Construction method Product List and Ranking from 1589 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Feb 18, 2026~Mar 17, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Feb 18, 2026~Mar 17, 2026
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. TRAWE main office Saitama//Other construction industries
  3. エルニード協会 Kagawa//Other construction industries
  4. 4 シーカ・ジャパン Tokyo//Building materials, supplies and fixtures manufacturers
  5. 5 水研 Shiga//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Feb 18, 2026~Mar 17, 2026
This ranking is based on the number of page views on our site.

  1. 建物外壁工事 ロープアクセス工法 TRAWE main office
  2. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  3. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 地下水・軟弱地盤対応の基礎工法『スーパーラップルエルニード工法』 エルニード協会

Construction method Product List

2041~2070 item / All 4282 items

Displayed results

屋上緑化工法 「グロウシステム」

シンプルかつ安心な屋上緑化を実現!

「グロウシステム」は、シンプルかつ安心な屋上緑化を実現する屋上緑化工法 です。 簡易的な防水保護と耐根性能を持ち合わせる「防根フィルム(NCKフィルム)」や、薄層屋根緑化での保水量アップとスムーズな排水を行う「保水排水基盤(ソイレンマット M30)」などの屋上緑化に最適な資材を使用しています。 【特徴】 ○シンプルかつ安心な屋上緑化を実現 詳しくはお問い合わせ、またはカタログをダウンロードしてください。

  • Wall and rooftop greenery
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Alkaline soil regeneration material "Dr. pH" [*NETIS registered*]

Neutralize contaminated alkaline soil and regenerate it into green soil! Would you like to reduce the cost of disposing of leftover soil and reuse it?

The alkaline soil regeneration material "Dr.pH" is effective for all types of alkaline soil. Strongly alkaline soil is treated as "industrial waste," leading to high disposal costs and developing into serious environmental issues such as alkaline contamination. In response to this problem, we developed this product with the aim of regenerating alkaline contaminated soil for greening purposes. 【Five Distinctive Features of Dr.pH】 - Regenerates soil for greening and reduces the amount of leftover soil - Reduces costs by 50% through neutralization and reuse - Plants can be installed 10 to 24 hours after application - Composed of materials that are harmless to humans and the environment - Easy to mix with soil *For more details, please contact us or download the catalog.

  • Earthworks
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Residential Upcon Method (Concrete Floor Slab Settlement Correction Method)

For foundation repair work on slab houses due to earthquakes and ground subsidence, leave it to Upcon!

Do you have any of these concerns? ✓ The house is leaning ✓ There are gaps in the windows and sliding doors ✓ The entrance and windows do not close properly ✓ There is an uncomfortable feeling when entering the room ✓ Doors open and close on their own ✓ Experiencing dizziness or headaches ✓ There are cracks or wrinkles in the wallpaper ✓ Balls roll on their own ✓ Water flow has become poor ✓ The water in the aquarium is not level With Upcon, we can quickly correct the tilt of your home! ■ Upcon Method (Concrete Floor Slab Settlement Correction Method) We inject special foam urethane resin under the concrete of the foundation of homes with tilt, correcting it in millimeter increments while continuously monitoring the level. The injected resin expands in a short time, compressing and reinforcing the ground while lifting the foundation to restore it to a straight position. We conduct surveys and construction anywhere in Japan, 365 days a year, including weekends and holidays. Our in-house staff, equipped with the necessary skills and qualifications, will assist you!

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Upcon Corporation Company Profile

Upcon is a company that solves problems with 'urethane.' We quickly correct floor sinking, unevenness, tilting, and gaps using rigid polyurethane resin.

Upcon quickly corrects concrete floors that have experienced sinking, unevenness, tilting, gaps, and vibrations due to ground subsidence or earthquakes, without stopping operations. We repair tilted concrete floors in factories, warehouses, and stores, which are the bases for corporate production and sales activities, as well as in general residences affected by earthquakes and ground subsidence. Additionally, we are engaged in public works using technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is one-tenth of conventional methods. 2. No operational stoppage: No need to move machinery or goods. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-sinking compared to conventional methods. We provide total support from on-site surveys to repair planning and construction, all managed responsibly by our in-house staff. Our specialized and experienced staff propose optimal repair plans tailored to the customer's site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Factory/Warehouse] Upcon Method (Concrete Floor Slab Settlement Correction Method)

If you have tilting, steps, or gaps in factory or warehouse floors due to earthquakes or ground subsidence, then Upcon!

Do you have any of these concerns? ✓ Unable to secure the level of machinery ✓ Warehouse items are not stacked straight ✓ Uneven surfaces make it difficult for forklifts to operate ✓ Cracks have appeared in the floor ✓ Gaps have formed between the floor, walls, and ceiling ✓ Water is pooling due to floor sagging ✓ Insects have appeared inside the building We can solve these problems with Upcon! ■ Upcon Method (Concrete Floor Slab Settlement Correction Method) Concrete floors that have settled, become uneven, tilted, or developed gaps due to ground subsidence and other causes. The Upcon method corrects such floors quickly without stopping operations. Since it can be performed without breaking the existing floor, the construction period is significantly reduced to about 1/10 compared to traditional methods (concrete replacement). There is no need to remove items or machinery, or to install large plants, allowing for construction without halting operations. We conduct surveys and construction anywhere in Japan, 365 days a year, including weekends and holidays. Our in-house staff, equipped with the necessary skills and qualifications, will assist you! *For more details, please refer to the external link page or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Store] Upcon Method (Concrete Floor Slab Settlement Correction Method)

Tilt, steps, and gaps in the store floor due to earthquakes or ground subsidence. We will make corrections quickly without stopping business!

Do you have any of these concerns? ✓ Cracks in the floor ✓ Gaps in the floor, walls, or ceiling ✓ Issues with the opening and closing of automatic doors ✓ Shopping carts move on their own when you let go ✓ The floor is sagging ✓ You feel dizzy and lose your balance when entering the store ✓ Product racks are tilted We can solve these problems with Upcon! ■ Upcon Method (Concrete Floor Slab Settlement Correction Method) Concrete floors that have settled, have steps, tilts, or gaps due to ground subsidence and other causes. The Upcon method quickly corrects such floors without stopping business. Since it is performed without breaking the existing floor, the construction period is significantly shortened to about 1/10 compared to conventional methods (concrete replacement). There is no need to move or remove product racks or refrigerated cases, and installation of large plants is also unnecessary, allowing for work to be done without interrupting business. We conduct surveys and construction anywhere in Japan, 365 days a year, including weekends and holidays. Our in-house staff, equipped with the necessary skills and qualifications, will assist you! *For more details, please refer to the external link page or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Correcting floor subsidence and tilt without stopping business operations!

Floor subsidence caused by earthquakes and ground subsidence. The specialist in subsidence correction, Upcon, will fix the existing floor without demolition and in a short construction period! Over 3,000 successful cases nationwide!

□ Store fixtures and product racks are tilted □ Shopping carts move on their own □ Luggage and products are not stacked straight □ Gaps have formed in the floor, walls, and ceiling □ Cracks have appeared in the floor The issues caused by floor subsidence, tilting, and unevenness will be resolved by "Subsidance Correction Specialist Upcon." With the Upcon method, polyurethane resin is injected under the existing concrete floor, and the pressure from the foam strengthens the ground and lifts the floor. In principle, there is no need to demolish the existing floor, and there is no need to move heavy product racks or store fixtures, significantly shortening the construction period compared to conventional methods. Additionally, we can accommodate construction limited to nighttime outside of business hours, allowing for the correction of floor subsidence without stopping operations.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Large Shopping Center: Correction of Sunken Floor Slab

Correction made during the night while operations were suspended! A case where two construction plant vehicles were used to expedite the construction schedule.

A large shopping center experienced significant floor subsidence due to weak ground. Gaps were observed in various places, such as between the floor and walls and between the walls and ceiling, caused by the floor subsidence. As a result, our company implemented repairs. The "Upcon Method," which can be executed at night during the business closure, was adopted for the repairs. To expedite the construction period, we utilized two construction plant vehicles and completed the repairs over 25 nights. 【Construction Overview】 ■ Construction Area: Approximately 3,240m2 (Backyard 405m2, Store Interior 2,835m2) ■ Maximum Subsidence: 94mm ■ Repairs completed over 25 nights ■ Two construction plant vehicles used to expedite the construction period For more details, please feel free to contact us via the PDF download or inquiry form.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Quickly correct the factory floor's slope and the gaps under the floor with rigid polyurethane foam resin!

Correct the floor tilt caused by earthquakes or ground subsidence without stopping operations and in a short time! No need to move machines or equipment! Also suppress any concerning vibrations from the machines!

■ The level of the machine cannot be secured. ■ The machine is tilted and vibrating. ■ Malfunctions are occurring in the machine, leading to an increase in defective products. ■ Gaps have formed in the floor, walls, and ceiling. ■ Cracks have appeared in the floor. The "Upcon Method" uses polyurethane resin to quickly correct issues caused by tilting or sagging of the floor, as well as voids or gaps that have formed beneath the floor due to earthquakes or ground subsidence. 【What is the Upcon Method?】 Small holes with a diameter of 16mm are drilled into the existing concrete floor where subsidence has occurred. While continuously monitoring the level in millimeter increments, polyurethane resin is injected. The resin injected beneath the floor expands under pressure in a short time, compacting and reinforcing the ground, improving bearing capacity, and pushing the concrete back to a level position. The final strength of the resin is achieved in about 60 minutes. Additionally, if voids have formed beneath the floor, they are filled using the same method. By correcting the existing concrete floor without demolition, the construction period is significantly reduced compared to conventional methods. The polyurethane can lift the floor with a foaming pressure of up to 10 tons per square meter, eliminating the need to move heavy equipment or loads. The deformation of the floor is corrected without stopping the production line.

  • Renovation and repair methods
  • Vibration and Sound Level Meter
  • Vibration isolation, vibration control, and earthquake resistance construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Quickly correct floor tilts, unevenness, and gaps under the floor in warehouses and logistics centers!

Correcting the tilt of concrete floors caused by earthquakes and ground subsidence without stopping operations and within a short period! Solving warehouse floor issues with polyurethane resin!

■The cargo in the warehouse is not stacked straight. ■There are uneven surfaces that hinder the movement of forklifts. ■The racks and other equipment are tilted. ■The floor vibrates. ■Abnormal behavior is observed in the automatic racks. ■The transport robot has stopped. The "Upcon Method" quickly resolves issues caused by floor tilting and sagging due to earthquakes or ground subsidence, as well as voids and gaps that have formed beneath the floor, using polyurethane resin. 【What is the Upcon Method?】 Small holes with a diameter of 16mm are drilled into the existing concrete floor that has subsided, and while constantly monitoring the level in millimeter increments, polyurethane resin is injected. The resin injected beneath the floor expands under pressure in a short time, compacting and strengthening the ground, improving bearing capacity, and pushing up the concrete to correct it. The final strength of the resin is achieved in about 60 minutes. Additionally, if voids have formed beneath the floor, they are filled using the same method. Since the correction is made without demolishing the existing concrete floor, the construction period is significantly reduced compared to conventional methods. The polyurethane can lift the floor with a foaming pressure of up to 10 tons per square meter, eliminating the need to move heavy equipment or products. The floor deformation is corrected without stopping operations.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Fukushima Prefecture, Soma Port Port Maintenance Management Work (Quay Restoration)

Due to ground subsidence at the harbor's quay, there are steps and depressions in the concrete pavement, resulting in the loss of water gradient and the formation of puddles. This issue is resolved using the Upcon method.

The Upcon method, which allows for modifications without breaking existing concrete pavement slabs and within a short construction period, has been widely adopted in public works such as roads and airports as a maintenance and repair method. This time, we will introduce a construction site for correcting the sinking of concrete pavement slabs and filling voids at a quay in a port. The quay at Soma Port in Fukushima Prefecture, where cargo loading and unloading occurs frequently, has experienced issues due to ground subsidence, resulting in steps and sinking in the concrete pavement slabs, eliminating the water slope and causing puddles. This has hindered cargo operations. The Upcon method was chosen because it has no environmental impact compared to other methods and can correct the existing slabs without removal in a short period. [Site Information] Soma Port Port Maintenance Management Work (Quay Restoration) Construction Area: Approximately 285 square meters Maximum Subsidence: 97mm Construction Period: 4 days For detailed information on the construction process, please refer to the PDF download below.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Correction Work for Subsidence of Logistics Warehouse - Leveling Adjustment

"A slope was installed due to the formation of a step in the floor." "The floor has sunk, causing cracks." Resolved with the up-construction method.

This time, we will introduce a construction case of a logistics warehouse in Niigata Prefecture. In this logistics warehouse, ground subsidence caused unevenness and cracks in the concrete floor, which hindered the movement of carts and work operations. The Upcon method allows for construction to be carried out without stopping operations and within a short construction period. Additionally, during the injection of polyurethane resin, a surveyor is always present to manage the floor level to the millimeter, ensuring a high-quality finish. 【Site Information】 Niigata Prefecture / Logistics Warehouse Construction Area: 1,148 square meters Maximum Subsidence: 71mm Construction Period: 8 days

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Filling Work for Void Under Concrete Pavement Slabs of Kanmon Tunnel

Fiscal Year 2013 Shimonoseki Area Preservation Work (Kanmon Tunnel Concrete Pavement Slab Void Filling Work)

The Kanmon Tunnel connecting Fukuoka Prefecture and Yamaguchi Prefecture. When large vehicles pass through the toll booth near the tunnel entrance and exit, vibrations were occurring in the nearby residential area. An investigation conducted by FWD revealed the presence of voids believed to be the cause of the vibrations directly beneath the concrete pavement slabs. The Upcon method is a technique that involves injecting rigid polyurethane resin beneath the concrete pavement slabs. The filling and compaction effects of the polyurethane can resolve the loosening and voids in the subgrade that cause vibrations. The Upcon method was adopted with the aim of suppressing slab vibrations by improving the environment of the upper subgrade. 【Site Information】 Fukuoka Prefecture - Yamaguchi Prefecture / Kanmon Tunnel Total construction area: Approximately 200 square meters Construction period: 2 nights

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Emergency restoration method "Dantan": A new technique by the sinking correction expert Upcon.

Quickly restore road unevenness and depressions during an earthquake with polyurethane resin, enabling swift vehicle passage. Contributing to the establishment of emergency transportation routes!

The new method "Emergency Restoration Method Dantan" developed by Upcon involves spraying high-strength polyurethane resin onto road unevenness caused by disasters during earthquakes to create a slope, enabling temporary vehicle passage for the early establishment of emergency transportation routes. A truck equipped with all necessary materials rushes to the site and sprays a two-component polyurethane resin onto the created unevenness. The high-strength polyurethane resin has the property of hardening immediately after spraying, allowing for vehicle passage within 15 minutes after the slope is created. Additionally, it can be used to repair not only unevenness but also depressions and subsidence. Features of the Emergency Restoration Method Dantan: - Ability to create slopes tailored to the shape of the disaster-affected site - Resolution of unevenness in about one hour, allowing immediate vehicle passage Furthermore, it has a proven track record in correcting tilts and unevenness of concrete floors and pavement slabs caused by earthquakes or ground subsidence, as well as filling voids. [Exhibiting at EE Tohoku '23] We will be exhibiting at the comprehensive exhibition of new technologies, EE Tohoku '23. At our booth, we will conduct demonstrations using polyurethane resin. Location: Yume Messe Miyagi Dates: June 7 (Wed) - 8 (Thu) Booth No: West Hall Exhibition B-708

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Highway Toll Booth Concrete Pavement Leveling

Quickly repair the unevenness of the concrete pavement slabs at the highway toll booth.

A step in the concrete pavement caused by sinking. It affected vehicle movement when passing through the toll booth on the highway. We injected polyurethane resin under the sunken concrete pavement slab and corrected the 30mm step in a short time. 【Site Information】 Ehime Prefecture Total construction area: Approximately 12 square meters Construction period: One night Maximum step height: 30mm Please watch the fast-motion video showing the concrete pavement slab being lifted by the foaming pressure of the polyurethane resin from below.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Concrete slab sinking correction method" contributes to the longevity of social infrastructure.

Using high-strength urethane resin, we will correct the deformations such as subsidence, steps, flapping, gaps, and cavities that have occurred in the concrete slab, without excavation and within a short construction period.

The Upcon concrete slab settlement correction method (KT-080008-A, NETIS registration period ended in October 2014) quickly resolves issues such as settlement, unevenness, flapping, gaps, and voids that occur in concrete pavement slabs commonly used in highways and other areas, using specially developed high-strength polyurethane resin. It achieves a short construction period by utilizing a highly mobile plant without breaking the existing pavement slabs or requiring excavation work. This minimizes the period of service suspension and has a proven track record as a planned and efficient method for maintaining social infrastructure. This technology is also adopted not only for highways but also for repair work in ports and airport aprons, as well as disaster recovery work. Upcon will exhibit at the "Highway Techno Fair 2023," where cutting-edge technologies supporting highways will be showcased. Date: November 9 (Thursday) and 10 (Friday), 2023, from 10:00 to 17:00 Location: Tokyo Big Sight, West Hall 3 Exhibition Booth No: A-04 On that day, there will also be a demonstration of settlement correction using polyurethane resin. We invite you to take this opportunity to see it. We look forward to your visit.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Short-term Correction: Certain Food Warehouse Void Filling Work

Upcon construction method using rigid polyurethane foam! Introducing a case where a cavity was corrected in three days.

We would like to introduce a case of "void filling work" conducted at a certain food warehouse in Kanagawa Prefecture. Using the Upcon method, which allows for the filling of voids that developed under the floor with polyurethane resin in a short period, we corrected a maximum void of 270mm (with a construction area of approximately 171m2) in just three days. After the resin filling, we checked the filling condition with a CCD camera and used non-shrink mortar to seal the injection holes. 【Case Overview】 ■ Construction Area: Approximately 171m2 ■ Maximum Void Size: 270mm ■ Location: A certain food warehouse in Kanagawa Prefecture ■ Construction Period: 3 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Construction without moving the rack: Warehouse subsidence correction (Fukushima Prefecture)

No need to remove heavy racks or machinery! Here is a case where modifications were completed in just 4 days.

We would like to introduce a case of settlement correction implemented at a warehouse in Fukushima Prefecture. Due to the effects of the Great East Japan Earthquake that occurred in 2011, gradual settlement progressed over the years. After a few years, floor sagging and tilting began to occur inside the warehouse, and inclinations also developed in the rack installation areas. This caused issues such as the forklift forks not fitting properly, leading to "longer loading and unloading times," which disrupted operations and caused difficulties. In this project, we adopted the Upcon method, which allows for construction without moving heavy racks in a short construction period. We were able to correct an area of approximately 1,250 m² in just four days (with a maximum settlement of about 78 mm). [Case Overview] - Construction Area: Approximately 1,250 m² - Maximum Settlement: 78 mm - Location: Warehouse in Fukushima Prefecture - Construction Period: 4 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Void Filling Work (Tokyo)

A gap or cavity of approximately 200mm at most occurred! A case where it was resolved in one day using the up-con method.

We would like to introduce a case of "void filling work" conducted on a slab foundation house located in Tokyo. Due to ground subsidence, the ground level has lowered, resulting in the formation of voids beneath the slab foundation of the house. The voids were resolved in a single day of construction. 【Case Overview】 ■ Maximum void: Approximately 200mm ■ Area: Tokyo ■ Construction period: 1 day *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Filling voids and correcting unevenness in CO pavement slabs inside highway tunnels.

Filling the voids and correcting the unevenness in the concrete pavement slabs inside the highway tunnel without excavation and within a short construction period.

【Customer Consultation and Issues】 A gap of up to 40mm has developed in the concrete pavement slabs within the highway tunnel, resulting in a height difference of up to 64mm due to fluttering. Patching materials were used to address the height differences, but to eliminate the discrepancies in the concrete pavement slabs, we adopted Upcon's concrete slab settlement correction method. This method allows for height correction within a short construction period without breaking the existing concrete pavement slabs. The gaps are filled with polyurethane resin, which expands on its own to fill the voids completely. The polyurethane resin injected beneath the concrete slabs flows into the crushed stone layer of the subbase, resolving any looseness in the surface layer and using the pressure from its foaming and expansion to lift the concrete pavement slabs and eliminate the height differences. 【Site Information】 Hiroshima Prefecture Total Construction Area: 653 square meters Construction Period: 10 nights

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Fireproof box (for shared living spaces) box method

Ideal for intercom installation in shared living areas! A simple type that can be installed after cable wiring.

The "Fireproof Box (for Shared Living Spaces) Box Method" is a construction method that can be applied to hollow wall shared living spaces. It is a simple type that can be installed after cable wiring, allowing for visual confirmation of the filling even after installation. It is ideal for intercom installation areas in shared living spaces. 【Features】 ■ Installed in hollow wall shared living spaces ■ Simple type that can be installed after cable wiring ■ Allows for visual confirmation of the filling even after installation ■ Ideal for intercom installation areas in shared living spaces *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Water Treatment Conditioner "CALFA BAS"

No phosphates, no nitrogen, no polymers used at all! An environmentally friendly cooling tower water treatment conditioner!

Environmentally Friendly Water Treatment Conditioner for Cooling Towers ~ Phosphate-free / Nitrogen-free / No Polymers ~ 'CALFA BAS' Solving cooling tower issues (silica and calcium scale) and reducing heat exchange with amorphous solid water treatment technology recognized in the environmentally advanced EU! - This is a simple, safe, reliable, and economical water treatment conditioner made only from "natural inorganic components," which replaces the current management of circulating cooling water using organic compound chemicals. It efficiently removes silica scale that adheres to heat exchangers, maintaining optimal performance at all times, achieving significant energy savings and cost reductions. A different grade, 'CALFA BAS ~Free~', is also available, which contains no components subject to the Water Pollution Prevention Act, Sewerage Act, or total water quality regulation, making it 'discharge regulation-free'!! A 100% environmentally protective conditioner has arrived! Only CALFA BAS can safely "remove and prevent silica scale." * 'CALFA BAS' is a registered trademark of Calfa Chemical Co., Ltd. Please be cautious of "similar products" and "imitation products (counterfeit goods)."

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Floor Shot Blast "MODUL200"

Achieved significant improvement in work efficiency with simple operability and excellent operating range.

■It features a super compact design that flexibly adapts to narrow spaces and difficult transportation or delivery sites. ■By using a vacuum to collect concrete dust and paint chips generated during blasting, it improves work efficiency in the job site environment. (Please contact us for information about the attached vacuum.) ■The subdivision of parts enhances the ease of replacing consumables and other components.

  • Concrete construction
  • Waterproofing work
  • Plastering and painting work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Floor Shot Blast 'MODUL350'

Creates a uniform surface preparation with powerful blasting capabilities.

■Compact and powerful, it demonstrates excellent blasting capabilities. ■With a compact design, it achieves simple operability while considering work efficiency and the job site environment. ■By collecting concrete dust and paint debris generated during blasting with a vacuum, it improves work efficiency in the job site environment. (Please inquire about the attached vacuum.) ■The subdivision of parts enhances the ease of replacing consumables and other components.

  • Concrete construction
  • Waterproofing work
  • Plastering and painting work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Eco Piping Method "CK Flare Piping System"

No welding required, improving quality and work efficiency! Significant reduction in construction costs and time possible!

The "CK Flare Piping System" is an eco-friendly piping method that does not require welding, taking into consideration the global environment. This method is a new piping technique that does not require "welding" in the installation process, rethinking the entire system of factory processing, transportation, and on-site construction. By eliminating the need for welding, reducing labor hours, and shortening delivery times, it enables cost reduction. 【Features】 ■ Environmentally friendly ■ High quality ■ Safety ■ Energy saving ■ Cost reduction ■ Shortened delivery times *For more details, please refer to the PDF materials or feel free to contact us.

  • Piping materials (copper pipes, cast iron pipes)
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

2x4 lumber hardware "Sawhorse Bracket"

Focus on sturdiness! Original hardware for creating workbenches, low tables, and desks.

The "So-Horse Bracket" from Ōdai is an original fitting that allows you to easily create a workbench by simply assembling 2x4 lumber and securing it with screws. While many brackets are foldable, we deliberately omitted that function to focus on sturdiness. It has a material feel with a black zinc plating finish. In addition to its original purpose as a workbench, depending on how you assemble it, you can easily create a coffee table or desk as well. 【Features】 ■ Original fitting that allows for easy creation of a workbench ■ Focus on sturdiness ■ Material feel with a black zinc plating finish ■ Depending on the assembly, you can easily create a coffee table or desk *For more details, please feel free to contact us.

  • Support hardware/opening hardware
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

2x4 lumber hardware 'angle brackets'

Widely usable! Angle brackets that can be used for corner connections and reinforcements with a basic shape.

The "Angle Bracket" from Ōdai is a versatile angle bracket that can be widely used for 2x2, 1x4, 2x4, 4x4, and more. It has a basic shape and can be used for corner connections and reinforcements. Although it is a simple bracket, it has thickness that gives it a strong presence. 【Features】 ■ Versatile angle bracket ■ Basic shape ■ Usable for corner connections and reinforcements ■ Thickness gives it a strong presence *For more details, please feel free to contact us.

  • Support hardware/opening hardware
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

2x4 material hardware '1x4 joint'

It's easy to determine the angle and achieve a strong fastening! Ideal for creating boxes with partitions.

The "1x4 Joint" from Oari is used to fix 1x4 materials in L, T, or X shapes. It allows for easy angle determination and strong fastening, making it ideal for creating boxes with dividers. Made from slightly thicker metal plates, it has an outstanding presence. 【Features】 ■ Fastening hardware for 1x4 materials ■ Ideal for creating boxes with dividers ■ Made using slightly thicker metal plates ■ Outstanding presence *For more details, please feel free to contact us.

  • Support hardware/opening hardware
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

i-LIFT Method

Easily lift up tilted or sunken houses!

The "i-LIFT method" is a technique that injects grout into the ground to lift and restore tilted or sunken buildings while also enhancing the ground's bearing capacity. Since the injection is performed while continuously measuring with a high-precision leveling instrument, fine adjustments to the level are possible. Additionally, construction can be carried out with compact machinery, making it feasible even in areas with limited space between adjacent houses. This method allows for a reduction in construction time compared to conventional methods. 【Features】 ■ Fine adjustments to the level are possible ■ Construction is possible in areas with limited space between adjacent houses ■ Reduction in construction time ■ Can be implemented even if ground improvement has already been performed ■ Can be applied to measures against ground subsidence *For more details, please refer to the PDF materials or feel free to contact us.*

  • Other civil engineering works
  • others
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Multi Pavement Cutter Maruk Cutter 100

The technology of sharp blades has achieved compactness and lightweight design. Do you think it's normal to use large machinery for circular pavement finishing and manhole cover replacement work!?

● With the support of shape analysis from the Yamaguchi Prefectural Industrial Technology Center, an efficient cutting blade has been developed. 【Features of the Maruuk Cutter 100】 ① It can cut circular shapes from Φ650mm to Φ2650mm in free sizes. * With eight types of circular blades, any size can be cut without difficulty, allowing for proper circular cutting around almost all circular manhole covers on the road. ② It is small and lightweight, allowing for manual loading and unloading. * It takes about five minutes to set the Maruuk Cutter 100 on the manhole cover and start the circular cutting. Additionally, it also takes about five minutes to store it back on the vehicle after completing the circular cutting. ③ Since it uses a dry cutting method, there is no generation of cutting wastewater or sludge. * It is equipped with a blower. The generated cutting dust is collected by the blower and can be recycled into asphalt. * For other functions and details, please refer to the catalog download or our website www.uotani.jp.

  • Paving Materials
  • Pavement construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration