Construction method Product List and Ranking from 1597 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 日本海洋サービス 大阪支店 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 Temporary bridge temporary pier cable-stayed construction method "LIBRA Method" 横山基礎工事

Construction method Product List

1381~1395 item / All 4237 items

Displayed results

Prestressed Concrete Pile "TAFCO-PHC Pile"

High-strength (85 N/mm²) prestressed concrete piles

"TAFCO-PHC piles" are a representative example of high-strength prestressed concrete piles used in a wide range of fields. The design strength of the concrete is 85 N/mm², and due to effective prestressing, they are classified into types A, B, and C, with outer diameters ranging from 300 mm to 1000 mm. These products fall under the category of piles as per JIS A 5373 Appendix E. 【Product Specifications】 ■ Concrete Strength (N/mm²): 85 ■ Pile Diameter (mm): 300-1000 ■ Wall Thickness Type: S ■ Classification: A/B/C ■ Pile Length (m): 4-15 *For more details, please download the PDF or feel free to contact us.

  • Concrete sheet piles and piles

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Outdoor wood protection liquid glass paint - Perfect Crystal method

Liquid glass paint for wood enhances wood against UV rays, water, heat, and microbial contamination, contributing to a longer maintenance cycle.

"Crystal Wood" is a paint that penetrates wood with nano-sized silicon oxide. While utilizing the natural characteristics of wood, such as natural breathing and humidity regulation, it overcomes the drawbacks of wood and demonstrates long-term durability. Furthermore, it pursues medical safety that sets it apart from organic paints, being composed entirely of inorganic components. 【Features】 ■ The natural scent of wood is preserved. ■ It prevents dirt and UV degradation, maintaining the beauty of the wood grain. ■ It prevents slipping, splinters, and rough edges in the wood. ■ With excellent water repellency, it protects against corrosion and termite damage. ■ It suppresses the white bloom phenomenon in non-combustible and semi-non-combustible wood. ■ With a unique ultra-thin film method, there is no peeling of the paint film. *For more details, please refer to the PDF document or feel free to contact us.

  • Wood processing
  • Exterior coating materials
  • Interior coating materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Cypress bath and wood regeneration glass coating method

A new technology for the regeneration method that maintains the aesthetic appearance of aged and deteriorated wood over the long term, addressing issues such as discoloration, splinters, mold, rot, dirt, and damage!

Glass paint for wood is a top-quality wood coating that possesses discoloration prevention, antibacterial, and antifungal properties. The inorganic glass film prevents the deterioration of wood and exhibits excellent water repellency. It also reinforces wood fibers, preventing splinters and rough edges. This technology is medically safe, allowing for worry-free use in venues such as assembly halls, hot spring facilities, and food factories. 【Features】 ■ Reduces slipping, staining, and UV degradation of wood ■ Suppresses mold and excels in water repellency ■ Prevents wood rot, damage, and termite infestation ■ Can suppress efflorescence in non-combustible and quasi-non-combustible wood ■ Widely adopted in buildings made of CLT, a technology currently in the spotlight

  • Exterior coating materials
  • Interior coating materials
  • Wood processing

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Comprehensive Catalog: Disaster Response Works

We provide technologies to protect human life and property from natural disasters such as earthquakes and avalanches!

This catalog is a comprehensive guide featuring various disaster prevention measures handled by Toes Co., Ltd., a company specializing in rockfall, avalanche, and disaster prevention measures. With extensive experience and achievements in landslide prevention, avalanche countermeasures, rockfall protection, emergency disaster response, and temporary protective fences, we propose products and methods that satisfy our customers. [Contents] ■ Disaster prevention measures (slope and landslide countermeasures) ■ Rockfall countermeasures ■ Snow prevention measures ■ Other handling methods *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Kuroton Co., Ltd. Business Introduction

I want to make people happy through architecture.

Crotone Co., Ltd. conducts research, design, construction, planning, brokerage, and management through architecture, helping to shape the diverse and flexible wishes of our customers. We aim to be the best partner that continues to realize the essential value and the wishes of our clients. 【Main Business Activities】 ■ Research ■ Design ■ Design and Construction ■ Planning, Brokerage, and Management *For more details, please download the PDF or feel free to contact us.

  • Consulting companies

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Thermo Barrier Sky Method

Solving the challenges of heat-insulating coatings! A method of attaching Sky Sheets along the standing seam roof with double-sided tape.

The "Sky Method" is a construction technique that uses aluminum foil, which excels in reflecting radiant heat, to apply Sky Sheets. It provides a uniform heat insulation effect regardless of the skill level of the workers or the weather conditions during the work. Additionally, it also prevents rain leaks, which are common in folded plate roofs, allowing for both heat and rain leak measures to be implemented simultaneously in one installation. Please feel free to consult our company when you need our services. 【Features】 ■ Significantly reduces temperature rise in folded plate roofs ■ Greatly improves workability ■ Achieves stable heat insulation effects and rain leak prevention *For more details, please refer to the PDF materials or feel free to contact us.

  • Heat insulation and heat shielding methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Converting a single-story factory into a two-story factory while maintaining the equipment.

Non-stop construction method for factory operations" - Hokuriku Light Metal Co., Ltd. "Cover Build Method

The "Cover Build Method" involves assembling a steel frame to cover an existing building, first constructing the roof and exterior walls to prevent rain and wind from entering. After securing the exterior, the interior of the existing building is demolished, and reconstruction takes place. In the case of Hokuriku Light Metal, which is engaged in metal processing, a partition wall was first established to separate the construction area from the factory operation area, and a new building frame larger than the factory was constructed. Subsequently, the roof and exterior walls of the new building were completed, and while protecting the machinery, the existing building was demolished. Additionally, the second-floor slab inside the new building was constructed, allowing operations to continue without relocating the machinery, thus achieving reconstruction through a two-stage process. Through the Cover Build Method and floor division construction, it was transformed into a spacious two-story factory. 【Construction Targets】 ■ There are immovable machines ■ There is space around the building ■ The existing building is a single-story structure ■ Switching production operations is easy *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Expanding the existing eaves to create an indoor space that is protected from rain.

Construction method that does not stop factory operations - First Plus Co., Ltd. 'Big Roof Method'

The "Big Roof Construction Method" is a technique for safely extending roofs, such as eaves that protrude from buildings. In this case, the customer wished to extend an existing 10-meter eave by an additional 7 meters while also enclosing the entire loading area indoors to allow for work to be done without getting wet from the rain. Therefore, we developed a structural plan that incorporated the "Cover Build Method," constructing a new frame that covers both the extension area and the existing loading eave area. This allowed us to expand the loading area while maintaining operations during construction and enclosing it indoors. Considering the entry and exit of trucks, we adopted aluminum over-slider shutters for the opening doors. The existing eave was integrated into the new roof, resulting in a spacious indoor loading area with sufficient strength. 【Construction Requirements】 ■ There is ample space in front of the building. ■ The existing building has passed inspection. *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Factory reconstruction method "Cover Build Method" allows for rebuilding while maintaining factory operations!

Are you having trouble with a machine that won't move? Yoshizawa's unique construction method allows you to maintain factory operations while replacing it.

The "Cover Build Method" is Yoshizawa's unique construction technique that allows for rebuilding while maintaining factory operations. We conduct thorough hearings regarding the main equipment of the factory and its usage frequency, and we carry out the construction under appropriate schedule management to ensure that the building process and factory operations can coexist. First, we assemble steel frames to cover the existing building and construct the roof and exterior walls. After ensuring that rain and wind do not enter from the outside, we dismantle the interior of the existing building and proceed with the rebuilding. [Recommended for such factories!] ■ There are machines that cannot be moved ■ There is space around the building ■ The existing building is a single-story structure ■ It is easy to switch production flow *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Factory Reconstruction Method "Connection Method"

Integrating the buildings while ensuring smooth flow to improve work efficiency 【Contributing to increased productivity and the smooth operation of production lines!】

The "Connection Construction Method" refers to a technique where a new building (or an extension) is constructed between two or more existing buildings that are located apart from each other, aligning the floor levels to integrate the previously independent structures. This construction creates pathways between areas that were originally separate buildings, leading to expected benefits such as improved productivity and smoother production lines. [Recommended for such factories!] ■ Want to make the most of existing buildings ■ Want to create connections between each building that stands independently on the site *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Connection Method

Connecting buildings that were separated! You can make effective use of dead space within the site.

The "Connection Construction Method" involves constructing a new building (or an extension) that aligns with the floor level of two existing buildings that are separated by a gap, thereby integrating (linking) the previously disconnected structures. This method allows for the effective use of dead space within the site, enabling operations to continue without being affected by weather conditions when moving between factories. Furthermore, the creation of new pathways in what were originally separate buildings can lead to improvements in productivity and smoother production lines. 【Features】 ■ Integration (linking) of previously disconnected buildings ■ Effective use of dead space within the site ■ Operations can continue without being affected by weather conditions when moving between factories ■ Potential for improvements in productivity and smoother production lines *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Next, the scaffolding method "Ethon Hall."

A mounting method for solar power installation that does not require drilling holes in the roof!

"Esunon Hall" is a construction method that eliminates the need to drill holes in the roof to fix adhesive method fittings with adhesive, thus removing concerns about leaks. For heavy loads, it is possible to increase the number of receiving members adhered to the roof to distribute the load. Additionally, it allows for approximately a 25% reduction in labor and a shortening of the process compared to conventional methods. 【Features】 ■ Compatible with any roof shape ■ Installation without damaging the roof or drilling holes ■ Improved power generation with true south installation (also acceptable for roofs not facing true south) ■ 25% reduction in work due to the adhesive mounting method *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Anchorage Column Fixing Method "U-Wedge Frame"

Securely fixed with pressure and adhesive force from wedges! Anchorless girder fixation method.

The "U-Wedge Frame" is a new anchoring method that creates a significant pressing effect by arranging wedges inside the frame, allowing for fixation on the surface of the girder. Since the anchoring function can be achieved solely through work on the wedge arrangement on the girder surface, it enables frame fixation without affecting the internal structure, such as rebar in concrete structures, thus preventing a decrease in the structural capacity. Conventional anchor bolt fastening methods require drilling at the anchor installation site and associated rebar detection, but this method does not require such tasks, resulting in excellent workability and reliable cost reduction. 【Features】 ■ Can be securely fixed to the structure ■ Can be constructed with simple processing ■ Allows frame fixation without affecting the internal structure ■ No need for drilling at the anchor installation site or rebar detection ■ Excellent workability and cost reduction *For more details, please visit our website or feel free to contact us.

  • Bridge Materials
  • Bridge Construction
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pile Foundation Reinforcement Method "Σ-i (Sigma-I)"

Advanced piles protect buildings. We have consolidated all the necessary elements for steel pipe piles.

"Σ-i (Sigma-I)" is a pile-type ground reinforcement method that involves inserting a pile equipped with four cutting blades and spiral wings into the ground while rotating it. This method consolidates various elements necessary for ground reinforcement, including high pile performance, reliability and safety in construction, and consideration for the environment and neighboring areas. Furthermore, by improving the structure of the tip wings, it has successfully achieved a balance between pile performance and cost reduction. 【Features】 ■ Reliable bearing capacity ■ Development of a new type of tip wing ■ Consistent management system ■ Consideration for the environment ■ Compatible with various ground conditions *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Dry construction method

Repairs, reinforcement, and diagnosis of marine and river structures are possible! It is not affected by waves, currents, or turbidity.

The "Dry Method" is a technology that enables more reliable and high-quality repairs by utilizing a dry box to create a dewatered state. Many seawalls and revetments show significant localized corrosion, pitting, deterioration, and damage, particularly in splash zones and below low tide levels. This method allows for total maintenance, including repairs to marine steel structures such as steel sheet piles in splash zones and tidal zones, as well as upper concrete. 【Features】 ■ Accurate investigation of damage conditions through visual inspection ■ Safe, reliable, and rapid construction ■ Unaffected by waves, currents, or turbidity, and allows for nighttime work ■ Ensures a working environment comparable to land, significantly improving construction accuracy ■ Enables simultaneous construction of reinforcement work in addition to repair work *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration