iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      36676items
    • Facilities
      Facilities
      57727items
    • Lighting and Interior
      Lighting and Interior
      17586items
    • Common materials
      Common materials
      37231items
    • Civil Engineering Materials
      Civil Engineering Materials
      10203items
    • Construction, work and methods
      Construction, work and methods
      29182items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29725items
    • IT/Software
      IT/Software
      33553items
    • others
      others
      89297items
    • Store and facility supplies
      Store and facility supplies
      4599items
    • Office and commercial supplies
      Office and commercial supplies
      11728items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      1057items
    • Logistics Equipment
      Logistics Equipment
      7333items
    • Energy and Resources
      Energy and Resources
      11968items
  • Search for companies by industry

    • Information and Communications
      7295
    • others
      7210
    • Building materials, supplies and fixtures manufacturers
      6631
    • Service Industry
      4754
    • Trading company/Wholesale
      3072
    • Other construction industries
      2445
    • Electrical equipment construction business
      719
    • Construction Consultant
      607
    • Interior Design
      519
    • General contractors and subcontractors
      490
    • Facility Design Office
      489
    • Architectural design office
      363
    • retail
      362
    • Housing manufacturers and construction companies
      349
    • Warehousing and transport related industries
      329
    • Building Management
      292
    • Electricity, Gas and Water Industry
      285
    • Interior construction business
      278
    • Medical and Welfare
      275
    • Educational and Research Institutions
      253
    • Renovation and home construction industry
      222
    • Water supply and drainage construction business
      205
    • Transportation
      174
    • Real Estate Developers
      165
    • Fisheries, Agriculture and Forestry
      132
    • Structural Design Office
      65
    • Finance, securities and insurance
      41
    • Restaurants and accommodations
      32
    • self-employed
      31
    • Mining
      26
    • Public interest/special/independent administrative agency
      20
    • Police, Fire Department, Self-Defense Forces
      17
    • Property Owner
      9
    • Store and building owners
      9
    • Government
      9
    • Individual
      9
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Construction Consultant
  • Interior Design
  • General contractors and subcontractors
  • Facility Design Office
  • Architectural design office
  • retail
  • Housing manufacturers and construction companies
  • Warehousing and transport related industries
  • Building Management
  • Electricity, Gas and Water Industry
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Property Owner
  • Store and building owners
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. ProductSearch
  3. Construction, work and methods
  4. Civil Engineering
  5. Pipeline Construction
  6. Hard rock construction method

Hard rock construction method

  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

last updated:Apr 18, 2020

Taiyo Kisokogyo Co.,Ltd.
Taiyo Kisokogyo Co.,Ltd.
  • Special site
  • Official site

Air hammer type with directional control function for "shock drilling and propulsion method." The target soil types are infinite for gravel! Infinite for rock!

The hard rock construction method is a technique that uses a horizontal boring single-pipe propulsion system, incorporating large and small down-the-hole hammers into the leading body, allowing for the crushing of hard soil types such as soft rock, hard rock, gravel, and cobblestones while being propelled with low thrust. After the completion of the steel pipe propulsion, it can accommodate various pipelines (such as water supply and drainage, electricity, gas, and other lifeline pipelines). Additionally, as a special method, it is possible to construct pipelines with a nominal diameter of 800mm or more using a reaming method that utilizes the reach.

    Pipeline ConstructionSpecial Construction Method
写真?.JPG

Hard rock construction method

写真?.JPG
写真?.JPG
  • Special site - Product/service details - https://pr.www.ipros.com/taiyoukiso/product/

Inquire About This Product

  • Contact Us Online

basic information

- By excavating and advancing only through the crushing of hard ground (bedrock, cobbles, and boulders mixed with gravel) using impact force, it is possible to achieve long-distance and high-precision construction without being affected by changes in rock quality or the position of boulders and cobbles. - In rock layers of medium hard rock or harder, construction with a maximum advancement length of 150 meters is possible by replacing the down-the-hole hammer bit. - The minimum dimensions of the launch shaft are Φ2500mm, allowing for access to existing manholes. Additionally, inclined and vertical construction from the ground surface is also possible. - The applicable pipe diameter ranges from steel pipe nominal diameter Φ400 to 800mm, and it can also be replaced with Hume pipes.

Price range

Please contact us for details

Delivery Time

Please contact us for details

Applications/Examples of results

Lifeline pipelines such as water supply and drainage, electricity, and gas.

Company information

Taiyo

Taiyo Kisokogyo Co.,Ltd.

General contractors and subcontractors

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
  • Special site
  • Official site
Phone number/address

Our company was founded in 1958 and specializes in underground special civil engineering works such as underground continuous walls, underground obstacle removal, ground improvement, and pipeline construction. In recent years, we have expanded our business operations to include slope work and construction. There is a growing social demand for securing the natural environment, seismic reinforcement, liquefaction prevention, restoration of structures, and urban redevelopment, which have become pressing issues in recent years. In response to these social needs, we have developed seismic reinforcement and liquefaction countermeasure methods such as the "Ultra Multi-Point DP Method" and the "High Grip Grout Method." For structural restoration, we utilize our in-house developed restoration method called "Suiheikun," and for urban redevelopment, we are conducting research and development of new methods such as the "Hiro Work Kmigty Method," "Bauer Method," and "Super Top Method," aimed at underground obstacle removal. Additionally, as part of our eco-friendly initiatives, we are researching and developing methods that use bubble drilling fluid to reduce industrial waste, striving to contribute to society through high-quality construction and services. We aim to continue responding to the needs of the times by deploying a variety of specialized techniques and uniquely developed methods.

Product/Service List (58)

Popular products in related categories

Hard rock construction method
Construction, work and methods
Hard rock construction method
Taiyo Kisokogyo Co.,Ltd.
Super Shiltrock Method
Common materials
Super Shiltrock Method
中島商会(本社)
Tezak Super Lock Method
Construction, work and methods
Tezak Super Lock Method
日本植生
[Maintenance Work Example] Rain Leak Repair Work <Food Industry>
Surveys, Measurements, and Services
[Maintenance Work Example] Rain Leak Repair Work <Food Industry>
酒重
New method 'PPE method' for chipping work in repair construction.
Construction, work and methods
New method 'PPE method' for chipping work in repair construction.
れんたま【KEMROC】

Related New Products

"Skate park surface finishing in the adjustment pond" Toyo Carbon Urban Sports Park
Construction, work and methods
"Skate park surface finishing in the adjustment pond" Toyo Carbon Urban Sports Park
ウィルビー 建材事業本部
Large-scale renovation: Hinai Shape Park Skateboard Park
Facilities
Large-scale renovation: Hinai Shape Park Skateboard Park
ウィルビー 建材事業本部
Many Olympic athletes produced! 【Sagamihara Gion Urban Sports Park】
Facilities
Many Olympic athletes produced! 【Sagamihara Gion Urban Sports Park】
ウィルビー 建材事業本部
Kochi Prefecture Susaki City Skate Park [SAKURA BANDA]
Facilities
Kochi Prefecture Susaki City Skate Park [SAKURA BANDA]
ウィルビー 建材事業本部

The related categories of Pipeline Construction

  • Construction, work and methods
  • Civil Engineering
  • Pipeline Construction
  • Construction methods and technologies
  • Special Construction Method
Find products and companies by related keywords
  • #Construction method
  • #Rock Method
          

Inquire About This Product

  • Contact Us Online

Products

  • Search for Products

Company

  • Search for Companies

Special Features

  • Special Features

Ranking

  • Overall Products Ranking
  • Overall Company Ranking

support

  • site map
IPROS
  • privacy policy Regarding external transmission of information
  • terms of service
  • About Us
  • Careers
  • Advertising
IPROS Services
  • >IPROS GMS | Search site for the manufacturing industry
  • >IPROS | Search site for the B2B industry
COPYRIGHT © 2001-2026 IPROS CORPORATION ALL RIGHTS RESERVED.
Please note that the English text on this page is automatically translated and may contain inaccuracies.