Continuous underground wall construction possible at a height of 10m and maximum depth of 60m with machinery!
The "TRD method" is a construction technique that involves moving a cutter post installed underground horizontally while excavating the ground with cutter bits attached to a cutter chain, mixing and stirring the solidifying liquid with in-situ soil in a vertical direction, and creating a solidified body in the ground. 【Features】 1. Outstanding stability 2. High-precision construction possible 3. Cost reduction achieved through excellent excavation capability 4. Homogeneous wall quality in the depth direction 5. Continuous construction without misalignment 6. Flexible setting of core material spacing Outstanding stability, high-precision construction, and excavation capability! A ground continuous wall method adaptable to various applications! *For more details, please feel free to contact us.*
Inquire About This Product
basic information
Scope of Application Wall Thickness: 450–850mm (at 50mm intervals) Wall Depth: 60m Soil Quality: N≦100 (gravel diameter of 100mm or less) qu≦5,000kN/m² *For more details, please feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
Application Examples 1. Retaining walls Underground facilities, wastewater treatment facilities, open-cut excavation roads, subway station construction 2. Rainwater retention pond cutoff walls Urban rainwater retention ponds, river improvement works such as river washing weir replacements 3. Landfill cutoff walls and contaminated soil containment walls Industrial waste treatment facilities and contaminated soil containment 4. Liquefaction countermeasures and ground improvement Building foundations and embankment foundation measures 5. Deformation prevention walls Deformation prevention due to excavation near railways, prevention of settlement due to new embankments 6. River levee cutoff walls and underground dam cutoff walls Permeation cutoff walls for the permeable layer beneath the levee, underground dams
catalog(1)
Download All CatalogsCompany information
Our company was founded in 1958 and specializes in underground special civil engineering works such as underground continuous walls, underground obstacle removal, ground improvement, and pipeline construction. In recent years, we have expanded our business operations to include slope work and construction. There is a growing social demand for securing the natural environment, seismic reinforcement, liquefaction prevention, restoration of structures, and urban redevelopment, which have become pressing issues in recent years. In response to these social needs, we have developed seismic reinforcement and liquefaction countermeasure methods such as the "Ultra Multi-Point DP Method" and the "High Grip Grout Method." For structural restoration, we utilize our in-house developed restoration method called "Suiheikun," and for urban redevelopment, we are conducting research and development of new methods such as the "Hiro Work Kmigty Method," "Bauer Method," and "Super Top Method," aimed at underground obstacle removal. Additionally, as part of our eco-friendly initiatives, we are researching and developing methods that use bubble drilling fluid to reduce industrial waste, striving to contribute to society through high-quality construction and services. We aim to continue responding to the needs of the times by deploying a variety of specialized techniques and uniquely developed methods.