Construction method Product List and Ranking from 1586 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Apr 08, 2026~May 05, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Apr 08, 2026~May 05, 2026
This ranking is based on the number of page views on our site.

  1. ネプラス工法全国会 本部 Niigata//General contractors and subcontractors
  2. 成瀬化学 Mie//Building materials, supplies and fixtures manufacturers
  3. 徳和工業 Miyagi//Other construction industries
  4. 4 コンステック Osaka//General contractors and subcontractors
  5. 5 TRAWE main office Saitama//Other construction industries

Construction method Product ranking

Last Updated: Aggregation Period:Apr 08, 2026~May 05, 2026
This ranking is based on the number of page views on our site.

  1. 側溝修繕工法『ネプラス工法』<施工前後の写真付き資料進呈> ネプラス工法全国会 本部
  2. Waterproof layer renovation method for achieving the long lifespan of facilities! Narlite injection method. 成瀬化学
  3. Vacuum concrete construction method 徳和工業
  4. 4 建物外壁工事 ロープアクセス工法 TRAWE main office
  5. 5 D-Lite D Board Method [Non-combustible decorative panel that can be processed on-site] 大建工業

Construction method Product List

2011~2040 item / All 4285 items

Displayed results

Roof shade insulation and heat shielding method for sloped roofs [Energy saving & heat prevention]

Reduce the roof surface temperature by -25°C and cut power consumption by 44.4% as a measure against rising electricity costs. Can be installed on 500 square meters per day!

"Roof Shade" is a method that suppresses heat absorption by strongly reflecting sunlight, thereby reducing the surface temperature rise of standing seam roofs. By lowering the surface temperature of the ceiling, it enhances cooling efficiency and cuts power consumption. Since no electric tools are used during installation, there is very little noise. 【Features】 ■ Energy-saving effect from improved cooling efficiency Reduces power consumption by 44.4%, allowing you to save on rising electricity costs. ■ Low cost and short installation time Can be installed at a rate of 500 square meters per day, enabling quick heat mitigation. ■ Significant reduction of rain noise The screen cuts down on bothersome rain sounds. ■ Compliant with fire prevention standards set by the Fire Department It is a fire-resistant product that provides peace of mind in case of emergencies. * Roof Shade can only be installed on standing seam roofs. * For more details, please refer to the PDF document or feel free to contact us.

  • Heat-insulating and moisture-permeable roofing
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Q&S Frame Set Method EE Type

Excellent in constructability and structural performance.

The EE type frame set construction method uses crimped wire mesh that has been plated over the entire frame member, resulting in minimal rust occurrence and excellent durability. This method was developed as part of the Q&S frame construction method.

  • Earth retaining support
  • Earthworks
  • Pile and foundation work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

QSA type anchor method (peripheral friction end compression type anchor)

It is a state-of-the-art compression-type anchor that is less likely to experience progressive deterioration.

It has excellent stress distribution characteristics due to a load-bearing structure that effectively disperses the load. NETIS registration number: KT-060037-A

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SSL Permanent Anchor Method (Surface Friction Tip Compression Type Anchor) CE Type

The SSL-CE type anchor contributes to the rationalization of slope disaster prevention work through technology and cost-effectiveness.

The SSL-CE type anchor method achieves excellent stress distribution characteristics through a compression-type support mechanism that is less prone to tensile cracking in the grout and a load-bearing body that effectively distributes the load.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

TFC pressure-receiving structure method

A construction method that can be implemented faster than on-site pressure plates and at a lower cost than large secondary product pressure plates!

【Features】 (1) The construction process is short because it does not require on-site formwork processing. (2) The components are lightweight and there are few types. (3) They are factory-processed products, ensuring stable quality. (4) The construction management period is short, and there is little effort required for quality and shape management. (5) It has a significant unevenness adjustment function. (6) There is little waste material, resulting in a small environmental burden.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SSL Permanent Anchor Method (Expanded Hole Support Type Anchor) Type P and Type M

The SSL permanent anchor method consists of two techniques: the P-type and the M-type, which are both expansion pressure types.

The SSL-P type anchor body is suitable for clay and weathered rock, where the anchor fixation part is enlarged, and an anchor body is created inside the enlarged hole using grout. This method ensures the anchor's load capacity based on the bearing strength of the fixed ground in the enlarged section. The SSL-M type anchor body is suitable for soft to medium hard rock, where after enlarging the anchor fixation part, the anchor body is inserted and expanded in the enlarged section, ensuring the anchor's load capacity based on the bearing strength of the fixed ground in that section. NETIS registration number: HR-990015-A.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Slope Condition and Anchor Function Verification System 'ECOM'

An economical measurement system that allows for long-term maintenance and management of anchors and slopes with the simplicity of visual inspection.

"ECOM" is a slope and anchor maintenance management system that enables monitoring of slope conditions and anchor functionality with a simple mechanism. Anyone can observe it just by reading the scale. There is no need to bring measuring instruments for observation, and no special skills are required. Additionally, no power or other resources are needed for measurement and maintenance. For more details about other products, please feel free to contact us. 【Features】 ■ Simple mechanism ■ Enables maintenance management of slopes and anchors ■ Anyone can observe just by reading the scale ■ No need to bring measuring instruments for observation, and no special skills are required ■ No power or other resources needed for measurement and maintenance *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

KT Greenery Waterway

Because the linearity is flexible, it is flexible! It has high adhesion and is easy to install.

The "KT Greenery Waterway" is a product that processes hexagonal wire mesh with a diameter of 1.9mm and a mesh size of 40mm into a waterway base. By laying a 3mm thick palm vegetation mat or a 45g/m2 web-type protective mat on the back, it is possible to establish vegetation. It is expected to be applicable as a vegetative waterway in places where there is no water at all times, but water flows during rainfall. 【Features】 ■ Lightweight ■ Easy to carry by hand ■ High adhesion ■ Can be constructed even under poor ground conditions ■ Inexpensive *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Tough Green Light Method

Excellent water retention and nutrient retention, preventing the drying of the substrate. It is economical as it does not use wire mesh.

This technology is a low-cost greening method for slopes and road embankments, primarily using herbaceous plants for full greening on relatively gentle slopes. It excels in water retention and nutrient retention, preventing the drying out of the substrate. Additionally, it is economical as it does not use wire mesh. It overcomes significant challenges of traditional vegetation substrate spraying methods, such as "substrate runoff" and "substrate drying." 【Features】 - Adopted for full greening primarily using herbaceous plants - Low cost - Overcomes major challenges of traditional vegetation substrate spraying methods *For more details, please refer to the PDF materials or feel free to contact us.*

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Plug-type collector pipe

The structure is equipped with a water leakage prevention feature by attaching a protrusion (plug) inside the drainage pipe.

This product is a drainage pipe designed to prevent water leakage by protruding the water collection holes inside the drainage pipe, ensuring reliable drainage of collected groundwater. Compared to conventional strainer pipes, the drainage efficiency has significantly improved. It also has a re-permeation prevention effect on the groundwater from the flowing wastewater inside the pipe. Additionally, this product features a bonding socket at the pipe end, eliminating the need for separate fittings, and it can be joined using adhesive for rigid PVC pipes. 【Features】 ■ Structure equipped with a protrusion (plug) inside the drainage pipe for leak prevention ■ Ensures reliable drainage of collected groundwater ■ Significantly improved drainage efficiency compared to conventional strainer pipes ■ Prevents re-permeation of flowing wastewater into the ground ■ Can be joined using adhesive for rigid PVC pipes without the need for separate fittings *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Temporary ECO Bind Method

The visualization of hazardous areas contributes to the safety of workers! It is also possible to carry out greening work on the surface.

This technology is a method to ensure safety during construction on slopes that are prone to rockfalls due to surface erosion, such as the back of sediment control dams. It aims to provide short-term slope protection to secure safety during the construction process. By solidifying quickly and suppressing the outflow of fine sediment, it is possible to protect the supporting parts of slopes that have a high risk of rockfalls, thereby improving safety. When deformation occurs, cracks and fissures become visible, making it easier to predict hazards. 【Features】 - Resistant to alkali and salt damage - Can be used in conjunction with vegetation works (vegetation substrate spraying) - Protects the supporting parts of slopes with a high risk of rockfalls, enhancing safety - When deformation occurs, cracks and fissures become visible, making hazard prediction easier - Can be constructed using the same machinery as mortar spraying *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Conical water stop packer

The usage procedure is simple! It can also be installed in the leaking sections of the borehole.

The "Wellhead Water Stop Packer" is a product developed to safely and completely guide the collected groundwater to the surface (inside the collection well) during water collection boring work. The usage procedure is simple: after connecting to the collection pipe, place the product at the desired location, and after removing the casing, just inject cement slurry through the grout injection pipe. (The returnable pipe can be removed immediately after injection.) This ensures that the packer tightly adheres to the borehole wall, allowing for the collection of all harmful groundwater that was not captured by the collection pipe. 【Features】 - Can be installed in leaking sections of the borehole - Compatible with rotary percussion drill hole diameters of φ90 to 135mm - The collection pipe is fixed by the packer, improving the workability of discharge processing - Allows for discharge processing construction with the same diameter as the collection pipe, reducing discharge processing costs - By installing it near the wellhead, it ensures that harmful groundwater is reliably captured and drained through the collection pipe *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Multifunctional filter

Covering and protecting slopes from various changes in weather conditions. Contributing to the restoration of the natural environment.

Introducing the "Multifunctional Filter" handled by Sansui Nabiko Co., Ltd. This product stops the movement of soil particles by covering and protecting slopes, prevents the loss of nutrients in the soil, and creates a growing environment for plants while alleviating various stresses that weather conditions impose on the surface. As a result, it achieves high-quality greening that is rich in sustainability, entrusted to the laws of the natural environment. 【Features】 ■ Enables planned greening of woody and flowering plants ■ Allows for integration and restoration with natural vegetation ■ Creates an environment conducive to the growth of moss and fungi ■ Provides protection and greening functions for river embankments ■ Suppresses frost heave and prevents surface collapse, promoting vegetation *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

屋上緑化工法 「グロウシステム」

シンプルかつ安心な屋上緑化を実現!

「グロウシステム」は、シンプルかつ安心な屋上緑化を実現する屋上緑化工法 です。 簡易的な防水保護と耐根性能を持ち合わせる「防根フィルム(NCKフィルム)」や、薄層屋根緑化での保水量アップとスムーズな排水を行う「保水排水基盤(ソイレンマット M30)」などの屋上緑化に最適な資材を使用しています。 【特徴】 ○シンプルかつ安心な屋上緑化を実現 詳しくはお問い合わせ、またはカタログをダウンロードしてください。

  • Wall and rooftop greenery
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Alkaline soil regeneration material "Dr. pH" [*NETIS registered*]

Neutralize contaminated alkaline soil and regenerate it into green soil! Would you like to reduce the cost of disposing of leftover soil and reuse it?

The alkaline soil regeneration material "Dr.pH" is effective for all types of alkaline soil. Strongly alkaline soil is treated as "industrial waste," leading to high disposal costs and developing into serious environmental issues such as alkaline contamination. In response to this problem, we developed this product with the aim of regenerating alkaline contaminated soil for greening purposes. 【Five Distinctive Features of Dr.pH】 - Regenerates soil for greening and reduces the amount of leftover soil - Reduces costs by 50% through neutralization and reuse - Plants can be installed 10 to 24 hours after application - Composed of materials that are harmless to humans and the environment - Easy to mix with soil *For more details, please contact us or download the catalog.

  • Earthworks
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Residential Upcon Method (Concrete Floor Slab Settlement Correction Method)

For foundation repair work on slab houses due to earthquakes and ground subsidence, leave it to Upcon!

Do you have any of these concerns? ✓ The house is leaning ✓ There are gaps in the windows and sliding doors ✓ The entrance and windows do not close properly ✓ There is an uncomfortable feeling when entering the room ✓ Doors open and close on their own ✓ Experiencing dizziness or headaches ✓ There are cracks or wrinkles in the wallpaper ✓ Balls roll on their own ✓ Water flow has become poor ✓ The water in the aquarium is not level With Upcon, we can quickly correct the tilt of your home! ■ Upcon Method (Concrete Floor Slab Settlement Correction Method) We inject special foam urethane resin under the concrete of the foundation of homes with tilt, correcting it in millimeter increments while continuously monitoring the level. The injected resin expands in a short time, compressing and reinforcing the ground while lifting the foundation to restore it to a straight position. We conduct surveys and construction anywhere in Japan, 365 days a year, including weekends and holidays. Our in-house staff, equipped with the necessary skills and qualifications, will assist you!

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Upcon Corporation Company Profile

Upcon is a company that solves problems with 'urethane.' We quickly correct floor sinking, unevenness, tilting, and gaps using rigid polyurethane resin.

Upcon quickly corrects concrete floors that have experienced sinking, unevenness, tilting, gaps, and vibrations due to ground subsidence or earthquakes, without stopping operations. We repair tilted concrete floors in factories, warehouses, and stores, which are the bases for corporate production and sales activities, as well as in general residences affected by earthquakes and ground subsidence. Additionally, we are engaged in public works using technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is one-tenth of conventional methods. 2. No operational stoppage: No need to move machinery or goods. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-sinking compared to conventional methods. We provide total support from on-site surveys to repair planning and construction, all managed responsibly by our in-house staff. Our specialized and experienced staff propose optimal repair plans tailored to the customer's site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Factory/Warehouse] Upcon Method (Concrete Floor Slab Settlement Correction Method)

If you have tilting, steps, or gaps in factory or warehouse floors due to earthquakes or ground subsidence, then Upcon!

Do you have any of these concerns? ✓ Unable to secure the level of machinery ✓ Warehouse items are not stacked straight ✓ Uneven surfaces make it difficult for forklifts to operate ✓ Cracks have appeared in the floor ✓ Gaps have formed between the floor, walls, and ceiling ✓ Water is pooling due to floor sagging ✓ Insects have appeared inside the building We can solve these problems with Upcon! ■ Upcon Method (Concrete Floor Slab Settlement Correction Method) Concrete floors that have settled, become uneven, tilted, or developed gaps due to ground subsidence and other causes. The Upcon method corrects such floors quickly without stopping operations. Since it can be performed without breaking the existing floor, the construction period is significantly reduced to about 1/10 compared to traditional methods (concrete replacement). There is no need to remove items or machinery, or to install large plants, allowing for construction without halting operations. We conduct surveys and construction anywhere in Japan, 365 days a year, including weekends and holidays. Our in-house staff, equipped with the necessary skills and qualifications, will assist you! *For more details, please refer to the external link page or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Store] Upcon Method (Concrete Floor Slab Settlement Correction Method)

Tilt, steps, and gaps in the store floor due to earthquakes or ground subsidence. We will make corrections quickly without stopping business!

Do you have any of these concerns? ✓ Cracks in the floor ✓ Gaps in the floor, walls, or ceiling ✓ Issues with the opening and closing of automatic doors ✓ Shopping carts move on their own when you let go ✓ The floor is sagging ✓ You feel dizzy and lose your balance when entering the store ✓ Product racks are tilted We can solve these problems with Upcon! ■ Upcon Method (Concrete Floor Slab Settlement Correction Method) Concrete floors that have settled, have steps, tilts, or gaps due to ground subsidence and other causes. The Upcon method quickly corrects such floors without stopping business. Since it is performed without breaking the existing floor, the construction period is significantly shortened to about 1/10 compared to conventional methods (concrete replacement). There is no need to move or remove product racks or refrigerated cases, and installation of large plants is also unnecessary, allowing for work to be done without interrupting business. We conduct surveys and construction anywhere in Japan, 365 days a year, including weekends and holidays. Our in-house staff, equipped with the necessary skills and qualifications, will assist you! *For more details, please refer to the external link page or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Correcting floor subsidence and tilt without stopping business operations!

Floor subsidence caused by earthquakes and ground subsidence. The specialist in subsidence correction, Upcon, will fix the existing floor without demolition and in a short construction period! Over 3,000 successful cases nationwide!

□ Store fixtures and product racks are tilted □ Shopping carts move on their own □ Luggage and products are not stacked straight □ Gaps have formed in the floor, walls, and ceiling □ Cracks have appeared in the floor The issues caused by floor subsidence, tilting, and unevenness will be resolved by "Subsidance Correction Specialist Upcon." With the Upcon method, polyurethane resin is injected under the existing concrete floor, and the pressure from the foam strengthens the ground and lifts the floor. In principle, there is no need to demolish the existing floor, and there is no need to move heavy product racks or store fixtures, significantly shortening the construction period compared to conventional methods. Additionally, we can accommodate construction limited to nighttime outside of business hours, allowing for the correction of floor subsidence without stopping operations.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Large Shopping Center: Correction of Sunken Floor Slab

Correction made during the night while operations were suspended! A case where two construction plant vehicles were used to expedite the construction schedule.

A large shopping center experienced significant floor subsidence due to weak ground. Gaps were observed in various places, such as between the floor and walls and between the walls and ceiling, caused by the floor subsidence. As a result, our company implemented repairs. The "Upcon Method," which can be executed at night during the business closure, was adopted for the repairs. To expedite the construction period, we utilized two construction plant vehicles and completed the repairs over 25 nights. 【Construction Overview】 ■ Construction Area: Approximately 3,240m2 (Backyard 405m2, Store Interior 2,835m2) ■ Maximum Subsidence: 94mm ■ Repairs completed over 25 nights ■ Two construction plant vehicles used to expedite the construction period For more details, please feel free to contact us via the PDF download or inquiry form.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Quickly correct the factory floor's slope and the gaps under the floor with rigid polyurethane foam resin!

Correct the floor tilt caused by earthquakes or ground subsidence without stopping operations and in a short time! No need to move machines or equipment! Also suppress any concerning vibrations from the machines!

■ The level of the machine cannot be secured. ■ The machine is tilted and vibrating. ■ Malfunctions are occurring in the machine, leading to an increase in defective products. ■ Gaps have formed in the floor, walls, and ceiling. ■ Cracks have appeared in the floor. The "Upcon Method" uses polyurethane resin to quickly correct issues caused by tilting or sagging of the floor, as well as voids or gaps that have formed beneath the floor due to earthquakes or ground subsidence. 【What is the Upcon Method?】 Small holes with a diameter of 16mm are drilled into the existing concrete floor where subsidence has occurred. While continuously monitoring the level in millimeter increments, polyurethane resin is injected. The resin injected beneath the floor expands under pressure in a short time, compacting and reinforcing the ground, improving bearing capacity, and pushing the concrete back to a level position. The final strength of the resin is achieved in about 60 minutes. Additionally, if voids have formed beneath the floor, they are filled using the same method. By correcting the existing concrete floor without demolition, the construction period is significantly reduced compared to conventional methods. The polyurethane can lift the floor with a foaming pressure of up to 10 tons per square meter, eliminating the need to move heavy equipment or loads. The deformation of the floor is corrected without stopping the production line.

  • Renovation and repair methods
  • Vibration and Sound Level Meter
  • Vibration isolation, vibration control, and earthquake resistance construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Quickly correct floor tilts, unevenness, and gaps under the floor in warehouses and logistics centers!

Correcting the tilt of concrete floors caused by earthquakes and ground subsidence without stopping operations and within a short period! Solving warehouse floor issues with polyurethane resin!

■The cargo in the warehouse is not stacked straight. ■There are uneven surfaces that hinder the movement of forklifts. ■The racks and other equipment are tilted. ■The floor vibrates. ■Abnormal behavior is observed in the automatic racks. ■The transport robot has stopped. The "Upcon Method" quickly resolves issues caused by floor tilting and sagging due to earthquakes or ground subsidence, as well as voids and gaps that have formed beneath the floor, using polyurethane resin. 【What is the Upcon Method?】 Small holes with a diameter of 16mm are drilled into the existing concrete floor that has subsided, and while constantly monitoring the level in millimeter increments, polyurethane resin is injected. The resin injected beneath the floor expands under pressure in a short time, compacting and strengthening the ground, improving bearing capacity, and pushing up the concrete to correct it. The final strength of the resin is achieved in about 60 minutes. Additionally, if voids have formed beneath the floor, they are filled using the same method. Since the correction is made without demolishing the existing concrete floor, the construction period is significantly reduced compared to conventional methods. The polyurethane can lift the floor with a foaming pressure of up to 10 tons per square meter, eliminating the need to move heavy equipment or products. The floor deformation is corrected without stopping operations.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Fukushima Prefecture, Soma Port Port Maintenance Management Work (Quay Restoration)

Due to ground subsidence at the harbor's quay, there are steps and depressions in the concrete pavement, resulting in the loss of water gradient and the formation of puddles. This issue is resolved using the Upcon method.

The Upcon method, which allows for modifications without breaking existing concrete pavement slabs and within a short construction period, has been widely adopted in public works such as roads and airports as a maintenance and repair method. This time, we will introduce a construction site for correcting the sinking of concrete pavement slabs and filling voids at a quay in a port. The quay at Soma Port in Fukushima Prefecture, where cargo loading and unloading occurs frequently, has experienced issues due to ground subsidence, resulting in steps and sinking in the concrete pavement slabs, eliminating the water slope and causing puddles. This has hindered cargo operations. The Upcon method was chosen because it has no environmental impact compared to other methods and can correct the existing slabs without removal in a short period. [Site Information] Soma Port Port Maintenance Management Work (Quay Restoration) Construction Area: Approximately 285 square meters Maximum Subsidence: 97mm Construction Period: 4 days For detailed information on the construction process, please refer to the PDF download below.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Correction Work for Subsidence of Logistics Warehouse - Leveling Adjustment

"A slope was installed due to the formation of a step in the floor." "The floor has sunk, causing cracks." Resolved with the up-construction method.

This time, we will introduce a construction case of a logistics warehouse in Niigata Prefecture. In this logistics warehouse, ground subsidence caused unevenness and cracks in the concrete floor, which hindered the movement of carts and work operations. The Upcon method allows for construction to be carried out without stopping operations and within a short construction period. Additionally, during the injection of polyurethane resin, a surveyor is always present to manage the floor level to the millimeter, ensuring a high-quality finish. 【Site Information】 Niigata Prefecture / Logistics Warehouse Construction Area: 1,148 square meters Maximum Subsidence: 71mm Construction Period: 8 days

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Filling Work for Void Under Concrete Pavement Slabs of Kanmon Tunnel

Fiscal Year 2013 Shimonoseki Area Preservation Work (Kanmon Tunnel Concrete Pavement Slab Void Filling Work)

The Kanmon Tunnel connecting Fukuoka Prefecture and Yamaguchi Prefecture. When large vehicles pass through the toll booth near the tunnel entrance and exit, vibrations were occurring in the nearby residential area. An investigation conducted by FWD revealed the presence of voids believed to be the cause of the vibrations directly beneath the concrete pavement slabs. The Upcon method is a technique that involves injecting rigid polyurethane resin beneath the concrete pavement slabs. The filling and compaction effects of the polyurethane can resolve the loosening and voids in the subgrade that cause vibrations. The Upcon method was adopted with the aim of suppressing slab vibrations by improving the environment of the upper subgrade. 【Site Information】 Fukuoka Prefecture - Yamaguchi Prefecture / Kanmon Tunnel Total construction area: Approximately 200 square meters Construction period: 2 nights

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Emergency restoration method "Dantan": A new technique by the sinking correction expert Upcon.

Quickly restore road unevenness and depressions during an earthquake with polyurethane resin, enabling swift vehicle passage. Contributing to the establishment of emergency transportation routes!

The new method "Emergency Restoration Method Dantan" developed by Upcon involves spraying high-strength polyurethane resin onto road unevenness caused by disasters during earthquakes to create a slope, enabling temporary vehicle passage for the early establishment of emergency transportation routes. A truck equipped with all necessary materials rushes to the site and sprays a two-component polyurethane resin onto the created unevenness. The high-strength polyurethane resin has the property of hardening immediately after spraying, allowing for vehicle passage within 15 minutes after the slope is created. Additionally, it can be used to repair not only unevenness but also depressions and subsidence. Features of the Emergency Restoration Method Dantan: - Ability to create slopes tailored to the shape of the disaster-affected site - Resolution of unevenness in about one hour, allowing immediate vehicle passage Furthermore, it has a proven track record in correcting tilts and unevenness of concrete floors and pavement slabs caused by earthquakes or ground subsidence, as well as filling voids. [Exhibiting at EE Tohoku '23] We will be exhibiting at the comprehensive exhibition of new technologies, EE Tohoku '23. At our booth, we will conduct demonstrations using polyurethane resin. Location: Yume Messe Miyagi Dates: June 7 (Wed) - 8 (Thu) Booth No: West Hall Exhibition B-708

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Highway Toll Booth Concrete Pavement Leveling

Quickly repair the unevenness of the concrete pavement slabs at the highway toll booth.

A step in the concrete pavement caused by sinking. It affected vehicle movement when passing through the toll booth on the highway. We injected polyurethane resin under the sunken concrete pavement slab and corrected the 30mm step in a short time. 【Site Information】 Ehime Prefecture Total construction area: Approximately 12 square meters Construction period: One night Maximum step height: 30mm Please watch the fast-motion video showing the concrete pavement slab being lifted by the foaming pressure of the polyurethane resin from below.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Concrete slab sinking correction method" contributes to the longevity of social infrastructure.

Using high-strength urethane resin, we will correct the deformations such as subsidence, steps, flapping, gaps, and cavities that have occurred in the concrete slab, without excavation and within a short construction period.

The Upcon concrete slab settlement correction method (KT-080008-A, NETIS registration period ended in October 2014) quickly resolves issues such as settlement, unevenness, flapping, gaps, and voids that occur in concrete pavement slabs commonly used in highways and other areas, using specially developed high-strength polyurethane resin. It achieves a short construction period by utilizing a highly mobile plant without breaking the existing pavement slabs or requiring excavation work. This minimizes the period of service suspension and has a proven track record as a planned and efficient method for maintaining social infrastructure. This technology is also adopted not only for highways but also for repair work in ports and airport aprons, as well as disaster recovery work. Upcon will exhibit at the "Highway Techno Fair 2023," where cutting-edge technologies supporting highways will be showcased. Date: November 9 (Thursday) and 10 (Friday), 2023, from 10:00 to 17:00 Location: Tokyo Big Sight, West Hall 3 Exhibition Booth No: A-04 On that day, there will also be a demonstration of settlement correction using polyurethane resin. We invite you to take this opportunity to see it. We look forward to your visit.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Short-term Correction: Certain Food Warehouse Void Filling Work

Upcon construction method using rigid polyurethane foam! Introducing a case where a cavity was corrected in three days.

We would like to introduce a case of "void filling work" conducted at a certain food warehouse in Kanagawa Prefecture. Using the Upcon method, which allows for the filling of voids that developed under the floor with polyurethane resin in a short period, we corrected a maximum void of 270mm (with a construction area of approximately 171m2) in just three days. After the resin filling, we checked the filling condition with a CCD camera and used non-shrink mortar to seal the injection holes. 【Case Overview】 ■ Construction Area: Approximately 171m2 ■ Maximum Void Size: 270mm ■ Location: A certain food warehouse in Kanagawa Prefecture ■ Construction Period: 3 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration