Construction method Product List and Ranking from 1597 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 日本海洋サービス 大阪支店 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 Temporary bridge temporary pier cable-stayed construction method "LIBRA Method" 横山基礎工事

Construction method Product List

1951~1965 item / All 4237 items

Displayed results

Ground improvement work in Aichi Prefecture! Super Rappu Elneed method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality earthworks with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation, setting up, and removing formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling the creation of high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

  • 2-2.PNG
  • 2-3.PNG
  • 2-4.PNG
  • 2-5.PNG
  • 2-8.PNG
  • 2-6.PNG
  • 2-7.PNG
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super Rappuru Basic Construction Method (El Nido Method) Technical Documentation

[NETIS Registration] An explanation of design policies, the bearing capacity of the underlying ground, and load levels, extracted from design documents!

On this page, we have published excerpts of technical materials on the Super Rappuru Foundation Method (El Nido Method). We provide detailed explanations on topics such as "the bearing capacity and load degree of the underlying ground for embankment," "immediate settlement amount," and "the calculation formula for the design standard strength Fc of the embankment." For more details, please check the related links. We encourage you to take a look. [Contents] ■ Design Policy ■ Bearing Capacity and Load Degree of the Underlying Ground for Embankment ■ Confirm that the immediate settlement amount SE is less than the allowable total settlement amount Sa ■ Determine the design standard strength FC of the embankment *For more information, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super Rappuru El Nido Method <Over 3,000 construction achievements nationwide>

Shortening the time from excavation to completion of land development! It is easy to confirm the supporting layer through visual inspection and palpation.

The "Super Rappuru Elniido Method" utilizes on-site excavated soil during construction, allowing for a reduction in disposal costs for excess soil. It addresses challenges such as the complexity of processes like excavation and formwork placement in methods like the Rappuru Method (concrete pouring), seeking a more simplified approach. This method enables a reduction in processes through direct excavation, leading to shortened construction periods and lower costs. Additionally, we are expanding our partnerships with major companies such as Shimizu Corporation, Kajima Corporation, and Takenaka Corporation, boasting over 3,000 construction achievements nationwide. 【Three Strengths】 ■ Shortened construction period and reduced costs ■ Easy verification of support layers and high quality ■ Minimal excess soil after construction *For more details, please download the PDF or feel free to contact us.

  • スクリーンショット 2025-04-14 15.27.36.png
  • スクリーンショット 2025-04-14 15.34.39.png
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Yamaguchi Prefecture! Super Rappu El Nido method.

[NETIS Registration] Achieving shortened construction periods and low costs! Capable of handling groundwater and soft ground!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation, as well as the setting up and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix design, construction management, and the development of mixing buckets, enabling us to create high-quality site development with minimal variation in strength. 【Features】 ■ Easy confirmation of the supporting layer ■ Shortened construction period and high-quality site development ■ Minimal surplus soil (disposal leftover amount) on site ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 掘削完了.JPG
  • 20230417-102358-815_387d96ea2b3c442d5485953ce0c40957.jpg
  • 地盤改良工事.JPG
  • フロー値.JPG
  • 現場コア写真.JPG
  • 施工後残土量.jpg
  • 水中養生.jpg
  • 圧縮試験機.jpg
  • 試験練り.JPG
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Column] Comparison of Other Construction Methods and Processes / The Reason for the Significantly Faster Construction Time

Comparison of construction methods and processes / The reason why the construction time is overwhelmingly fast.

Can we achieve an overwhelming reduction in construction time? ⬛︎Explanation 1: No "slurry production" (compared to cement milk/pile improvement) In the cement milk method and pile improvement, the process begins with "slurry production," where cement and water are mixed at a batch plant. In fact, this preparation alone takes about 90 minutes for a site using 30 tons of cement. The Super Rappu Elneed method eliminates this entire preparation process. Since the solidifying agent is directly inserted in its package, there is no need for a plant or slurry production. The insertion work that took 90 minutes is completed in just 5 minutes. ⬛︎Explanation 2: No "formwork assembly and dismantling" (compared to the Rappu method) In the Rappu method, after "excavation," "formwork assembly" is performed, and after the concrete hardens, "formwork dismantling" occurs. These tasks require specialized craftsmen and are time-consuming processes. The Super Rappu Elneed method utilizes the sides of the excavation hole as a substitute for formwork (earthen formwork), eliminating the entire series of tasks related to "formwork." This allows for reductions in work time, labor costs, and material costs.

  • 67ea78497424eed9679815a182c5a3db-1024x768.jpg
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Roof renovation method "Unique Roof Fit" <Heat stroke measures in the workplace>

Extruded polystyrene foam insulation + spray polyurethane waterproofing!

"Unique Roof Fit" is a roofing renovation method suitable for heatstroke prevention in the workplace. It can be used for reducing indoor heat, preventing leaks, and protecting roofing materials. It adds insulation and waterproofing performance to the existing roof by attaching lightweight insulation materials and integrating them with a spray polyurethane waterproofing method. With the appropriate combination of materials, it is an innovative method that fits the roof. 【Features】 ■ Fits the shape of the roof ■ Fits heat prevention indoors ■ Fits leak prevention *For more details, please download the PDF or feel free to contact us.

  • Roof and gutter construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

屋根改修工法『ユニークルーフFit』

熱中症対策で関東圏でのカタログに載っている建材を使った施工をご紹介!

『ユニークルーフFit』は、屋根の形状に応じて断熱材を加工・納品する 屋根改修工法です。 屋内の厚さ軽減、雨漏り防止、屋根材の保護に好適。軽量な断熱材を屋根に 貼付け、スプレーウレタン防水の密着工法にて一体化。 また、断熱材の厚さ50・75・100mm、お客様の要求性能をふまえたご提案が 特長で、トップコートは標準色のほか、調色の対応も承っております。 【特長】 ■さまざまな屋根に適用できる改修工法 ■既設屋根の現状を元にオーダーメイド ■押出法ポリスチレンフォーム断熱材3種bA相当、熱伝導率0.028W/(m・K)以下 ■断熱材の厚さ50·75·100mm ■建築用塗膜防水材、高品質なスプレーウレタンを使用 ■屋根の全面をスプレーウレタンで覆う、安心の防水性能 ※詳しくはPDFをダウンロードしていただくか、お気軽にお問い合わせください。

  • Roof and gutter construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Work Schedule Creation AI System "Work Style Meister"

"Designing to work happily" - An AI system for creating work schedules born from a hospital.

The "Work Style Meister" is a tool designed to create a happier way of working. With AI automatically generating work schedules in a short time, it allows for the testing of various conditions to create the optimal schedule that balances work-life balance and service quality at a higher level. It also enables the management of daily task assignments, event participation, support, output of Form 9, and monitoring of nursing staffing standards. 【Features】 ■ Work preferences can be submitted from smartphones ■ AI automatically generates schedules in just a few minutes, considering work preferences and conditions ■ Management of daily tasks, event participation, support, etc. is possible ■ Creation of Form 9 and monitoring of staffing standards are possible ★ The "Nursing Staffing Meister" has been reborn as the "Work Style Meister" ★ While maintaining the screen layout and existing functions of the "Nursing Staffing Meister," performance has improved, and design and usability have been enhanced, allowing for use from a wider variety of devices. In addition to daily shift creation, time scheduling for tasks (scheduled for release in 2026) will be possible, and integration with other systems will be strengthened. *For more details, please download the PDF or feel free to contact us.

  • Shift Management System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Exterior construction work

For exterior structures such as garages, fences, and entrances, leave it to us!

Our company provides exterior construction services with the motto of being careful and beautiful, aiming to enhance the appearance of buildings and improve functionality. We carry out various projects such as lightweight and earthquake-resistant block walls, painting, parking lot paving, and the installation of fences made from various materials, including resin and wood grain. Additionally, we handle formwork construction for creating molds before pouring concrete, as well as the handling of various materials and tools used in civil engineering sites. 【Construction Services】 ■ Block Walls ■ Parking Lots ■ Approaches ■ Terraces ■ Fences ■ Gate Posts and Gates *For more details, please download the PDF or feel free to contact us.

  • Gates, walls and fences

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Inorganic mineral composite modifier "Hardlex"

Effective in small amounts! A remarkable product that hardens soft soil and transforms it into strong soil.

"Hardlex" is an inorganic mineral composite modifier that improves handling and compaction density immediately after mixing with the target soil due to its instant water absorption effect and the modification effects of hydration reactions and agglomeration granulation. Additionally, it begins to generate a large amount of ettringite within a few hours of mixing, ensuring trafficability and initial strength, such as for heavy machinery, through the effect of linking soil particles. Furthermore, it continuously transitions into ongoing chemical reactions such as pozzolanic reactions and carbonation reactions, increasing its binding strength over time, leading to long-term stability. 【Features】 ■ Immediate effect ■ Cost-effective and quick construction ■ Achieves strength even in difficult-to-stabilize soils ■ Low alkalinity, environmentally friendly ■ Resistant to disasters such as earthquakes and heavy rain *For more details, please download the PDF or feel free to contact us.

  • Soil improvement material
  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

ASE-HR method

It is possible to neutralize the soil after modification! The hexavalent chromium leaching test is not required.

The "ASE-HR method" allows for the management of appropriate additive amounts while adjusting water content and pH levels. It enables improvements in strength and handling, and there is no need for hexavalent chromium leaching tests. Additionally, handling of the soil is improved from the mixing stage to immediately after, allowing for heavy machinery work to commence right away. [Features] - Enables improvements in strength and handling - No need for hexavalent chromium leaching tests *For more details, please download the PDF or feel free to contact us.

  • Soil improvement material
  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement RCI method

No need for concrete replacement! Ground construction can be done without stopping operations.

We would like to introduce our "Ground Reinforcement RCI Method." Floor construction that would normally take one month if redoing the concrete can be completed in approximately 1 to 2 days. The construction period is shorter, reducing costs to about two-thirds, and the load-bearing capacity of the concrete increases by 1.5 times. Please feel free to contact us when you need our services. 【Features】 ■ Short construction period ■ Low cost ■ High quality *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Off-site construction method for air conditioning equipment "Vispaire Frame"

Since it can be delivered using a dedicated cart, the packaging material is limited to minimal protection, and individual material arrangements are not necessary!

The "Bispire Frame" is an off-site construction method for air conditioning equipment that significantly reduces on-site work time, contributing to shorter construction periods. By streamlining the workforce on-site and shortening the construction period, costs are reduced. Multiple contractors (for equipment installation, ductwork, and insulation) can be handled by a single contractor. Additionally, since it can be transported in unit form, the hassle of gathering related materials at a cluttered storage area is eliminated. **Benefits of Off-Site Production of Air Conditioning Equipment** - Shortened construction period - Standardization of quality - Space-saving on-site - Cost reduction - Safety for workers - Environmentally friendly construction site *For more details, please download the PDF or feel free to contact us.*

  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Off-site construction method for air conditioning equipment "A Frame"

The adoption of the slab attachment enables the offset of the insert and the hanging bolt!

The "A Frame" is an off-site construction method for air conditioning equipment aimed at concealed PAC (package air conditioning) and FCU (fan coil units). Even if insert differences occur, the slide function of the main beam and sub-beam allows for the adjustment of the position of vibration-proof fittings (suspension bolts). Since the position of the suspension bolts can be aligned, the installation of post-construction anchors can be omitted. Additionally, by pre-packaging related materials such as bracing fittings and suspension bolts, the time spent searching for parts can be eliminated, significantly reducing on-site work time. 【Points】 ■ Improved seismic resistance ■ Cost reduction + shortened construction period ■ Cost reduction + increased productivity ■ Quality improvement ■ Enhanced safety + shortened construction period *For more details, please download the PDF or feel free to contact us.

  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SCFR method

For preventing root rot of steel pipe columns such as lighting poles, sign poles, utility poles, pedestrian bridges, park playground equipment, and buildings!

The "SCFR method" is a repair and reinforcement technique that enables long lifespan through stable "prevention of external corrosion and increase in plate thickness" using SCFR sheets made of carbon fiber. By using a lattice-like carbon fiber reinforced plastic sheet, grease-like epoxy resin, and epoxy resin that can bond firmly with steel plates, it exhibits strong adhesion and bonding strength. It theoretically demonstrates an "increase in plate thickness effect of (0.4mm × number of sheets)" and ensures the necessary load-bearing capacity. 【Features】 ■ Corrosion prevention effect ■ Load-bearing capacity increase effect (plate thickness can be increased) ■ Performance stability effect (high-quality construction is possible) *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration