Construction method Product List and Ranking from 1597 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 日本海洋サービス 大阪支店 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 Temporary bridge temporary pier cable-stayed construction method "LIBRA Method" 横山基礎工事

Construction method Product List

1366~1380 item / All 4237 items

Displayed results

★Typhoon, rain leakage, energy-saving measures! "Sustainable Roofing Method" Service★

It will be reborn as a roof that matches the needs of the times in about two weeks!

Do you have any of the following concerns or needs? ● Concerns 1. I want to address leaks caused by the aging of the slate roof at my facility... 2. I want to address noise (leak sounds, rain sounds) caused by the above issue... 3. I want to carry out repair work without stopping operations for the above issues... ● Needs ☛ A roof that is resilient to natural disasters ☛ A roof with high energy-saving effects ☛ A safe roof that does not release asbestos ☛ A roof that can accommodate solar panels in the future In response to the above concerns and needs, we propose the "Sustainable Roofing Method"!

  • others
  • Planting work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Meltorch Waterproofing Construction Guide] Introduction to Waterproofing Materials and Waterproofing Methods

Introduction to modified asphalt waterproofing, torch method, and other waterproof materials and methods!

There are various types of "waterproofing materials and methods," but for the waterproofing of building rooftops, it is common to use materials and methods that create a waterproof membrane on the concrete surface. Such waterproof layers are highly reliable and are widely used in many buildings. Since each waterproofing material and method has its own characteristics, the choice of method is determined by considering the type, structure, size, location of the building, and the conditions at the construction site. 【Types of Waterproofing Methods】 ■ Asphalt Waterproofing Method ■ Modified Asphalt Waterproofing / Torch Method ■ Sheet Waterproofing Method ■ Coating Waterproofing Method *For more details, please refer to the PDF materials or feel free to contact us.

  • Waterproofing work
  • Waterproof sheet

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Waterproofing method that creates a waterproof membrane on concrete surfaces, suitable for large-scale repairs.

The waterproof layer is highly reliable and can adapt to the conditions of the construction site.

There are various types of "waterproof materials and waterproof methods," but for the waterproofing of building rooftops, materials and methods that create a waterproof membrane on the concrete surface are common. Such waterproof layers are highly reliable and are widely used in many buildings. Since each waterproof material and method has its own characteristics, the choice of which method to adopt is determined by considering factors such as the type, structure, size, and location of the building, as well as the conditions of the construction site. ■ Examples of construction - Kanagawa Prefectural Housing Supply Corporation - Yuru no Kidai Housing Complex - Azukizawa Family Park - Clean Cove Minami-Ozawa - Chambord Mita

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Inorganic Adhesive "FJ515 Heating Foaming Type"

Enhancing the non-combustibility and fire resistance of organic foams and building materials! Heat-foaming type inorganic adhesive.

The "FJ515 Heating Foam Type" is a 100% inorganic, water-based, one-component, heating foam type inorganic adhesive. It expands 5 to 10 times due to flame, forming a strong fire-resistant insulation layer. It enhances the non-combustibility and fire resistance of organic foams and building materials. 【Features】 ■ Rapid curing due to the evaporation of moisture (dehydration condensation reaction) ■ When rapidly heated to 150°C to 200°C, it expands 5 to 10 times and forms a fire-resistant insulation layer ■ No volatile substances or harmful gases are generated during drying ■ Non-combustible, highly heat-resistant, and does not degrade under ultraviolet light ■ Viscosity can be adjusted as desired by adding water or hot water *For more details, please refer to the PDF document or feel free to contact us.

  • glue

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Permanent anchor method "KTB - Load Distribution Type Permanent Anchor Method"

NETIS registered! A construction method that achieves quadruple corrosion protection throughout.

The "KTB Load Distribution Permanent Anchor Method" is a revolutionary structure that achieves load distribution by providing multiple load-bearing bodies. Localized concentration of load is avoided, preventing cracks in the grout. Additionally, it boasts excellent long-term corrosion resistance, durability, and structural stability. 【Features】 - The design anchor load is reliably distributed to the ground through several load-bearing bodies. - Uses fully coated PC steel strands "SC Strand" for tendons, ensuring complete rust prevention. - The number of strands is set according to the design anchor load. - Allows for changes in anchor length on-site in response to changes in geological conditions. *For more details, please feel free to contact us.*

  • Civil Engineering Method
  • Ground foundation construction method
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Deep Mixing Method "ECM Method"

"BCJ-Examination Certificate-66" Deep Mixing Method Using Cement-Based Solidification Material

The "ECM method" is a ground improvement technique that uses cement-based solidifying materials and specialized machinery to drill (penetrate) to relatively deep depths, mixing soil with the solidifying materials. Construction is carried out using a dedicated construction machine equipped with an IC card recording construction management device, ensuring uniform quality regardless of the soil types, such as sandy soil, clay, or loam. The method is based on a two-cycle construction process, with the first cycle at a standard speed of 1m/min and the second cycle at 2m/min. [Examples of On-Site Construction] ■ Fresh System Saitama Center New Construction Project (tentative name) ■ Kanagawa Institute of Technology New Lecture Hall Construction Project ■ New Construction of the Japanese Embassy Office in Benin ■ Strengthening Plan for Punjab State Technical College ■ New Construction of Honda Parts Sales Co., Ltd. Aichi South Sales Office *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Vibration Isolation System Suspended Ceiling "Saxis Ceiling W"

Lightweight, unbreakable, and won't fall! Seismic drop prevention lightweight ceiling system.

The "Sakushisu Ceiling W" is a suspended ceiling system that absorbs and disperses horizontal vibrations during an earthquake by placing movable ceiling panels at the points where the ceiling's outer perimeter meets the walls, allowing for vibration absorption. By inserting lightweight ceiling panels weighing less than 2 kg/m² into rails attached to the ceiling substrate with suspension bolts, vertical vibrations during an earthquake are controlled through the clearance of the rails. Additionally, by equipping the ceiling space with a fall prevention net, even if the ceiling substrate collapses, the net will prevent damage to the ceiling. 【Features】 ■ A completely new vibration-absorbing ceiling structure developed for disaster prevention and mitigation ■ The fall protection net in the ceiling space prevents damage to the ceiling *For more details, please download the PDF or feel free to contact us.

  • System ceiling

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Long-term repair plan

As the number of times increases, it is important to significantly improve the ratio! Manage construction from the customer's perspective!

Large-scale repair work is a renovation project that restores the original performance of a building that has deteriorated over time since its construction. Additionally, we also carry out improvement work aimed at responding to social changes and legal requirements, as well as maintaining the building's functionality and enhancing its asset value. Our company has over 30 years of extensive experience in condominium and building renewal projects. We respond to customer needs through our track record in repair work and a wide variety of improvement projects, realizing enhancements to living environments that change with the times. From the standpoint of a total renewal specialist, we are committed to being of service to everyone. 【Flow of Repair Work (Example)】 ■ Hearing: Explanation to the management association → Consideration → Contract ■ Preliminary Survey: Information gathering → Preparation of survey guidelines → Preliminary survey → Reporting ■ Main Survey: Preparation of main survey construction guidelines → Implementation of main survey → Preparation of survey report ■ Preparation for Construction: Discussion of implementation scope → Preparation of construction plan → Resident briefing session ■ Construction and Aftercare: Implementation of construction → Interim inspection → Completion tour → Aftercare *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods
  • Unit and other construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Remote-controlled autonomous robot "Telework Robot"

Remote operation enables transportation, monitoring, and conversation! The operation is simple, and no knowledge of robots is required!

What is a "Telework Robot"? It is a robot that enables transportation, monitoring, and conversation through remote operation, even when no one is physically present. Since the robot itself is equipped with a communication module, it can be operated remotely, unlike remote-controlled devices. This allows you to engage in work without having to go to the site. The operation is simple, and no prior knowledge of robots is required! 【Features】 - No initial setup is needed, so it can be used immediately. - It can be operated remotely from distant locations within the same facility or from different facilities (such as home). - Conversations can be conducted through the monitor installed on the robot. - It can carry items by loading them onto a cart. - Its compact size allows for use in narrow spaces. - Remote operation from the controller is very easy. *For more details, please contact us.*

  • Automated guided vehicles (AGV, RGV)
  • Automatic transport robot
  • Transport machinery

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Soil-cement wall construction method "ECW Method"

Soil cement method that reduces discharged mud using a unique hardening agent injection system!

The "ECW Method" is a groundbreaking column-type soil-cement wall construction method that simultaneously achieves cost reduction and environmental conservation. It does not require special machinery or chemicals, and by re-evaluating the injection method of the hardening material, it reduces construction sludge and also decreases the amount of hardening materials. Born from the concept of reduction (prevention of generation), the ECW Method leads the way in environmental compatibility for soil-cement construction methods. 【Features】 ■ CO2 reduction ■ Reduction of discharged sludge and hardening materials ■ Excellent economic efficiency *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Instruction Manual] Nano Mente SB Method

We will decompose dirt with a newly developed special cleaning agent and perform a special glass coating.

The "NanoMente SB Method" is a revolutionary cleaning coating agent designed to reduce costs and maintenance compared to traditional cleaning methods. Using a newly developed special cleaning agent (SB cleaning agent), it performs cleaning work that decomposes dirt that has been difficult to remove until now, along with a special glass coating using NanoMente water. This document clearly explains the procedure of the method and provides examples of construction with diagrams and photos. [Contents (partial)] ■ Explanation of the NanoMente SB Method ■ Effects of the SB Method ■ Safety of the cleaning agent ■ NanoMente coating work procedures ■ Examples of construction using the NanoMente SB Method *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Home Connector Construction Method Catalog

Ultimate wood joint hardware (high strength, high rigidity, no exposed hardware, compatible with frame structures)

The home connector is a hardware that allows for strong, beautiful, and easy joining of wood, commonly referred to as GIR. It can be used not only for general wood joints and connections but also as a joining hardware for structural frameworks such as frame structures.

  • Housing structure technology/long-term superior housing technology

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to the high-support capacity pile driving method "MRXX Method"

A high-support pile method that allows for significant apex support strength due to the establishment of high-intensity expanded root solidification bulbs.

At Toyo Asano Co., Ltd., we offer the 'MRXX Method,' which generates high bearing capacity by securing ST piles with special fittings at the pile tip to enlarged root solidification bulbs. The enlarged root solidification bulbs are constructed significantly and reliably using a hydraulic expansion wing drilling bit. Additionally, we utilize a dedicated construction management device to monitor the process, allowing real-time visual observation of the integral current values and the construction status of the enlarged root solidification bulbs. 【Method Overview】 ■ High tip bearing capacity ■ Compatible with various ground conditions ■ Minimal impact on the surrounding environment ■ High horizontal resistance ■ Reliability of enlarged excavation ■ Ensured construction management *For more details, please download the PDF or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pre-boring expansion grouting method "Hyper-Straight Method"

A construction method that can accommodate various ground conditions, with high load-bearing capacity and low cost.

The "Hyper-Straight Method" involves pre-drilling the ground with an auger, followed by the injection of solidification liquid and pile surrounding fixation liquid, allowing the pile to be inserted into the designated support layer by self-sinking or rotation, achieving a depth of 1D or more. Using a drilling and mixing device composed of an auger head, screw, mixing rod, and connecting rod, the construction process follows the steps from drilling to the injection of solidification liquid, repeated solidification above and below, injection of pile surrounding fixation liquid, repeated fixation above and below, and finally pile insertion and installation. Additionally, by implementing a construction management system that supports high precision and efficiency, real-time management of the solidification bulb and support layer is conducted to ensure quality. 【Features】 ■ Easy construction management due to full-length straight drilling ■ No need for specialized under-pinning unique to high bearing capacity ■ A mid-bearing capacity method conceived by returning to the origins of precast concrete pile methods *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Basic Structure Construction and Civil Engineering Method "NS Eco Pile(R) Method"

Eco-friendly rotary piles that can be installed in small spaces.

The "NS Ecopile(R) Method" involves a technique where a steel pipe pile with spiral blades welded at the tip is rotated using a full-turn machine to excavate the ground and drive it in. The method confirms the reach to the bearing layer for all piles based on the construction torque, ensuring that the penetration into the bearing layer is secured to at least the pile diameter (1Dp) as a principle. Additionally, it does not use water or cement, and no excavation spoil is generated. 【Features】 ■ A soil-free method with high penetration capability using open-ended steel pipe piles with blades. ■ Can be constructed in narrow spaces with compact machinery, allowing for reliable stop management based on construction torque. *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration