Construction method Product List and Ranking from 1591 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Mar 25, 2026~Apr 21, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Mar 25, 2026~Apr 21, 2026
This ranking is based on the number of page views on our site.

  1. 成瀬化学 Mie//Building materials, supplies and fixtures manufacturers
  2. コンステック Osaka//General contractors and subcontractors
  3. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  4. 4 TRAWE main office Saitama//Other construction industries
  5. 5 大建工業 Tokyo//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Mar 25, 2026~Apr 21, 2026
This ranking is based on the number of page views on our site.

  1. Waterproof layer renovation method for achieving the long lifespan of facilities! Narlite injection method. 成瀬化学
  2. Roof insulation and waterproofing renovation method "Rimtect Method" コンステック
  3. 建物外壁工事 ロープアクセス工法 TRAWE main office
  4. 4 Vacuum concrete construction method 徳和工業
  5. 5 D-Lite D Board Method [Non-combustible decorative panel that can be processed on-site] 大建工業

Construction method Product List

2971~3000 item / All 4298 items

Displayed results

Panel formwork hardware "Separat"

Angle with screws for formwork used as auxiliary materials for retaining wall formwork! Hardware developed from on-site work.

"Sepatle" is an angle with female threads for attaching a round separator. It considers the safety and health of workers by reducing the risk of slipping due to oil, which is common during handling, and by minimizing the combustion of adhered oil and the generation of fumes during welding operations. Additionally, by using carefully selected oils, we have reduced the amount of oil adhesion that occurs during the manufacturing process (compared to our company standards). 【Features】 ■ Less likely to become sticky with oil ■ Uses carefully selected oils ■ Reduces the amount of oil adhesion during the manufacturing process ■ Reduces combustion of adhered oil and generation of fumes ■ Considers the safety and health of workers *For more details, please refer to the PDF materials or feel free to contact us.

  • Subsidiary materials
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Yoshida Ironworks Construction Department - Business Overview

Technology and know-how to accommodate various types of buildings! By collaborating with the steel structure department, we practice high-quality work.

Our construction department started operations in 1958 and is now a comprehensive construction contractor, handling both general and public buildings, as well as public civil engineering works such as bridges. This division can consistently manage everything from design to construction and aftercare in-house. We possess the technology and know-how to accommodate any type of building, from wooden structures to steel constructions, and we can build completely custom-designed homes. Additionally, while we do not have a housing exhibition hall, we hold property tours for interested customers to view completed projects. By seeing them in person, we aim to help them understand the features of "houses built by Yoshida Iron Works." [Qualified Personnel List] ■ Supervising Engineers: 10 ■ First-Class Architects: 5 ■ First-Class Construction Management Engineers: 8 ■ First-Class Civil Engineering Management Engineers: 6 *For more details, please refer to the PDF materials or feel free to contact us.

  • Systems Architecture
  • Other construction services
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Completely non-destructive rebar corrosion detector "iCOR"

Corrosion speed can be instantly grasped and is optimal for maintenance management!

◆◇◆ A new era of rebar corrosion exploration has arrived. Measuring rebar corrosion rates contributes to the longevity of concrete structures ◆◇◆ This is a completely non-destructive detector for rebar corrosion in concrete, utilizing innovative algorithms. Until now, measurements required multiple devices, but the iCOR can measure “simultaneously” and in “just a few seconds” with “one device.” It allows for extensive exploration without being affected by cable length, significantly reducing damage to concrete structures, as well as time, human resources, and costs compared to traditional rebar corrosion exploration methods. 【Features】 ■ No contact with rebar required due to concrete drilling 【Completely non-destructive】 ■ Simultaneous measurement of 【rebar corrosion rate】【concrete electrical resistivity】【natural potential※】, serving three functions with one device ■ Measurement time of 3 to 10 seconds per point ■ Significant reduction compared to the polarization resistance method (over 10 minutes per point) ■ Uses maintenance-free electrodes ■ Wireless connection between electrode and tablet ■ One person can handle everything from measurement to report creation, producing three types of corrosion maps (rebar corrosion rate, concrete electrical resistivity, natural potential※) on-site and determining corrosion locations immediately ※ Contact with rebar is required *For more details, please contact us below or download the catalog.

  • 無題.png
  • WS000001.JPG
  • WS000000.JPG
  • Rock drills, demolition machines, and excavators
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP molded product roof covering method

Achieve waterproofing for roofs simply by covering with FRP molded products (tile rods, slate roofs, folded plate shapes)!

This construction method allows for waterproofing simply by covering with FRP molded products (such as tile bar, slate roofs, and folded plate shapes) instead of applying waterproof coatings or sheets. Due to the lightweight nature of the FRP molded products, which weigh between 2.5 to 5 kg/m², the burden on the roof is minimized. This also makes installation on sloped roofs easier and enhances the safety of workers. It is possible to install FRP molded products up to 13 meters in length, which, combined with their lightweight nature, leads to a reduction in construction time. 【Features】 - Lightweight and reduced construction time - Energy-saving - Recyclable materials and methods - Increased longevity of buildings, enhanced roof strength, and improved corrosion resistance of roofs - Insulation method *For more details, please download the PDF or contact us.

  • Roof and gutter construction
  • Tile and slate roofs
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Raku Base

The surface has a non-slip finish! It does not put a strain on the outdoor unit and piping.

"Raku Base" is simply inserted and fixed before the waterproofing process, placing no burden on the outdoor unit and piping. The surface has a non-slip finish, and the back is cushioned, preventing water pooling. Additionally, it does not wrinkle, and there is no concern about missing spots in the waterproofing material. 【Features】 ■ No burden on the outdoor unit and piping ■ No concern about missing spots in the waterproofing material ■ Does not wrinkle ■ Non-slip finish on the surface ■ Cushioned back to prevent water pooling *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Water Stop Rubber Refreshing Method

A new one-of-a-kind construction method created by innovative technology focused on expansion and contraction devices! The joint body remains unchanged, allowing for a simple construction process for a refresh.

This construction method allows for the easy replacement of only the waterproof rubber on-site, without damaging the main body itself, which is equipped with a guide top joint. The guide top joint demonstrates excellent performance in terms of durability, drivability, and noise and vibration. The establishment of this method truly showcases its unique capabilities and contributes to reducing social costs. 【Features】 ■ Short construction period ■ Low noise ■ Low cost *For more details, please download the PDF or feel free to contact us.

  • 止水ラバーリフレッシュ工法_02.jpg
  • Bridge Materials
  • Bridge Construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Self-supporting retaining wall "YOSAKU Method"

Reduce excavation volume and earthworks to shorten construction time and cut costs!

The "YOSAKU Method" is a construction technique characterized by an integrated structure of concrete walls and pile foundations to support lateral earth pressure and vertical loads. It allows for low costs and minimizes the amount of soil excavation, resulting in a highly efficient retaining wall. It is particularly effective in sloped areas or places with elevation differences. Unlike conventional methods, it does not require a foundation base, making it possible to reduce soil-related issues during excavation (such as movement, processing, and softening) as well as their impact on the surrounding area and costs. 【Features】 ■ Reduces the amount of excavated soil and earthwork, significantly decreasing the workload ■ Shortens construction time and reduces costs ■ No foundation base required ■ Reduces soil-related issues during excavation (such as movement, processing, and softening) and their impact on surrounding costs *For more details, please refer to the PDF document or feel free to contact us.

  • Retaining wall
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Comprehensive Catalog of Machinery for Promotion Methods for Sewer and Drainage Maintenance!

A wide range of items compatible with thrusting methods, such as the "PIT method" which is free from vibration and noise, is featured!

The "Comprehensive Catalog of Machinery for Push Construction Methods" is a comprehensive catalog from Nagano Yuki, a manufacturer of hydraulic system equipment that plays an active role in infrastructure development, including water supply and sewage systems. It features environmentally friendly construction methods such as the "PIT Method," which uses a vibration-free and low-noise oscillating pressure insertion shaft construction machine, as well as the "Strike Method," which employs special branch pipes that are earthquake-resistant and watertight. It also includes push jacks and thrust jacks. [Contents Included] ■ PIT Method ■ DRM Method ■ Strike Method ■ Wild Boar Method ■ Pit Mini Method, etc. *For more details, please refer to the PDF document or feel free to contact us.

  • Pipeline Construction
  • Sewerage facilities
  • Foundation construction machinery
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Strike Method: Installation Pipe Advancement Method Using Combined Auger Pressing

A construction method for installation pipes using a combined auger and pressure insertion technique that incorporates special branches with earthquake resistance and water tightness!

The "Strike Method" is a pipe installation and advancement technique that utilizes a combined auger and pressure insertion method to achieve effective ground improvement by injecting chemical solutions after the arrival of the casing pipe at the main pipe to be installed. Even when installing the main pipe under heavily trafficked roads, construction can be carried out from a distant shaft, contributing to the alleviation of traffic congestion. 【Features】 ■ Installation of a φ150mm pipe onto a φ200mm PVC pipe ■ Installation onto fume pipes and shields ■ φ2,000 casing shaft initiation (φ1,500 casing shaft initiation is also possible; separate calculations apply) ■ Chemical solution injection to the reach section can be performed from within a φ1,500 casing pile ■ Adoption of special branch pipes that are earthquake-resistant and watertight *For more details, please download the PDF or feel free to contact us.

  • Earthquake-resistant construction method
  • Ground foundation construction method
  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Small Diameter Pipe Propulsion Method "Three Pipe King (R) DRM MVP301"

Response to stagnant water sand layers! A small-diameter pipe jacking method that can control the amount of soil and sand intake during advancement.

The "Three-Pipe King (R) DRM MVP301" is a small-diameter pipe jacking method suitable for saturated sand layers. It allows for control of the amount of soil intake during jacking. Complete water stoppage can be achieved when setting the pipes, preventing auger sticking. 【Features】 ■ Permeability coefficient K = 10(-2cm)/SEC to 10(-3cm)/SEC or less ■ Water head difference within 3 to 5m ■ Control of soil intake during jacking is possible ■ Tools can be used interchangeably with other models ■ Launching from a shaft with a diameter of φ1500 is possible (Note: Pipe length 0.5m) *For more details, please download the PDF or feel free to contact us.

  • Drilling Machine
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Floating repair method "Press Down Grout Method"

It is possible to carry out repairs that are reliable and safe without compromising the design! It can accommodate thin finish thickness for floating injection.

The "Press Down Grout Method" is a suitable technique for repairing floating issues in 50 two-tile direct finish where injection is difficult. By securing with an aluminum frame, it can accommodate thin floating injections. 【Features】 ■ Reliable and safe repairs without compromising design ■ Ideal for repairing floating issues in 50 two-tile direct finish ■ Accommodates thin floating injections *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Transparent resin tile pin fixation peeling prevention method "JK Cerider Method"

High waterproofing and barrier properties unique to acrylic resin! Prevents deterioration of exterior walls and contributes to the longevity of buildings.

The "JK Serider Method" is a tile falling prevention method that reinforces tiled exterior walls using a special acrylic resin called "JK Serider," which contains short fibers, and special anchor pins. Thanks to the high waterproofing and barrier properties of the acrylic resin, it prevents the deterioration of exterior walls and contributes to the longevity of the building. The coating is colorless and transparent, preserving the luxurious texture of the tile finish, allowing it to be maintained beautifully over time. 【Features】 ■ Excellent tile falling prevention function ■ Improved durability ■ Colorless and transparent finish *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super Spiral Bolt SP24

The head protection materials (cap/mat) for waterproof sheet installation are no longer necessary.

The "Super Spiral Bolt SP24" is a high-strength locking bolt that inherits the excellent features of the "SN Twist Bolt." It features a newly designed special rib and screw section that are simultaneously formed during the round steel rolling process, resulting in no cross-sectional defects in the screw section and consistent strength throughout its length. 【Excellent Characteristics】 - It uses high-strength material SD685, achieving a high yield load of over 297 kN while being even lighter (3.4 kg/m) than the SN Twist Bolt. - By maintaining the same material diameter and reproducing the surface shape of the SN Twist Bolt, the insertion resistance is equivalent to that of the SN Twist Bolt. - It inherits the excellent anchoring characteristics of the SN Twist Bolt, with high adhesion toughness against ground deformation during the early age of the anchoring material, making it less prone to adhesion failure. - The adoption of the special-shaped nut "S Nut" reduces the protrusion of the nut and bolt, eliminating the need for protective materials (caps/mats) during waterproof sheet installation. *For more details, please refer to the PDF document or feel free to contact us.*

  • Work tools
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

AGF-Me (Metal eco) construction method

It is possible to separately collect steel pipes and injection materials during tunnel excavation! A construction method that allows for resource utilization as sorted industrial waste.

The "AGF-Me (Metal eco) method" is a patented method (Patent No. 3882118) for the non-widening long steel pipe advance construction. It features vertical slits in the end-reinforcing steel pipes of the cutting section during tunnel excavation with non-widening support, allowing for the separate recovery of the steel pipes and injected materials during excavation. This method eliminates unnecessary mixed industrial waste and enables resource utilization as sorted industrial waste. [Features] - Patent No. 3882118 obtained - Structure allows for the separate recovery of steel pipes and injected materials during excavation - Eliminates unnecessary mixed industrial waste and enables resource utilization as sorted industrial waste *For more details, please refer to the PDF document or feel free to contact us.

  • Work tools
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Lock bolt plate "Signal Washer"

Real-time status monitoring is possible! Visualization of ground strength and plates for rock bolts.

The "Signal Washer" is a plate developed to detect ground displacement caused by high earth pressure. It is set with a standard rock bolt, and when the axial force generated in the bolt exceeds a certain level, the coating of the special paint applied to the washer peels off, allowing for easy visual confirmation of changes. 【Features】 ■ 24-hour real-time status monitoring ■ Easy installation ■ Visualization of status changes ■ No electricity required ■ Patent registered ■ NETIS registered KT-180047-A *For more details, please refer to the PDF document or feel free to contact us.

  • Work tools
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Hybrid Fore-Piling"

Enhance blade stability with a combined pattern of "long-length fore piling" and "long-length mirror reinforcement work."

"Hybrid Fore-Piling" is a construction method that is expected to have a higher effect in suppressing the plasticization of surrounding ground. By placing small-diameter steel pipes from the upper part of the mirror section towards the top, it is possible to reinforce not only the "top section" that is reinforced by conventional fore-piling but also the "upper ground of the mirror surface," which has a high risk of collapse. [Features] - By increasing the overlap section, it can reinforce the surrounding ground over a wide area, including the mirror section. - Compared to conventional fore-piling, it has a higher effect in suppressing the plasticization of the ground. - By using small-diameter steel pipes (φ76.3), it is more economical than before. *For more details, please refer to the PDF materials or feel free to contact us.

  • Work tools
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Simple Repair Method for Guardrail Posts "GPR Method"

No need for maintenance time! We have developed a method to repair supports through partial construction.

The "GPR method" is a groundbreaking repair technique that applies the technology of steel pipe expansion-type lock bolts to repair corroded parts of guardrail posts. It features simple work that does not require exploratory drilling and does not need special construction techniques. Additionally, the construction equipment is compact, and the work time per location is extremely high at just 10 to 20 minutes. [Features] ■ Adoption of highly corrosion-resistant plated materials ■ Simple construction that does not require special construction techniques ■ Instant repair from the inside of the post using expansion steel pipes ■ Speedy construction ■ No exploratory drilling required *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Reinforcement and repair materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shear Reinforcement Method "RMA Method"

Construction technology certification acquisition method! No need for mortar mixing or installation of injection holes on site!

The "RMA method" is a shear reinforcement method that allows for reinforcement without encroaching on the inner cross-section of continuous walls. It employs capsules containing premixed mortar as a bonding agent. This method enables construction using impact techniques for long or thick reinforcing bars, making it a post-installed method. Since there is no need for mortar mixing or the installation of injection holes on-site, special management is unnecessary. Reinforcement is carried out only for the insufficient shear capacity, allowing for a transition from shear failure-dominant to bending failure-dominant. 【Features】 ■ Drilling can be done with a small diameter and only once ■ No mixing on-site, maintaining consistent quality ■ Simple product composition and construction method, reducing construction time ■ Minimal interference with existing structural rebar, allowing for reduced re-drilling due to high stopping capability ■ A method that does not use large or special machinery, saving space *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Sewerage facilities
  • Earthquake-resistant construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Gainamesh method [fall prevention measures]

It has excellent durability, conforms to the curved surfaces of tunnels, and prevents the spalling of concrete fragments.

■NETIS Registered, Registration Number: KK-240048 ■High-strength aramid fibers reliably prevent the spalling of concrete pieces. This construction method aims to prevent the spalling of concrete pieces in concrete structures using GFRP shape retainers and high-strength aramid fiber mesh, ensuring the safety of users of the structures. *This meets the quality standards specified in the NEXCO Tunnel Construction Management Guidelines. 【Features】 The mesh part allows for visual inspection after construction. By using high-strength aramid, there is less alkali deterioration due to groundwater, and since it does not conduct electricity, it can also be applied in railway-related tunnels. Installation is quick and easy, as it only requires driving in strike anchors. Additionally, if any deformation is observed after construction, maintenance such as removing and reattaching the fixing screws can be easily performed. By using a locking K-nut with a friction ring (leaf spring), it provides a function to prevent detachment, enhancing safety. This locking K-nut meets NAS standards, which are specified as verification items during material approval by NEXCO.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Lock bolt plate "Bump Press Washer"

Plate for rock bolts that is gentle on waterproof sheets and shotcrete.

* Integrated nut washer * Flat surface of the washer * Sheet is less likely to be damaged * Pull-out test can be performed as is

  • Tunnel Materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SR-LG construction method

"Long-distance pumping" backfill filling method using plastic grout.

* NETIS Registration Number: HK-120037-VR * Quality standards compliant with the design and construction guidelines for backfill cavity injection in sheet pile method tunnels at NEXCO * Capable of long-distance pumping (Track record: 4,000m) The plastic grout material is non-air-based, allowing for long-distance pumping. * Construction possible at external plants Main materials and plasticizing materials (liquid) can be pumped from external plants, and the main materials do not harden alone for long periods, resulting in fewer troubles during pumping. * Environmentally friendly using recycled materials Utilizing fly ash contributes to effective resource utilization. * Ensuring high quality With high underwater non-separation properties, work in flowing water is easy, making it an ideal method for sites with groundwater, standing water, or flowing water. * Working environment The installation of plants externally and the liquid nature of the plastic materials result in minimal dust generation in the working environment inside the structure.

  • Tunnel Materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hybrid seismic reinforcement method

It is a seismic resistance construction method that joins seismic braces using epoxy resin and anchors in two different ways.

Compared to conventional methods, the number of post-installed anchors can be reduced, and since roughening of the existing structure is unnecessary, noise, vibration, and dust can be minimized, allowing for construction while remaining in the building. By adjusting the number of post-installed anchors on the existing framework, reinforcement effects can be secured as needed. Due to the indirect connection with head-mounted studs, the lap length can be reliably secured, ensuring high quality. This method can also be used as a steel brace with openings.

  • ハイブリッド工法7.JPG
  • ハイブリッド工法6.JPG
  • ハイブリッド工法8.JPG
  • ハイブリッド工法9.JPG
  • Vibration isolation, vibration control, and earthquake resistance construction
  • Earthquake-resistant construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Soil-based natural grass surface finishing "3D Field Leveling Method"

Combining dedicated equipment 3D field levelers with information-based construction, we achieve a high level of precision in paving!

The "3D Field Leveling Method" is a technique that uses our specialized equipment, the 3D Field Leveler, to achieve a very high precision in finishing pavement flat. In various sports fields and school grounds, ensuring the flatness of the pavement surface is essential from the perspective of drainage and other factors. With the 3D Field Leveling Method, we can ensure high precision flatness in natural grass paving, leveling of turf soil, and finishing of clay pavements. *For more details, please refer to the related link page or feel free to contact us.

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SAM Method

Extremely lightweight with a density of about 1/100 that of sand! Processing to match the slope shape can also be easily done on-site.

The technology is a cushioning method using expanded polystyrene for rockfall mitigation. The "SAM Foam," made of expanded polystyrene, is extremely lightweight with a density about 1/100 that of sand, significantly reducing dead weight. Additionally, due to its lightweight nature, it does not require large construction machinery for transportation and installation, allowing for manual labor. Furthermore, it can be easily processed on-site to match the slope shape. 【Features of SAM Foam】 ■ Significantly reduces dead weight ■ No lateral pressure occurs even when loads are applied to the top through stacking ■ Does not bond with water, resulting in very little water absorption over time ■ There is almost no need to consider the effects of water even under high humidity conditions ■ Lightweight, so it does not require large construction machinery for transportation and installation *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SGB method (Snow Geo-Bang method)

This construction method takes advantage of the benefits of reinforced wall techniques, allowing for harmony with the natural environment and consideration for aesthetics.

This technology involves constructing reinforced soil walls using geogrids to protect target objects from avalanches or to change the direction of avalanche flow to guide it to a safe location. By adopting precast concrete panels for the avalanche impact surface, significant improvements in workability have been achieved, including the reduction of temporary scaffolding, labor savings, shortened construction periods, and enhanced safety during construction. 【Features】 - Labor savings and shortened construction periods due to the use of precast concrete panels - Shortened construction periods and improved safety during construction through the reduction of temporary scaffolding - Reduced foundation ground treatment costs by adopting a flexible reinforced soil method - Enhanced harmony with the natural environment and improved aesthetics through vegetation greening of the wall surface - Capability to use a wide range of embankment materials, contributing to the recycling of construction-generated soil *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

High-Strength Polyurea Resin Composite Waterproof System "Rim Sheet Method"

Small area waterproofing construction can be handled with high strength and short construction time! Super fast-curing polyurethane resin is made into sheets.

The "Rim Sheet Method" is a new construction technique that uses rim sheets (patented technology) made from ultra-fast curing polyurea resin to waterproof and renovate traditional bathrooms. The installation is completed by adhering the rim sheet with rim bond and sealing the joint areas with rim seal. This allows for construction to be completed in as little as one day. The rim sheet, rim seal, and rim bond have very little solvent odor. Additionally, they exhibit minimal aging changes, contributing to a longer lifespan. The floor of the washing area features a tile pattern for aesthetic appeal and is slip-resistant, ensuring safety. Furthermore, the top coat of the surface has obtained certification for drinking water testing (JWWA). 【Features】 ■ Bathroom waterproof renovation ■ Installation is completed by adhering the rim sheet with rim bond and sealing the joint areas with rim seal ■ Construction can be completed in as little as one day ■ Rim sheet, rim seal, and rim bond have very little solvent odor ■ Minimal aging changes contribute to a longer lifespan *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Polyurea resin ultra-fast curing spray waterproof system "Rim Quick Method"

Quick curing allows for immediate walkability! A waterproof system that forms a strong waterproof layer!

The "Rim Quick Method" is a waterproofing construction using a polyurea ultra-fast curing spray. It can be walked on 10 minutes after application, making it suitable for areas where speed of construction is required. Additionally, it has the ability to follow the substrate behavior unique to urethane coating waterproofing materials, possesses high tensile strength, and forms a robust waterproof layer. 【Features】 ■ Excellent durability ■ Introduction of film thickness management methods ■ ☆☆☆☆ product (certified) ■ Walkable 10 minutes after application ■ No protective concrete required *For more details, please refer to the PDF materials or feel free to contact us.

  • Waterproofing work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete corrosion protection / Non-styrene type 'KS lining method'

Significantly contributes to the long lifespan of concrete structures! Prevents the generation and spread of environmental pollutants, making it friendly to both people and the environment!

The "KS Lining Method" is an environmentally friendly, non-styrene resin method that complies with regulations for the prevention of specific chemical substance hazards. It is also compatible with spray methods, allowing for a reduction in construction time. Particularly in wastewater treatment facilities, hydrogen sulfide gas is generated over time, causing concrete to corrode and deteriorate due to sulfuric acid and other factors. The KS Lining method prevents the generation and spread of environmental pollutants and significantly contributes to the longevity of concrete structures. 【Features】 ■ Adoption of a non-styrene resin method that meets the demands of the times ■ Supports the longevity of structures ■ Contributes to the longevity of industrial structures ■ Also contributes to CO2 reduction, considering global warming ■ Significantly reduces carbon dioxide emissions compared to conventional methods based on manufacturing standards *For details, please request materials or view the PDF data from the download.

  • Other interior and exterior systems and units
  • Other construction services
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Precautions for Using the Drainage Pipe

For a comfortable living environment. This is a booklet full of information about drainage pipes.

This document introduces "Precautions for Using Drain Pipes." It includes points to note after various types of drain pipe cleaning, methods for dealing with troubles such as clogs and leaks, the mechanisms behind overflow accidents, and features the patented cleaning method "Ozone Circulation Cleaning Method," which enhances cleaning capability by five times, presented clearly with illustrations. [Contents (partial)] ■ Precautions for Use After Drain Pipe Cleaning ■ Troubleshooting Methods ■ About the Drum-Type Washing Machine Installation Base ■ Why Do Overflow Accidents Occur During Drain Pipe Cleaning? ■ Patented Method: Ozone Circulation Cleaning Method *For more details, please refer to the catalog or feel free to contact us.

  • Drainage and ventilation equipment
  • Renovation and repair methods
  • Piping and insulation
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Labor-saving construction method "Separless Method"

Environmentally friendly labor-saving construction method: Beautiful finish without using separators!

The labor-saving construction method "Separless Method" is optimal for wave return, retaining walls, piers, reverse T-walls, settling ponds, dams, levee heightening, tanks, farm ponds, waterways, and joint trench construction. In conventional methods, separators were used to determine the formwork, but the Separless Form determines the formwork without using separators (within 2 meters). Since separators are not used (or their number is reduced), the finish becomes very neat. Additionally, there is no concern about hairline cracks, and the number of bubbles is reduced. 【Features】 ■ Fast construction possible ■ High safety ■ Reduction of consumables and cost savings ■ Shortened construction period and significant reduction in labor costs ■ Scaffold installation is possible *For more details, please refer to the catalog or feel free to contact us.

  • Scaffolding and Support Materials
  • Retaining wall
  • Other construction services
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration