Construction method Product List and Ranking from 1586 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:May 13, 2026~Jun 09, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:May 13, 2026~Jun 09, 2026
This ranking is based on the number of page views on our site.

  1. AP工法協会 Tokyo//Interior construction business
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. アーキヤマデ Osaka//Building materials, supplies and fixtures manufacturers
  4. 4 アウロステクノロジーズ Ishikawa//others
  5. 5 徳和工業 Miyagi//Other construction industries

Construction method Product ranking

Last Updated: Aggregation Period:May 13, 2026~Jun 09, 2026
This ranking is based on the number of page views on our site.

  1. Wet-type spray seismic reinforcement method "AP Method" AP工法協会
  2. Vacuum concrete construction method 徳和工業
  3. APLAS Sheet Method for Shortening Construction Periods of Aging Infrastructure Reinforcement アウロステクノロジーズ
  4. 4 Soil Coating Method "PoliSoil Greening" <NETIS Registered> 丸八土建
  5. 5 Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研

Construction method Product List

3871~3900 item / All 4314 items

Displayed results

Structural Repair Method "MOG Rope Net Method"

Inspection and repair using a rope net basket with a patented construction method!

Our company offers a structural repair method using a patented rope net basket, called the "MOG Rope Net Method." Compared to conventional methods, it provides higher safety, allows for accurate inspections, and enables the identification of causes for repairs. Based on our track record with government agencies, licensed architects and builders deliver peace of mind at a more affordable cost. 【Features】 ■ Utilizes a fall prevention rope net, focusing on safety ■ An efficient proprietary method that does not require scaffolding *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Catalog] Roofing Materials and Exterior Wall Materials

A wide variety of metal roofing and exterior wall materials are available from our company!

This catalog features roofing and exterior wall materials from Itaya Metal Co., Ltd., which engages in the processing and sales of secondary steel products, large roofing materials, and wall materials. We introduce a variety of products, including roofing materials such as "Round Haze Folded Material 166" and "Round Haze Folded Plate 90," which excel in workability, as well as exterior wall materials suitable for medium to large structures, such as "Square Wave Siding 750" and "Square Wave Siding 800." [Contents] ■ Roofing Materials ■ Exterior Wall Materials *For more details, please download the PDF or feel free to contact us.

  • Others/Roofing materials (shingles, cement, steel sheets, aluminum)
  • Other wall materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-altitude double-R construction method LH-RR method

By using a low-head type pile driver and a low-head type special auger in this construction method, it is possible to perform construction with a low head!

The "Low Headroom Double R Method LH-RR Method" enables construction in high N-value layers such as soft rock and gravel with low vibration and low noise using small foundation machinery. Traditionally, ground that required large foundation machinery can now be constructed using a leaderless pile driving machine weighing between 20t and 40t, equipped with a high torque auger ranging from 70.7 to 98kNm, utilizing main body pressure input and a special auger head for hard ground. Additionally, the removal of obstacles and crushing methods underground can also be performed by changing attachments. 【Low Headroom Special Auger Performance (Partial)】 ■ Auger Type: AGD7000 ■ Weight (kg): 1,720 ■ Operating Pressure/Flow Rate: 27.4Mpa・220l/min ■ Base Machine Used: Hitachi Construction Machinery RX2300・SRX2700・RX3300 Low Headroom Dedicated Machines *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-altitude head-down-the-hole hammer method LH-DH method

Down-the-hole hammer method under low ceilings, under bridges for railways and roads, and under power lines!

We would like to introduce our "Low-Headroom Down-the-Hole Hammer Method LH-DH Method." Using a driving device to rotate the down-the-hole hammer and bit, the piston inside the hammer cylinder is moved back and forth by air supplied from a high-pressure compressor. This movement causes the bit tip to strike and break stones and rock formations, while the excavated soil is removed using a screw and air lift method. To prevent wear and seizure inside the cylinder due to piston movement, it is necessary to spray oil into the air using a line oiler. 【Construction Examples (Partial)】 ■ LH-DH Method ・Height restriction: 4.55m (under special high-voltage lines) ・Steel material: H250 L=7.5 to 9.5m joint pile construction ・Construction machinery: RX2300 low-headroom construction machine, special auger for low headroom AGD7000 *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-profile casing conveyance down-the-hole hammer method LH-CDH

Low-altitude, under-bridge, under-railroad, under-road bridge, and under-power-line casing conveyance type down-the-hole hammer method!

We would like to introduce our "Low-Headroom Casing Continuous Down-the-Hole Hammer Method LH-CDH Method." By using a special bit and continuously installing protective steel pipes for the borehole walls, we can reliably excavate to the designed height even in collapsed layers with high groundwater levels. After excavation, the steel pipes are left in place, allowing for the extraction of the hammer bit, which ensures that core material installation and solidification with mortar can be carried out effectively. Please feel free to consult us when you need our services. 【Construction Examples (Partial)】 ■ LH-CDH Method - Height restriction: 4.55m (under highway bridge) - Steel material: H300 L=11.5m continuous pile construction - Construction machinery: RX2300 low-headroom construction machine HGS60 *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Gas appliances

We propose a comfortable gas supply system.

We provide a comfortable gas supply system, including LP gas piping materials. Our specialized sales representatives, who are well-versed in our products, will propose suitable items for your needs. Please feel free to contact us with any inquiries. 【Main Products】 ■ Various low-pressure valves (gas faucets) ■ Various high-pressure valves ■ LP gas supply equipment ■ Gas meters ■ Water supply and heating equipment ■ Bulk supply equipment ■ Piping materials, etc. *For more details, please download the PDF or contact us.

  • Gas equipment
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Nice! Takasho

We have started an EC site!

Gas, water, electricity, work supplies, etc. Membership-based professional specialty shop "Iine!" We offer a wide range of materials necessary for everyone supporting lifelines, focusing on gas, as well as water, electricity, and work supplies.

  • Gas equipment
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Safety device "Mamoriti" to prevent pinching.

For preventing entrapment by aerial work platforms and handrails.

"Mamoritii" is a rubber anti-pinch device. Most cases of pinching on site involve hands rather than heads, with 70% of cases involving hands gripping handrails. This is why it was developed. By installing it on handrails and aerial work platforms, it serves as a safety measure to prevent hand pinching accidents. It is compatible with three sizes of standard aerial work platform handrails: 30mm square, 27mm round, and 34mm round. Please feel free to contact us if you have any requests. [Features] - Made of rubber - Improved durability - Does not break when crushed - Inexpensive *For more details, please download the PDF or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Bark blower method

We will effectively utilize the logging waste, which is industrial waste, on-site.

Our company employs a zero-emission construction method that effectively utilizes tree waste, implementing a bark blower technique to achieve slope protection and greening at a low cost. Since the fibrous chips intertwine, there is no scattering due to wind and rain, and the chip layer has excellent drainage and air permeability, preventing slope erosion caused by rainwater. 【Features】 ■ Recycling of felled timber ■ Slope protection ■ The chip layer prevents seed runoff and soil drying, enabling good greening ■ Cost reduction for greening compared to soil spraying and vegetation substrate spraying methods ■ Reduction of disposal costs for felled timber ■ Efficient construction is possible by utilizing a dedicated spraying machine (bark blower), among other benefits. *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Drone shooting and sales service

You can take aerial photos using the trending drone.

We sell a variety of drones, including the popular "DJI Phantom 4," higher-end models like the "Inspire," and personal shooting drones such as the "Spark." We also offer drone photography services, capable of capturing videos (4K/HD) and photos. The shooting data will be provided on a USB flash drive. Please feel free to contact us if you have any requests. 【Aviation Law Shooting Permission Obtained】 ■ Nighttime/Visual-Line-of-Sight Flights ■ Flights During Events ■ Flights in Residential Areas *For more details, please download the PDF or feel free to contact us.

  • Video Production
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

RPR coating removal

We will safely remove the coating with consideration for the environment.

"RPR Coating Removal" is a new method that significantly improves the working environment, safety, and efficiency compared to conventional methods in the process of coating peeling and removal. In this method, heat generated on the surface of the steel plate is utilized through electromagnetic induction heating (IH) to peel off the coating on the steel plate surface. Additionally, it is effective for the removal of hot coating films over 500μm thick, thickly applied paint films, rubber linings, and FRP linings, which are difficult to remove with other methods. [Advantages] ■ Designed with consideration for the health and safety of workers ■ Generates almost no dust and does not scatter paint films ■ Particularly low waste compared to existing methods *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Quick Cutter Method

Minimize the construction area and shorten the construction time! Introducing the construction methods we use.

The "Quick Cutter Method" is a technique for replacing manhole covers, where a circular cutter equipped with a wireless camera is mounted on an excavator to cut through asphalt and concrete pavement. It uses ultra-rapid hardening, high fluidity, non-shrink grout (AQC grout) as the restoration material. It can be attached to excavators in the 0.1 to 0.2m (3t to 4t) class using a coupler. (Breaker placement required) It can cut to a maximum depth of 500mm, making it suitable even for thick pavements. 【Features】 ■ Equipped with cutter lift speed and lowering pressure adjustment functions ■ Circular cutting minimizes the construction area and shortens construction time ■ Can be operated while the excavator is loaded on a 4t flatbed vehicle ■ A wireless camera is installed inside the cutter, allowing for quick and safe alignment as it can be monitored from the driver's seat of the excavator ■ Can cut near curbs due to its hanging design *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Inspection hatches, manhole covers, and ditch covers
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Instant curing coating method "Swael® Water Supply System"

No foaming occurs due to humidity, and it hardens completely even at sub-zero temperatures (below -15°C).

The "Swael® Potable Water [Corrosion and Waterproofing] System" is a revolutionary instant curing coating system developed for corrosion and waterproofing of concrete structures for potable water, based on a two-component polyurea resin (product name: Swael) consisting of isocyanate and a special curing agent, and a spray technology that mixes and ejects these two components. The gel time after spraying is extremely short, just a few seconds, allowing for walking on horizontal surfaces after 30 seconds. Therefore, the curing time after construction can also be shortened. Additionally, due to the short gel time, it is easy to apply thick coatings continuously on ceiling and wall surfaces without sagging, allowing for quick and efficient construction. [Features] ■ Instant curing ■ Cures regardless of humidity and temperature ■ Improved efficiency with a mechanical construction system ■ Excellent workability on ceiling and wall surfaces *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The NS Super Frame method is "energy-saving."

In winter, reduce heating energy consumption! In summer, reduce cooling energy consumption with heat insulation.

The "NS Super Frame Method" is a construction technique that optimizes performance in fire resistance, sound insulation, thermal properties, and durability through a hybrid wall and floor structure. In addition to exterior insulation, the steel on the interior side conducts heat, significantly achieving energy savings. During winter, it reduces heating energy consumption. Moreover, one of the features of this method, the "heat shielding technology," enables substantial energy savings even during summer. **Features of the NS Super Frame Method** - Reduces heating and cooling energy consumption (almost halved compared to typical buildings) - In addition to exterior insulation, the steel on the interior side conducts heat - By completely covering the steel and living space with insulation material, insulation efficiency is improved - Achieves comfortable living conditions that are warm in winter and cool in summer *For more details, please refer to the PDF document or feel free to contact us.*

  • Housing structure technology/long-term superior housing technology
  • Heat insulation and heat shielding methods
  • Other construction services
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The NS Super Frame Method is "comfortable and healthy."

By completely covering the living space with insulation material, we prevent condensation within the walls! This protects the interior from mold and dust mites.

The "NS Super Frame Method" is a construction technique that optimizes performance in fire resistance, sound insulation, thermal properties, and durability through a hybrid wall and floor structure. It excels in insulation and airtightness, preventing heating and cooling from escaping, thus creating a comfortable environment in winter and summer. Additionally, by completely covering the living space with insulation material, it prevents condensation within the walls and protects the interior from mold and dust mites. **Features of the NS Super Frame Method** - Warm in winter and cool in summer - Excellent insulation and airtightness - Healthy living environment due to anti-condensation effects - Superior sound insulation from external sources and neighboring rooms - Protects the interior from mold and dust mites *For more details, please refer to the PDF materials or feel free to contact us.*

  • Housing structure technology/long-term superior housing technology
  • Heat insulation and heat shielding methods
  • Other construction services
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

EPS construction method "TF WALL"

A safe new alternative to block walls! Achieving lightweight and durable new material fences at a low price.

The collapse of block walls due to disasters such as earthquakes is a significant issue in Japan, and many construction contractors are now seeking alternative materials to replace block walls nationwide. "TF WALL" is an EPS construction method that solves this problem. It not only offers durability but also accommodates a wide range of design finishes, allowing for the creation of more stylish walls through mortar sculpting and decorative painting. With our product, you can achieve a new type of wall made from materials with various advantages at a low cost. 【Features】 ■ A safe new option to replace block walls ■ Lightweight material that remains safe even if it collapses during an earthquake ■ High strength that withstands kicks from adults without breaking ■ Walls up to 180 cm in height can be constructed ■ Various designs are possible due to the EPS base material *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Gates, walls and fences
  • Fences and gateposts
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

NKE Mist Jet Method

A new method for exterior wall peeling! Since it uses high-pressure mist for peeling, the amount of water used is minimal!

The "NKE Mist Jet Method" ensures the safety of workers and environmental protection as it generates no dust and prevents the scattering of wastewater. By using this method for asbestos removal, the damage caused by asbestos is significantly reduced, water usage is drastically decreased, and less wastewater treatment is required, making it economical. The daily progress rate is greatly improved, leading to a shortened construction period. 【Features】 - Capable of over 50m² of construction per day with just one unit, allowing a small team to achieve high daily progress. - The NKE high-pressure compact pump is used by a team of three (nozzle operator, supervisor, and operator). - Water is sprayed in a mist form, reducing usage to less than a quarter. - Quickly and cleanly removes base adjustment agents. - Requires less wastewater treatment, saving space. *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Wire Sawing Construction Services

Vibration-free, low-noise, dust-free methods for cutting and removing reinforced concrete and large structures.

Our company conducts wire sawing work that involves wrapping a diamond wire around the object to be cut in a circular manner and cutting it at high speed. This method is particularly effective for the cutting and removal of large reinforced concrete structures. Additionally, it operates with low noise and no vibration, and uses cutting water during the process, eliminating concerns about dust pollution. Please feel free to contact us if you have any requests. 【Features】 ■ Capable of cutting and removing reinforced concrete and large structures ■ No vibration, low noise, and dust-free method ■ Fast cutting speed reduces construction time ■ Remote operation capability allows for underwater cutting and cutting in narrow spaces ■ Can cut freely in vertical, horizontal, and diagonal directions *For more details, please contact us.

  • Dismantling and moving
  • Reinforced concrete construction
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Next-generation seismic reinforcement method "JSPAC Method"

With a new philosophy aimed at the next generation, seismic construction methods are entering a new realm.

The "JSPAC method" is a next-generation seismic reinforcement technique that allows construction to be carried out while occupants remain in the building, without compromising its appearance, and enhances the building's strength and resilience. It enables seismic construction while continuing business operations and offers seismic reinforcement without changing usability, making it adaptable to a wide range of industries and various conditions and situations. By allowing construction to take place while occupants remain, it eliminates the need for relocation or alternative facilities, shortens construction periods, and significantly reduces CO2 emissions compared to demolishing and rebuilding existing structures. Please feel free to contact us if you have any inquiries. 【Benefits】 ■ Construction while occupied ■ High versatility ■ Minimal impact on building design ■ Maximum seismic resistance with minimal construction ■ Low cost & CO2 reduction *For more details, please download the PDF or feel free to contact us.

  • Earthquake-resistant construction method
  • Renovation and repair methods
  • Vibration isolation, vibration control, and earthquake resistance construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Measures for preventing snow accumulation accidents from road signs.

Lightweight yet extremely durable. A snow shedding prevention method that is easy to process and can be installed in any shape.

Our company provides methods for preventing snow accumulation accidents from road signs. Using a delta-shaped inclined plate, snow that adheres is allowed to fall naturally, and the use of highly insulating expanded polystyrene as the main body prevents freezing due to low temperatures. Additionally, it is easy to process, can accommodate any shape, and is lightweight, which reduces installation work. 【Features】 ■ Sprayed with Mizelon paint for improved durability, water repellency, and reduced snow accumulation due to its slippery surface. ■ Evolved into a detachable method to streamline regular maintenance and other tasks. *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Spring Bit Method

Anchor installation that provides three times the strength even at shallow depths.

The "Spring Bit Method" is a technique that allows for high adhesion by creating uneven surfaces on the inner walls of a core hole when the core drilling for post-installed anchors interferes with existing rebar. This method ensures pull-out strength even with a short embedment length (for example, reducing from 15D to about 8D). It is applicable to all types of construction that involve core drilling using core boring equipment for post-installed anchor work. Please feel free to contact us if you have any inquiries. 【Features of Spring Bit Products】 ■ Special blades using diamond chips for core boring and similar applications ■ Utilizes spring stress to create a ring-shaped groove inside existing holes ■ If existing rebar is encountered at depths where rebar detection does not reach during anchor drilling, this blade can be used to create grooves inside the hole to enhance pull-out strength, achieving equivalent anchoring power even if the required embedment length is not reached. *For more details, please download the PDF or feel free to contact us.

  • Earthquake-resistant construction method
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Crack repair injection gun "Hand Smoother"

No UV cut. Repair with injection for cracks without cutting.

The "Hand Smoother" is a crack repair injection gun that requires no maintenance and can be easily operated by anyone. Preparation is a one-touch attachment, and finishing requires no maintenance, making it hassle-free. It is an eco-friendly type that does not use air, electricity, or gas, as it is a hand-held extrusion type. Additionally, unlike rigid materials, its elastic nature prevents secondary deterioration even in structurally challenging areas. 【Features】 ■ No hassle for preparation, finishing, and maintenance ■ No air, electricity, or gas required ■ Prevents secondary deterioration ■ No U-cut or V-cut needed ■ Excellent injectability *For more details, please download the PDF or feel free to contact us.

  • Reinforcement and repair materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Environmentally Friendly Low-Impact Weeding Method "HOT Pressure"

Safe for weeding in places where children and animals are present, as no chemicals are used.

"HOT Pressure" is an environmentally friendly weeding method that uses only high-temperature hot water without any chemicals. By spraying high-temperature water between 60°C and 90°C on the underground roots of weeds, it is possible to denature (destroy) the regular structure of proteins, effectively killing the weeds. Additionally, the working time can be reduced with each successive application. 【Benefits】 - Since the roots are killed, no grass will grow for at least a month (except for airborne species). - There is a low probability of harm or damage to workers and third parties. - It does not require heavy labor or special skills, making it possible for ordinary workers to perform the tasks. - There is no need for collection, transportation, or disposal, contributing to CO2 reduction. *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Natural Crushed Stone Pile Method "HySpeed Method"

Weak ground can be improved more reliably, more quickly, and at a lower cost.

The "HySpeed Method" is a natural crushed stone pile method that involves digging holes in the ground and filling those holes with crushed stone to form stone columns. By creating crushed stone piles with natural crushed stone, it transforms weak ground into strong ground, firmly supporting buildings and protecting the ground from liquefaction during earthquakes. Please feel free to contact us if you have any inquiries. 【Advantages】 ■ A groundbreaking method that forms its own support layer, unaffected by the geological structure ■ The speedy and precise construction with a piston valve solves both the need for a solid ground and reduces construction time at once ■ Resolves various issues related to ground improvement, providing perfect added value *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Civil Engineering Method
  • Earthquake-resistant construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Earthquake preparedness service

We will take on the entire business and propose better methods tailored to your specific characteristics.

Our company undertakes a comprehensive range of services from seismic diagnosis of buildings to selecting appropriate construction methods, planning, and completing the construction. Additionally, to address concerns from customers who worry that seismic retrofitting may compromise aesthetics, we also propose designs that are aesthetically pleasing. Please feel free to consult us when you need our services. 【Features】 ■ For reinforced concrete and steel structures: - Improve wall strength (steel brace reinforcement method) - Flexibly absorb the overall building sway (toggle seismic isolation method), among others. ■ For wooden structures: - Strengthen joints with sheets (carbon fiber and aramid fiber reinforcement method) - Mitigate vibrations with hydraulic devices (GH hybrid seismic isolation method), among others. *For more details, please download the PDF or feel free to contact us.

  • Vibration isolation, vibration control, and earthquake resistance construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

High-Pressure Insertion Caisson Method [for Bridge and Railway Foundations, Shield Shafts]

It is a technology that is expected to be applied to various uses with construction methods that consider the environment.

The "Hayak Pressure-In Caisson Method" is a construction method that meets the demands of the times. The total load capacity of multiple hydraulic jacks installed on the top surface of the caisson ranges from several hundred tons to several thousand tons. By operating these jacks alternately or simultaneously, posture control is achieved, allowing for highly accurate sinking. In recent years, advancements in drilling patterns and jack control technology have enabled us to meet a wide range of demands as a method that aligns with the needs of the times. 【Features】 ■ Enables highly accurate sinking ■ Improved control technology ■ Constructed with relatively simple equipment and has a long history *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Underground Pump Room and Underground Storage Pond Construction <Hayak Pressure Insertion Caisson Method>

There are many achievements in underground pump rooms and underground storage tanks.

We would like to introduce our "Underground Pump Room and Underground Storage Pond Construction" utilizing the "Hayak Pressure Insertion Caisson Method." In conventional methods, issues with water leakage in structures arise due to depth and soil conditions. Given the high reliability of the caisson method for constructing permanent structures above ground, the adoption of the pressure insertion caisson method is increasing. 【Features】 <Underground Pump Room and Underground Storage Pond Construction> ■ Capable of constructing deep and large-diameter shafts ■ Most of the work can be done from above ground, which is advantageous in terms of safety and cost *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shield and propulsion shaft construction <Hayak pressure-in caisson method>

There are many achievements in shield and propulsion shaft construction.

We would like to introduce the "shaft construction for shield and thrust" utilizing our "Hayak Pressure-in Caisson Method." Shield construction planned in urban civil engineering often requires deep excavation to avoid existing underground structures such as subways and water pipelines. As a result, the adoption of the pressure-in caisson method is increasing, considering the impact on the surrounding area and safety. [Features] <Shaft Construction> ■ Capable of constructing deep and large-diameter shafts ■ Most of the work can be done from the ground, which is advantageous in terms of safety and cost *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Lift-up horizontal rotation construction method

It is possible to install bridge piers under strict construction restrictions such as upper limits, lateral limits, and front limits.

The "Lift-Up Horizontal Rotation Construction Method" involves lifting up the pier and beam section, and then rotating it horizontally after connecting it to the columns. This method allows for the installation of piers under elevated bridges in construction conditions where there are strict limitations above, to the sides, and in front, such as those found in areas squeezed between roads. Please feel free to contact us if you have any inquiries. 【Features】 ■ Construction can be done with low noise ■ Significant reduction in traffic restrictions ■ Reduction of high-altitude work is possible ■ Shortening of construction period is possible *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Civil engineering services

Civil engineering, architecture, marine, landscaping. There are veteran craftsmen.

Our company undertakes various civil engineering works, including exterior construction, retaining wall construction, land leveling, and ground improvement works. In addition to civil engineering, we also handle structural works, construction works, repair works, and projects for individuals. Our main construction sites are primarily in the southern Kanto region, including Tokyo, where we work with teams of 1 to 10 craftsmen depending on the site. Please feel free to contact us if you have any requests. 【Examples of Work】 ■ Bridge girder slab replacement work ■ Fender installation work ■ Expansion joint replacement work ■ Renovation work for permanent fences ■ Renovation work for concrete floors, etc. *For more details, please download the PDF or feel free to contact us.

  • Other civil engineering works
  • Concrete construction
  • Other earthworks, foundation works, and exterior floors
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration