Construction method Product List and Ranking from 1597 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 日本海洋サービス 大阪支店 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 Temporary bridge temporary pier cable-stayed construction method "LIBRA Method" 横山基礎工事

Construction method Product List

1396~1410 item / All 4237 items

Displayed results

Insulation Material Injection Precast Composite Floor Slab Method 'DM Board Slab'

This is a method for casting PCa synthetic floor slabs that significantly improves the working environment in narrow pits!

The "DM board" is a half precast floor slab with insulation material embedded, allowing for construction without support. By using the "DM board" for the first-floor slab with a pit, it eliminates the need for setting insulation, formwork, and the removal and transportation of supports. [Features] ■ Can be constructed without support ■ Reduction of construction types and shortening of construction period ■ Compatible with inserts and sleeves ■ Lightweight, allowing for VE proposals as well

  • Other flooring materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FC slab construction method

After the concrete hardens, it is completely integrated with the FC board, forming a strong composite slab.

We would like to introduce the "FC Panel Slab Method." This method allows for the construction of long-span slabs without the need for temporary supports. Since prestressing is introduced, long-term creep deflection is extremely minimal, and it has the characteristic of being strong against cracking. Additionally, as it becomes a composite slab, the amount of rebar and concrete is reduced compared to conventional RC slabs. 【Features】 ■ Long-span slabs can be constructed without temporary supports ■ Long-term creep deflection is extremely minimal due to the introduction of prestressing ■ Strong against cracking ■ Thin sections can be easily notched or drilled for piping using a concrete cutter ■ Has sufficient recovery strength against excessive loading *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sand slit method

Improving the permeable functions of grounds and turf pavement! A construction method that takes the environment into consideration by not generating excavated construction waste.

Introducing the "Sand Slit Method" by Hasegawa Sports Facilities. By using a specialized machine, we simultaneously perform minimal trench excavation and filling, which means there is no construction waste generated from excavation. Compared to conventional drainage systems, this method is completed in a short time, has lower economic burdens, and is environmentally friendly. 【Features】 ■ Improves the permeability of grounds and turf surfaces ■ Does not generate construction waste from excavation ■ Completed in a short time with lower economic burdens *For more details, please refer to the PDF document or feel free to contact us.

  • Pavement construction
  • Paving Materials
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SS Type Super Stroke Solenoid Product Catalog

Introducing the "SS Series," capable of driving significantly longer strokes!

This catalog features the solenoid "SS Series," which can be used for long strokes. We handle products such as "S75SS," which enables significantly longer stroke drives, as well as "S100SS" and "S125SS." [Contents] ■ Features and usage of the SS Series ■ Coil rating table ■ Stroke-thrust characteristics ■ Current-thrust characteristics ■ Appearance diagrams *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to the "Suberaz Method"

Just clean it! You can really feel the anti-slip effect.

The "Non-Slip Method" cleans and removes dirt from tiles, which is one cause of slipping, while simultaneously creating fine indentations on the surface of the material. When wet, this surface utilizes surface tension to exhibit adhesive properties that prevent slipping. This method can treat large areas at once, such as public facilities and walkways, improving the current situation without taking much time, thus keeping costs low. 【Features】 ■ Quick and cost-effective ■ Can be applied to polished surfaces, making maintenance easy ■ No visible change, preserving aesthetics ■ Long-lasting effects (3 to 7 years) ■ Can treat large areas at once *Service areas: All regions of Aichi, Mie, Gifu, and Shizuoka Prefectures. For other regions, please consult us. *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pull-out method "Nukki SDS"

We will introduce a method for easily extracting anchors embedded in concrete.

"Nucky SDS" is a pull-out tool that allows for easy extraction of cut anchors. If anchors that have been temporarily fixed are left as they are, they can cause rust that stains the exterior walls of structures and ultimately lead to cracks in the concrete of the building. This product employs a unique method that solves these difficult issues all at once. 【Target Anchor Names】 ■ CA Anchor (Cut Anchor) ■ Grip Anchor GA ■ Ruti Cut Anchor ■ Hawk Cut Anchor ■ Nut Anchor, etc. *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Air Formwork Method "Air Fence"

Highly effective for construction joints and concrete curing partitions! It's a labor-saving method for a new era.

"Air Fence" is an air-pressure type formwork used for pressure-resistant slabs, beams, walls, and joint sections in concrete construction. Compared to traditional lath methods, it achieves improved water resistance, workability, and cost reduction. Additionally, its easy demolding prevents foreign objects from remaining inside the structure, playing a crucial role in maintaining the strength of joint sections and the durability of the building. 【Features】 ■ Quality improvement ■ High water resistance ■ Reduction of running costs ■ Cost reduction ■ Increased joint strength, etc. *For more details, please download the PDF or feel free to contact us.

  • Wood panel and frame wall construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reinforced soil method - Greenery tail arm method (Terra Trail F2 method)

Harmony with nature, tranquility. Now, Hirose reflects anew.

The greening tail arm method, as its name suggests, is designed to allow for the greening of the surface of tail arm embankments. The basic principle of the method is the same as that of the tail arm method, but instead of using heavy concrete skins, it employs mesh panels and vegetation mats, making it even easier to construct. The greened embankment surface harmonizes with the surrounding environment in suburban and mountainous areas.

  • Reinforcement and repair materials
  • Earthworks

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reinforced Soil Method - Super Dagu Shim Method

Surpassing the conventional rebar insertion methods! The definitive technique for slope stability reinforcement.

The Super Dugshim method, like the EP route pile method, is a reinforcement technique designed to prevent natural slopes and ground from collapsing. In the route pile method, a hole is first drilled into the ground using a steel pipe, and then filled with a rebar core and mortar; however, in the Dugshim method, all of these tasks can be performed simultaneously.

  • Earthworks
  • Piles, caissons, sheet piles
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reinforced soil method - High-strength micro-pile method

Leave it to us for high-durability micropile construction methods.

The high-strength micropile method involves leaving a high-strength steel pipe, called casing, in the ground as a pile after drilling a hole into the ground. This method is used to support the foundations of bridges and buildings, as well as to reinforce natural slopes and prevent landslides or ground collapses.

  • Earthworks
  • Piles, caissons, sheet piles
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Self-supporting large block NSS block

We aim to achieve harmony with nature, landscapes, and local communities, striving for a more comfortable amenity experience.

The NSS block is a large block retaining wall made of reinforced concrete that is integrated between blocks (in accordance with road earthworks guidelines). Instead of the conventional concrete used in the core section, crushed stone will be used. By adopting a reinforced structure in accordance with the road earthworks guidelines, the NSS block allows for a reduction in concrete volume and cost compared to traditional gravity retaining walls.

  • Aggregates and crushed stone
  • Dam construction
  • Retaining wall

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Expanded Polystyrene Civil Engineering Method "EPS Method"

Ground treatment and temporary construction work are simplified, resulting in a shortened overall construction period! Reduced total construction costs after completion.

The "EPS method" involves stacking large blocks of expanded polystyrene as fill material, effectively utilizing the characteristics of the material such as lightweight, compressive strength, water resistance, and self-supporting properties when stacked. It can be applied in areas where there is a need to reduce load and soil pressure, such as fill on soft ground, fill on steep slopes, backfilling for structures, vertical walls, and widening of embankments. The overall construction period can be shortened as ground treatment and temporary works are simplified. Additionally, it offers numerous benefits, including a reduction in overall construction costs, including maintenance after completion. 【Features】 ■ Ultra-lightweight and wide applicability - Unit volume weight is 0.12 to 0.35 kN/m3 - When applied as fill on soft ground, it can significantly reduce load and solve issues such as settlement and insufficient bearing capacity of the soft ground. *For more details, please refer to the PDF document or feel free to contact us.

  • Road construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Riverbank protection tail arm method "Aqua Tail 35"

Demonstrating the impact resistance of wall panels (14cm thick) at the actual construction site!

We would like to introduce our proposed riverbank protection tail arm method, "Aqua Tail 35." It ensures the durability of the wall panel against flowing water. It conforms to the structural model "stacking model" equivalent to large blocks in the "Ministry of Land, Infrastructure, Transport and Tourism River Erosion Control Technical Standards" and "Mechanical Design Method for Riverbanks." By using crushed stone as fill material below the river water level, it responds to rapid changes in water levels. 【Features】 ■ Ensures the durability of the wall panel ■ Adaptable to areas prone to salt damage ■ Achieves significant cost reduction and shortened construction time ■ Confirms safety during flooding ■ High stability during construction *For more details, please download the PDF or feel free to contact us.

  • River construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Concrete Product Case] Kanagawa Prefecture: Foundation Block SUS Burial

We have embedded SUS bolts in the foundation! A manufacturing case in Yokohama City.

Here is a product case of "SUS embedded foundation block" in Kanagawa Prefecture. We embedded SUS bolts into the foundation. The product dimensions are a concrete foundation of 250□×H350 with a chamfer on the top surface, (SUS) M12 bolts x 4, with a protrusion of 20mm and a pitch of 110mm. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Product Dimensions - Concrete foundation 250□×H350 with a chamfer on the top surface - (SUS) M12 bolts x 4, protrusion of 20mm, pitch of 110mm ■ Installation Location: Yokohama City, Kanagawa Prefecture ■ Installation Period: February 2021 *For more details, please refer to the related links or feel free to contact us.

  • Foundation construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic retrofitting method for specific ceilings: "Fail Support Method"

Seismic retrofitting methods suitable for fall prevention measures for specific ceilings.

The "Fail-Safe Support Method" is a seismic retrofitting technique specifically designed for existing ceilings, where support materials and nets are installed directly beneath the existing ceiling and connected to the structural framework to prevent the drop of suspended ceilings. Structural components integrated with the building's framework are installed around the perimeter of the ceiling, and by fastening them to a grid-like support material arranged beneath the ceiling surface, the displacement of the ceiling during an earthquake is suppressed. Additionally, a high-strength fiber material net, which is sandwiched and integrally screwed between the support material and the ceiling surface, continues to support the ceiling components in the event of a ceiling collapse, preventing them from falling. 【Features】 - Minimizes partial dismantling of the existing ceiling. - Allows for continued use of the facility during construction. - Compared to traditional methods that involve completely removing the existing ceiling and installing a new seismic ceiling, this method allows for shorter construction periods and lower costs. *For more details, please download the PDF or contact us.

  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration