A construction method for installation pipes using a combined auger and pressure insertion technique that incorporates special branches with earthquake resistance and water tightness!
The "Strike Method" is a pipe installation and advancement technique that utilizes a combined auger and pressure insertion method to achieve effective ground improvement by injecting chemical solutions after the arrival of the casing pipe at the main pipe to be installed. Even when installing the main pipe under heavily trafficked roads, construction can be carried out from a distant shaft, contributing to the alleviation of traffic congestion. 【Features】 ■ Installation of a φ150mm pipe onto a φ200mm PVC pipe ■ Installation onto fume pipes and shields ■ φ2,000 casing shaft initiation (φ1,500 casing shaft initiation is also possible; separate calculations apply) ■ Chemical solution injection to the reach section can be performed from within a φ1,500 casing pile ■ Adoption of special branch pipes that are earthquake-resistant and watertight *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Lineup】 ■STM-1535 ■STM-2040 *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company was established in 1968 and is headquartered in Yokohama City, Kanagawa Prefecture. We are a manufacturer that provides hydraulic system equipment active in infrastructure development, including water supply and sewage systems. We aim to contribute to society in the ever-expanding field of hydraulic technology and to grow and develop together with our customers.