staff is the top priority. In areas with high foot traffic, such as playgrounds and school routes, the growth of weeds can increase the risk of slips and falls, potentially compromising safety. Additionally, the proliferation of weeds can detract from the landscape and increase maintenance efforts. The Weed Coat method addresses these issues and creates a safe and comfortable school environment. 【Usage Scenarios】 - Around playground curbs - Sidewalks on school routes - Parking lots - Bicycle parking areas 【Benefits of Implementation】 - Suppresses weed growth and reduces the risk of slips and falls - Maintains the landscape and reduces management costs - Provides a safe and clean environment

  • DSC_1629.jpg
  • DSC_0858.jpg
  • DSC_1999.jpg
  • 支柱周り.JPG
  • ホワイト.jpg
  • Road facilities
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic retrofitting of large-diameter drainage pipe outlet using the "Magma Rock Method NGJ"

Non-excavation sewer pipelines (large diameter, φ800 to φ3000) seismic resistance technology. Cylindrical stainless steel and rubber sleeves designed to withstand Level 2 seismic motion.

The Magma Lock method, developed for the seismic reinforcement of pipe joint sections, demonstrates water-tight performance capable of withstanding disconnection due to level 2 seismic motion. This method involves pre-cutting grooves (joints) at the connection between the main pipe and the manhole, installing the Magma Lock, and concentrating seismic stress at this point to induce cracking in the joint. The shock absorption effect helps prevent damage to the connection. In areas where cracks occur along the joint, the pre-installed Magma Lock prevents the inflow of groundwater and soil into the pipe. Additionally, this seismic reinforcement method can be reliably installed even when the existing pipe is in a flowing state, as long as the water depth is 25% or less of the pipe diameter (maximum water level of 40 cm), targeting the connection between the manhole and the pipe. 【Applications】 ● Seismic reinforcement of the connection between manholes and pipes (circular pipes).

  • Sewerage facilities
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

KG Caisson Blade Soil Removal Device

A sediment removal system that promotes settlement by the jet flow of a submersible pump to remove soil from the lower part of the blade edge.

The "KG Caisson Cutter Sediment Removal Device" is a technology that removes sediment from the bottom of the cutter during the installation of open caissons using the jet flow from an underwater pump. With approximately ten times the water volume and significant jet force compared to conventional water jets, this device can also handle the installation in hard sandy soil layers. By attaching a 90° elbow to the underwater pump, downward jet discharge is achieved. Please feel free to contact us if you have any inquiries. 【Expected Effects】 ■ Improved removal efficiency with strong jet force, ensuring reliable removal of sediment beneath the cutter. ■ Remote operation of the device eliminates the need for divers to perform high-pressure work, reducing labor costs. ■ Downward jet projection breaks up sediment in the central part of the caisson, enhancing excavation efficiency. ■ After installation is complete, reliable removal of sediment adhering to the cutter improves integration with the bottom slab concrete, reducing leakage. *For more details, please download the PDF or feel free to contact us.

  • Piles, caissons, sheet piles
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Leave the blasting work in Hiroshima to Harada Ironworks!

Please feel free to consult us about sandblasting and grit blasting.

If you have requests for sandblasting or grit blasting in Hiroshima, please feel free to consult us. Blasting is a type of surface treatment process that involves colliding various particles with a material to remove the surface and create irregularities. Its effects are as follows: Surface cleaning: It removes oxidation films, rust, and dirt, achieving a clean surface. Improved adhesion: The increase in surface area due to the formation of irregularities creates an "anchor effect," enhancing adhesion with the paint. The durability of the paint is influenced by various factors such as the number of coats and the type of paint, but the impact of the grade of surface treatment can be as much as 50%. Surface preparation is the most important factor in painting. Harada Ironworks is a company with a proud history of 80 years in Hiroshima and possesses one of the largest blasting facilities in the Chugoku region. Please feel free to consult us about painting after blasting. We are here to help. Harada Ironworks Hiroshima Official Link

  • Rust Inhibitor
  • Special Construction Method
  • paint
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Features of the TNF method (1)

Introducing the features of our TNF method, which has reduced costs by approximately 30% compared to traditional pile foundations!

We would like to introduce the features of the "TNF Method," implemented by Yoshimitsu Corporation, which has over 1,300 achievements nationwide. In soft ground across the country, we perform ground improvement to create an artificial bedrock suitable for the building. Compared to conventional methods (pile foundations), we can achieve approximately 30% cost reduction (for a total floor area of 1,000 m² and pile length of 30 m). Please feel free to contact us when you need our services. 【Features】 - Compared to conventional methods, there is no need for pile work, formwork work, or ground preparation work, resulting in a 50% reduction in construction time (for a total floor area of 1,000 m² and pile length of 30 m). - Since no piles are used, the demolition costs during building dismantling are also reduced. *For more details, please refer to the related links or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Features of the TNF method (3)

No use of stakes! Introducing the features of the TNF method, which can also reduce demolition costs during building demolition!

We would like to introduce the features of the "TNF Method," implemented by Yoshimitsu Corporation, which has over 1,300 achievements nationwide. We carry out ground improvement to create an artificial bedrock suitable for buildings on weak ground across the country. Since we do not use piles, the demolition costs during building dismantling are also reduced. Please feel free to contact us when needed. 【Features】 ■ Approximately 30% cost reduction compared to conventional methods (pile foundation) (for a total floor area of 1,000 m² and pile length of 30 m) ■ Construction period shortened by 50% compared to conventional methods, as pile work, formwork work, and ground preparation work are not required (for a total floor area of 1,000 m² and pile length of 30 m) *For more details, please refer to the related links or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Disaster Measures] A must-see for those who want to reduce the amount of leftover soil! Liter Method

Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】

Are you facing any of these issues with construction-generated soil? - Want to reduce the amount of leftover soil disposal? - Disposal costs are high? - It's difficult to find a disposal site that will accept it? ⇒ The self-propelled soil improvement machine 'Litera Method' can solve these problems! Since it is self-propelled, it recycles the soil discharged from the construction site on-site using cement or lime. This results in cost reduction compared to disposing of the soil. Furthermore, it can be operated in narrow yards, and due to its high improvement efficiency, the amount of untreated soil falling off is greatly reduced. With less dust, it can be operated in residential areas and alongside roads. 【Features】 ■ Prevention of environmental destruction and elimination of secondary pollution ■ Significant cost reduction made possible by on-site processing ■ High-quality assurance due to high-performance soil improvement machinery ■ Can be operated in narrow yards ■ High improvement efficiency greatly reduces the amount of untreated soil falling off ■ With less dust, it can be operated in residential areas and alongside roads *For more details, please download the materials or contact us through our website.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Buried tank

It is made of polyethylene with excellent pressure resistance, molded as a seamless, integrated unit for use as a water reservoir or sewage tank!

Suiko offers "buried tanks." Our product is made of polyethylene with seamless, one-piece molding that provides excellent pressure resistance. It uses materials that are easy to recycle and environmentally friendly. Additionally, by connecting multiple tanks, large capacities can be secured. Please use it for rainwater, snowmelt, drainage tanks, as well as for reserve water and wastewater tanks. 【Features】 ■ Environmentally friendly material that is easy to recycle ■ Large capacities can be secured by connecting multiple tanks *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Roof Sanko Single Guard

Achieve rust prevention and weather resistance with a single coat! Shorten construction time and reduce initial costs.

The Sanko Single Guard is a polyurethane epoxy resin composite coating. It is a coating that combines the properties of both primer and topcoat, allowing for shortened construction periods and reduced process costs. Additionally, we can propose low-cost painting specifications. 【Standard Coating Specifications - Finishing Process】 ■ Number of Coats: 1 ■ Usage kg/m2: 0.29 ■ Standard Film Thickness μm: 80 ■ Standard Warranty Period: 5 years *For more details, please refer to the PDF document or feel free to contact us.

  • paint
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Roof Monitoring Program

Inspection by experienced engineers! Support for using the building with peace of mind.

The "Monitoring Program" is a support program that continues to watch over your roof and exterior walls. Long-term warranties are made possible through cultivated technical skills and quality management. Additionally, we provide support for our customers to use their buildings with peace of mind by conducting inspections carried out by experienced technicians. 【Features】 ■ Initial warranty period of up to 15 years (for leaks, detachment, and falling into the interior) ■ Maintenance through responsible construction ■ Free inspections during the warranty period *For more details, please refer to the PDF materials or feel free to contact us.

  • Other Management Services
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Temporary Closure Waterproof Sheet Method for Dams

Perfect for reinforcing movable weir pillars that can adjust water levels and flow rates for seismic reinforcement measures!

In the dam industry, the safety of structures and consideration for the environment are important. Aging-related leaks can lead to a decrease in dam functionality and impact the surrounding environment. Particularly in the reinforcement work of movable weir pillars, reliable water-stopping measures are required without applying excessive pressure on the movable gates. Our temporary closure waterproof sheet method eliminates the need for water-stopping packing and achieves water stopping through waterproof sheets. This ensures the safety of the dam and reduces environmental impact. [Usage Scenarios] - Reinforcement work for movable weir pillars - Leak prevention measures for dam embankments - Renovation work requiring temporary closures [Effects of Implementation] - Improved safety through reliable water-stopping performance - Shortened construction period and cost reduction by eliminating the need for water-stopping packing - Environmental consideration through the reuse of liner plates - Reduction of loads acting on the gate body

  • 図2.png
  • 図3.png
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【ER Ground Improvement Seminar】Session 8: Main Types and Features of Ground Reinforcement Methods

Characteristics of general construction methods and key points to note! Introducing the basic concepts of method selection and surface ground improvement!

The ER Ground School is a ground course for small-scale buildings, delivered in collaboration with a ground consultant (representative of Blue Sage Co., Ltd.) and Earth Relations. In the 8th session, we will clearly explain "Main Types and Features of Ground Reinforcement Methods" through a PowerPoint video. In the additional explanation, we will introduce "Materials for Columnar Ground Improvement" (in the case of general methods). For more details, please refer to the related links. [Key Points] 1. Construction procedures, features, and precautions for each method - Basic considerations for method selection - Surface ground improvement - Columnar ground improvement - Precast concrete piles - Small-diameter steel pipe piles *For more details, please refer to the related link page or feel free to contact us.

  • Ground foundation construction method
  • Site and ground investigation
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Non-excavation renewal method "D-PS method"

A trenchless renewal method that paves the way for the future!

The "D-PS method" is a non-excavation renewal method that has adapted traditional methods, which primarily targeted small diameters (50A), to accommodate larger diameters (up to 200A). It is possible to reduce construction costs and environmental impact by alleviating excavation work, as well as reducing excavation soil, backfill soil, and road restoration costs, which are characteristic of existing non-excavation methods. Please feel free to contact us if you have any inquiries. 【Features】 ■ The use of wire pulling allows for faster installation and removal of equipment, enabling continuous pulling operations and improving work efficiency. ■ With a maximum construction length of 55m, it is possible to reduce construction days and lower construction costs. ■ The blade recovery device makes it easier to separate from existing pipes, enhancing work efficiency. *For more details, please download the PDF or contact us.

  • Renovation and repair methods
  • Special Construction Method
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Kaiser Balcony Method (Steel Structure)

We will streamline the work at the tip of the balcony, which requires difficult and advanced construction techniques!

The "Kaiser Balcony Construction Method (Steel Structure)" involves fully precasting the tip of the balcony that connects to the steel frame (S structure) and using half precast panels with truss reinforcement. The tip of the balcony is complicated due to the presence of drainage channels and handrails, requiring advanced construction techniques. By manufacturing the truss-reinforced half precast panels at a specialized precast factory, we can simplify these challenging on-site tasks while ensuring high quality. This eliminates the need for cantilever beams, resulting in a cleaner finish. Feel free to leave proposals and drawings to us. If you have any inquiries, please do not hesitate to contact our company.

  • 5-2.jpg
  • 5-3.JPG
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Height 1.8m × Thickness 15cm】Collapse-resistant exterior structure Stone Fence

With a solid foundation and a structure that is resistant to collapse during earthquakes, you can feel secure even with its height!

"Stone Fence" is a product developed with the primary challenge of harmonizing with nature and providing visual comfort in a landscape often dominated by inorganic concrete and block walls. By using "stone," a naturally occurring and corrosion-resistant material, the fence gains character and achieves harmony with nature. Of course, it is designed to withstand natural disasters such as typhoons and earthquakes, ensuring safety. [Usage Scenarios] ■ As exterior decor for residential properties. It can also be used as a soil barrier for flower beds. ■ As exterior structures for large facilities such as public buildings and offices. ■ At the boundary with roads. In the event of a vehicle collision, it serves as a cushioning material. *For more details, please download the PDF or feel free to contact us.

  • Fences, screens, and partitions
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration