iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      36677items
    • Facilities
      Facilities
      57728items
    • Lighting and Interior
      Lighting and Interior
      17586items
    • Common materials
      Common materials
      37231items
    • Civil Engineering Materials
      Civil Engineering Materials
      10203items
    • Construction, work and methods
      Construction, work and methods
      29183items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29725items
    • IT/Software
      IT/Software
      33554items
    • others
      others
      89299items
    • Store and facility supplies
      Store and facility supplies
      4600items
    • Office and commercial supplies
      Office and commercial supplies
      11728items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      1057items
    • Logistics Equipment
      Logistics Equipment
      7333items
    • Energy and Resources
      Energy and Resources
      11968items
  • Search for companies by industry

    • Information and Communications
      7295
    • others
      7210
    • Building materials, supplies and fixtures manufacturers
      6631
    • Service Industry
      4754
    • Trading company/Wholesale
      3072
    • Other construction industries
      2445
    • Electrical equipment construction business
      719
    • Construction Consultant
      607
    • Interior Design
      519
    • General contractors and subcontractors
      490
    • Facility Design Office
      489
    • Architectural design office
      363
    • retail
      362
    • Housing manufacturers and construction companies
      349
    • Warehousing and transport related industries
      329
    • Building Management
      292
    • Electricity, Gas and Water Industry
      285
    • Interior construction business
      278
    • Medical and Welfare
      275
    • Educational and Research Institutions
      253
    • Renovation and home construction industry
      222
    • Water supply and drainage construction business
      205
    • Transportation
      174
    • Real Estate Developers
      165
    • Fisheries, Agriculture and Forestry
      132
    • Structural Design Office
      65
    • Finance, securities and insurance
      41
    • Restaurants and accommodations
      32
    • self-employed
      31
    • Mining
      26
    • Public interest/special/independent administrative agency
      20
    • Police, Fire Department, Self-Defense Forces
      17
    • Property Owner
      9
    • Store and building owners
      9
    • Government
      9
    • Individual
      9
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Construction Consultant
  • Interior Design
  • General contractors and subcontractors
  • Facility Design Office
  • Architectural design office
  • retail
  • Housing manufacturers and construction companies
  • Warehousing and transport related industries
  • Building Management
  • Electricity, Gas and Water Industry
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Property Owner
  • Store and building owners
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Other construction industries
  3. ジオテック
  4. Product/Service List
Other construction industries
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

ジオテック

capital5000Ten thousand
number of employees77
addressTokyo/Toshima-ku/3-20-21 Higashi-Ikebukuro, Kosen Building 3F
phone03-5985-8191
  • Special site
  • Official site
last updated:Jun 12, 2026
ジオテックlogo
  • Contact this company

    Contact Us Online
  • Company information
  • Products/Services(685)
  • catalog(378)
  • news(0)

ジオテック List of Products and Services

  • category

1~45 item / All 111 items

Displayed results

Filter by category

地盤調査 地盤調査
地盤補強(地盤改良)工事 地盤補強(地盤改良)工事
沈下修正工事・曳家工事 沈下修正工事・曳家工事
土壌汚染調査 土壌汚染調査
その他の住宅関連事業 その他の住宅関連事業
地歴調査 地歴調査
残土調査 残土調査
沈下修正工事・曳家工事

沈下修正工事・曳家工事

沈下修正工事は不幸にして傾いてしまった建物を治す工事です。 曳家工事は建物をそのまま別の場所に移動する工事です。

Method of repair work: "Settlement Repair Work"

A building that has tilted can be corrected with sinking repair work!

"Settlement correction work" introduces the flow from the occurrence of differential settlement to the correction work. A commonly used method is the steel pipe pile driving method, which supports the building's load by driving steel pipe piles into the foundation using jacks, thereby supporting and correcting the entire structure. [Contents] ■ Building level measurement (current status assessment) ■ Flow from the occurrence of differential settlement to correction work ■ Steel pipe pile driving method ■ Overview of each method *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Submerged correction work - pressure-resistant slab method *

Restoring a tilted house using a pressure-resistant slab method that addresses shallow soft layers and settlement cessation.

This is a subsidence correction work for buildings that have experienced differential settlement, aimed at restoring tilted houses. In the pressure plate method, a pressure plate (steel plate) is installed on stable ground, and the tilt of the building is precisely corrected using adjustment jacks and other tools. After the correction through jack-up, strong measures such as fixing with adjustment wheels, backfilling, and mortar filling are carried out to properly support the building's load and restore a safe living environment.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Submarine correction work *

We will restore the tilted house. Subsidence correction work to prevent further sinking.

We provide settlement correction work to restore tilted houses that have experienced differential settlement. In the most commonly used steel pipe pile driving method, the building's load is used as a reaction force to drive steel pipe piles into the supporting ground using jacks, thereby supporting and correcting the entire building. This method not only corrects the settlement of the building but also prevents further settlement. Additionally, we select and implement the most suitable method from options such as pressure slab method, building relocation and new pile construction, and cement milk injection method, according to the ground conditions and the state of settlement.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Proposal for Submergence Correction Work

If different subsidence occurs, leave it to us.

The decision on the method for settlement correction and its implementation will be made based on a site survey, taking into consideration the following points: - Site conditions (slope situation, condition of existing structures, foundation and exterior conditions, ground data, buried objects, etc.) - Whether the settlement is ongoing or has stabilized. - Whether to carry out a full correction under the foundation (for the purpose of preventing re-settlement) or a partial correction.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Submerged correction work i-LEFT method

Easily lift up tilted or sunken houses.

The tilting and sinking of buildings occur due to insufficient ground support caused by topographical and human factors, and there has been a tendency for this to increase in recent years. i-LIFT method (i-LIFT construction method) patent application: 2003-430063

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Submerged correction work using steel pipe pile driving method.

I will restore the tilted house.

The steel pipe pile driving method is a technique that uses jacks to press steel pipe piles into the supporting ground, allowing the building's load to be supported and adjusted.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Subsidence correction, different subsidence survey

To restore the tilted house, we will assess the current situation.

Survey Details Building Level Measurement (Perimeter) SWS Test (Screw Weight Penetration Test) (4-7 Points)

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Subsidance correction work

Buildings that have tilted can be corrected with sinking repair work!

"Settlement correction work" introduces the flow from the occurrence of differential settlement to the correction work. A commonly used method is the steel pipe pile driving method, which supports the building's load by driving steel pipe piles into the supporting ground using jacks, thereby supporting and correcting the entire structure. [Contents] ■ Building level measurement (current situation assessment) ■ Flow from the occurrence of differential settlement to correction work ■ Steel pipe pile driving method ■ Overview of each method *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Foundation Reinforcement Construction System "Ganko Oyaji"

A foundation reinforcement construction system with low cost, high safety, and short construction period!

"Ganko Oyaji" is a reinforcement system that improves the shear strength, ductility, and seismic resistance of concrete slab foundations by applying carbon fiber sheets with a matrix resin. Since it involves the application of high-strength carbon fiber, it results in a strong, cost-effective, and aesthetically pleasing finish, making it suitable for existing homes. Reinforcement is done by applying carbon fiber with matrix resin to unreinforced foundations. Additionally, for cracked foundations, epoxy resin is injected under low pressure before applying the carbon fiber. 【Features】 - High strength (the cracked unreinforced foundation becomes significantly stronger than when it was new) - High durability (particularly resistant to salt damage and corrosion) - Increased shear strength, ductility, and seismic resistance - Significantly reduced construction time, making it cost-effective (construction period of 3 to 5 days) - Minimal noise as heavy machinery is not used *For more details, please refer to the PDF materials or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

i-LIFT Method

Easily lift up tilted or sunken houses!

The "i-LIFT method" is a technique that injects grout into the ground to lift and restore tilted or sunken buildings while also enhancing the ground's bearing capacity. Since the injection is performed while continuously measuring with a high-precision leveling instrument, fine adjustments to the level are possible. Additionally, construction can be carried out with compact machinery, making it feasible even in areas with limited space between adjacent houses. This method allows for a reduction in construction time compared to conventional methods. 【Features】 ■ Fine adjustments to the level are possible ■ Construction is possible in areas with limited space between adjacent houses ■ Reduction in construction time ■ Can be implemented even if ground improvement has already been performed ■ Can be applied to measures against ground subsidence *For more details, please refer to the PDF materials or feel free to contact us.*

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work

Establishing a reliable support structure and preventing further settlement, specialized settlement correction methods.

We provide settlement correction work based on advanced engineering for buildings that have experienced differential settlement. Using the most proven method, the "steel pipe pile driving method," we reliably drive steel pipe piles to the supporting ground using hydraulic jacks, with the weight of the building serving as the reaction force, thereby supporting and correcting the entire structure. This method not only allows for precise horizontal correction of severe tilting but also possesses high durability to prevent future re-settlement. Additionally, based on the engineering analysis of the ground and settlement conditions, we select the optimal method from a variety of options such as "pressure slab method," "building relocation and new foundation pile construction," and "cement milk injection method," ensuring a reliable solution is implemented.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Subsidance Correction Work 【i-LIFT Method】

i-LIFT method that lifts buildings from the ground through grout injection.

This method involves injecting grout (injection material) into the ground to lift and restore tilted or sunken buildings while simultaneously enhancing the ground's bearing capacity. The method consists of three "i (injection)" processes. First, repeated injections are made to form a "support plate" on the supporting layer. Next, injections are made beneath the foundation to create a "lift plate." Finally, "lift-up injection" is performed between the support plate and the lift plate to precisely raise the entire building. Utilizing laser measurement devices and computer-controlled three-dimensional tilt measurement systems, the tilt is continuously measured in real-time, allowing for precise leveling adjustments, making this a highly accurate, reliable, and safe construction technique.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shallow Correction Work Foundation Reinforcement Work System 【Ganko Oyaji】

Carbon fiber reinforcement system that revives non-reinforced and cracked foundations beyond new construction.

This is a carbon fiber reinforcement system for existing concrete strip foundations that has obtained housing disaster prevention technology evaluation (evaluation number DPA-Housing Technology-23) from the Japan Architectural Disaster Prevention Association and has been registered as a utility model. By firmly adhering high-strength carbon fiber sheets to the foundation surface using matrix resin, it significantly improves shear strength, ductility, and seismic resistance. Unlike traditional underpinning methods that face many challenges in terms of weight, construction period, and cost, this system can reliably restore existing foundations with no reinforcement or deteriorated cracks to a robust supporting structure that far exceeds the original strength at the time of construction, without significantly changing the weight or cross-section of the structure.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Subsidance correction work | Construction plan for jack-up work on a detached house while living in it.

A plan for jack-up construction of single-family homes to maintain the residents' living conditions. The tilt of the building will be corrected to the millimeter without the need for temporary housing, while you continue to live in your home.

This is a specialized document that clearly summarizes the overall plan for the jack-up construction of single-family homes to maintain the residents' living conditions. It covers advanced methods for correcting uneven settlement in wooden houses without the need for moving to temporary housing or relocating belongings, allowing for precise correction of building tilt down to the millimeter while residents remain in their homes. Utilizing a computer-controlled hydraulic jack system linked to high-precision laser measuring devices, the building is safely lifted to a horizontal line without imposing undue deformation stress on the structure. The plan includes meticulous project management that considers limited construction hours, reliable dust protection, and attention to vibration and noise, enabling the completion of work without disrupting daily activities such as remote work, house chores, and childcare. It dramatically alleviates health issues caused by floor tilt, such as dizziness, headaches, and insomnia, while simultaneously repairing issues like malfunctioning doors and windows and wall cracks. This comprehensive construction plan also includes measures to prevent re-settlement through the insertion of steel pipe piles beneath the foundation, minimizing the psychological and economic stress for the client.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Partial correction of cracks in the base foundation and localized settlement using steel pipe pile driving!

Fundamental solution for local subsidence and cracks in the foundation! A partial repair technique that utilizes the building's own weight to drive steel pipe piles into deep support layers, preventing further subsidence.

Localized subsidence and cracking occurring in the fabric foundation of a residence are serious structural defects caused by localized weakening of the ground or uneven soil pressure due to neighboring embankments or excavations. If left unaddressed, the building's tilt will progress, leading to significant disruptions in daily life, such as wall cracks and malfunctioning window frames. In GeoTech's subsidence correction work, we employ a steel pipe pile driving method that uses hydraulic jacks to vertically press steel pipe piles into a hard support layer deep below the surface, utilizing the building's own weight as a reaction force. Piles are precisely placed at specific locations where localized subsidence has occurred, and the building is accurately jacked up to restore it to a level state. Additionally, cracks in the foundation are treated with epoxy resin injection or U-cut repairs, and ground fissures or voids beneath the floor are filled with high-density air milk, thoroughly reinforcing the overall stability of the structure and the strength of the foundation. The work can be carried out while residents remain in the building, with low vibration and low noise. This is the optimal method for resolving fabric foundation issues at low cost and in a short construction period, regardless of the building's age.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Fundamental repair of settlement at retaining walls and uneven ground with steel pipe piles!

Eliminate the settlement of strip foundations occurring at the backfill of retaining walls and the boundaries of cut and fill! A high-durability settlement correction technology that fixes to a hard support layer by driving steel pipe piles under the weight of the building.

In residential land development, there are many cases where uneven ground, such as backfilling behind retaining walls and the intersection of cut and fill, leads to ground consolidation settlement and differential settlement due to lateral flow. When differential settlement places excessive stress on the foundation, it can cause cracks in the foundation and ground fissures beneath the floor, increasing the risk to the building structure. The settlement correction work provided by Geotech resolves this issue by utilizing the weight of the building as jack reaction force and employing a steel pipe pile driving method that directly presses high-strength steel pipe piles into stable supporting ground. The foundation on the settlement side is carefully lifted with hydraulic jacks and accurately corrected to a horizontal state. Additionally, high-resin repair materials are injected into the cracks of the foundation, and lightweight, self-hardening air milk is filled without gaps into the voids created underground by the settlement. Construction can be carried out while residents are living in the home, eliminating the need for relocation, and foundation reinforcement is achieved in a safe and secure environment with significantly reduced noise and vibration. We provide optimal construction plans tailored to the customer's needs.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Partial repair of settlement and cracks in the cloth foundation with steel pipe piles while residing.

No need to move; construction can be done while living in the space! Smartly repair local subsidence and cracks in the fabric foundation using steel pipe pile driving methods, minimizing costs and construction time with partial reinforcement.

The sinking and cracking of strip foundations caused by the aging of residential buildings and localized ground softening lead to issues that result in stress in daily life and a decrease in the asset value of the property. Large-scale demolition and reconstruction or house-moving work require high costs and temporary housing, but with Geotech's steel pipe pile driving method, it can be safely and reasonably corrected while living in your familiar home. This method utilizes the building's own weight as a reaction force to steadily drive steel pipe piles down to a stable support layer using a small hydraulic jack, accurately jacking up and correcting the sinking areas. Since it can be constructed with partial excavation, the construction period can be minimized, optimizing construction costs. Additionally, high-viscosity resin injection is applied to the cracks in the damaged strip foundation, and lightweight, durable air milk is filled and injected into the voids created by sinking under the floor and underground to restore ground bearing capacity. It generates minimal vibration and noise for neighbors and is the definitive method for correcting residential sinking with excellent cost performance. We will continue to support your important home with a reliable construction system.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Underpinning Renovation Work | A Plan for Jacking Up Detached Houses to Restore Client Trust

A construction plan for jack-up work on single-family homes to maintain the residents' living conditions. This is a site management guideline for contractors to promptly respond to complaints and defects while the owner is still residing in the home.

This is a technical and management guide for house lifting construction plans specifically designed for construction companies and house manufacturers, aimed at maintaining the residents' quality of life. It comprehensively covers the process management guidelines for professionals to correct building tilt in the shortest time possible while residents continue to live in the property, without imposing the burden of moving or temporary housing on the owners when issues of differential settlement are discovered after handover. Based on ground investigation data, it accurately combines the use of existing columns, steel pipe jacking methods, and pressure slab methods to detail the process of returning the entire building to a level position without distortion. It includes a checklist of management considerations unique to occupied sites, such as attention to noise reduction, selection of low-noise and low-vibration equipment, and dust prevention measures. This practical document is essential for builders to restore trust and address warranty issues, covering everything from dialogue techniques to alleviate the psychological stress of owners, to various procedural steps for reattaching ground guarantees and insurance application processes.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Repairing cracks in the foundation and local settlement with steel pipe piles to restore value!

Fundamental solution for local subsidence and cracks in the foundation! A structural repair that utilizes the building's own weight to drive steel pipe piles into the supporting layer, protecting asset value.

Localized subsidence and cracking occurring in the foundation of residential buildings are significant structural issues caused by uneven ground subsidence and localized softening. If left unaddressed, the tilt of the building will further increase, leading to a substantial decrease in asset value and reduced seismic resistance. The subsidence correction work provided by Geotech utilizes the building's own weight as jack reaction force and employs a steel pipe pile pressing method, where high-strength steel pipe piles are driven deep into a hard support layer. Piles are precisely anchored at the locations of localized subsidence, and accurate leveling is restored through precise jacking. Additionally, epoxy resin injection is applied to the cracks in the foundation concrete to restore structural strength, and high-density filling of air bubble mortar is used to raise the ground bearing capacity in areas of subsidence and underground voids. Construction can be carried out while residents are living in the home, minimizing noise and vibration, and compressing the construction period and costs to a minimum. We will permanently protect the structural safety and asset value of your important home.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | High-precision horizontal repair of foundation settlement and cracks using steel pipe piles!

Thoroughly solving local subsidence and cracking of fabric foundations caused by earthquakes and ground movement! A technology that performs millimeter-level horizontal restoration and structural reinforcement using steel pipe pile driving and high-precision measurement.

Local subsidence and cracks in the foundation caused by seismic shaking and consolidation changes in weak ground lead to significant tilting and a dramatic decrease in the seismic resistance of homes. The subsidence correction work carried out by Geotech resolves these issues using a steel pipe pile driving method, where steel pipe piles are driven into a hard support layer under the weight of the building, monitored in real-time to the millimeter with the latest laser measurement systems. Hydraulic jacks are linked to precisely lift the building without adding stress, correcting it to its original level at the time of construction. At the same time, high-adhesion epoxy resin is injected into the cracks of the damaged foundation to fully restore structural strength and waterproofing performance, while high-strength bubble mortar (air milk) is densely injected to fill the cracks and voids that have formed in the subfloor due to subsidence. The work can be done while residents are living in the home, with no need to move to temporary housing, and is completed in a short period with minimal noise and vibration. This simultaneously improves the building's seismic performance and ensures lasting structural stability.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Subsidance Correction Work | House Jacking-Up Construction Plan Without Stopping Lifelines

A plan for jack-up construction of a single-family home to maintain the residents' living conditions. The building's tilt will be precisely corrected in three dimensions using lasers while the water and gas systems remain operational.

This is a cutting-edge engineering document that focuses particularly on technical management and safety within the house-jacking construction plan aimed at maintaining the residents' living conditions. It encompasses a special "pipe-following" construction process that safely corrects differential settlement while residents continue to live in the house, without ever interrupting essential lifelines such as city gas, water supply and drainage, electricity, and internet during the construction period. By controlling multiple hydraulic jacks with a computer and monitoring the building's behavior in real-time using a three-dimensional laser level measuring device, the lifting is performed with millimeter precision, preventing undue deformation stress on the structure. The on-site material storage area is optimized for space, and by adopting low-noise and low-vibration systems such as electric hydraulic pumps and soundproof generators, it perfectly prevents neighborhood troubles during construction in densely populated areas. This technical specification document promises the highest safety quality, explaining methods to reinforce foundation concrete cracks with carbon fiber sheets that possess ten times the strength of steel plates.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Restoring trust by fixing settlement and cracks in the base foundation with steel pipe piles!

Immediate repair of shallow residential foundation settlement and cracks! A technology that prevents re-settlement and restores corporate trust using a steel pipe pile driving method that utilizes the building's own weight.

Local subsidence and cracks in the foundation of detached houses that occur after handover are very serious issues for contractors and house manufacturers in terms of customer response and after-sales support. Delays in identifying the cause and inadequate construction responses can lead to secondary complaints and a loss of brand trust for the company. GeoTech's subsidence correction work involves a steel pipe pile pressing method, where small hydraulic jacks use the weight of the building as a reaction force to drive steel pipe piles into deep supporting layers, precisely lifting the problematic foundation and restoring it to a high level of accuracy. Epoxy resin injection is applied to damaged concrete cracks to fully restore structural strength, and lightweight bubble mortar (air milk) is filled into ground cracks and voids to enhance ground contact. The work can be carried out while the residents remain in the house, significantly reducing the burden on homeowners with a short construction period and low vibration. With a reliable construction plan linked to the re-issuance of after-sales guarantees, we quickly resolve issues with homeowners and provide a deep sense of security.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Fundamentally solve the settlement of buried waste materials and complex strata with steel pipe piles!

Eliminate foundation settlement caused by debris, buried waste, and uneven strata! A correction technique that prevents re-settlement by fixing to a hard support layer through the pressing of steel pipe piles due to the weight of the building.

The presence of buried waste and rubble, as well as irregular old embankment layers, which cannot be identified solely from the data of the ground survey conducted in advance, can be significant causes of localized settlement and diagonal cracks in the footing foundation. Such geological factors leading to uneven settlement cannot be prevented by simple surface ground improvement. Geotech's settlement correction work accurately identifies the causes based on excavation verification at the site and applies a steel pipe pile driving method that utilizes the building's own weight as a reaction force. Small-diameter steel pipes are pushed in with hydraulic jacks, penetrating the surface obstruction layers to firmly reach the hard supporting ground below. The irregularly settled footing foundation is safely jacked up and accurately returned to a level position, while cracked concrete foundations are repaired by injecting high-adhesion epoxy resin. Voids created by settlement under the floor and gaps around buried objects are filled with high-density air-entrained mortar to improve bearing capacity from the bottom up. The work can be completed in a short period while the residents remain in the building, fundamentally resolving the issues of irregular settlement.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Repairing settlement and cracks in the cloth foundation without stopping the utility lines!

Construction without stopping city gas or water supply! A technique for safely leveling the settlement and cracks of strip foundations using a steel pipe pile driving method that relies on the weight of the building.

Localized subsidence and cracking in residential shallow foundations can not only cause tilting of the building but also place excessive strain on the plumbing and equipment under the floor, potentially leading to damage incidents. Typical subsidence repairs often involve temporary suspension of utilities and moving to temporary housing, which can impose a significant burden on homeowners. GeoTech's subsidence repair work offers a groundbreaking jack-up plan that can be executed without interrupting essential services such as city gas, water supply, and electricity. While installing flexible joints to prevent pipe breakage and taking careful protective measures, we press and install steel pipe piles into deep hard layers using the weight of the building as a counterforce. We precisely lift the subsided shallow foundation to restore it to a level position within millimeters. At the same time, we inject epoxy resin into the cracks in the foundation concrete to restore strength and waterproofing, and we fill the voids in the subsided ground under the floor with high-density air-entrained mortar (air milk). This allows for construction while living normally, minimizing both the construction period and costs.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work|Clarifying foundation settlement cracks through SWS investigation and partial jack correction.

Scientifically clarify the partial subsidence and cracks in the foundation through SWS investigation! We will accurately correct and reinforce it while living in the space using partial jacking and steel pipe pile insertion.

This construction method is a groundbreaking settlement correction solution for single-family homes that have experienced partial sinking of the foundation or structural cracks. It scientifically identifies the causes based on SWS (Screw Weight Penetration) tests and precise building level measurements, followed by partial jacking and ground reinforcement. For localized tilting caused by weak ground or uneven consolidation of fill, we use small hydraulic jacks and high-precision laser measurement devices to safely and reliably restore the level to within millimeters. Cracked areas of the foundation are repaired with epoxy resin injection and U-cut seals, and, if necessary, we optimally combine steel pipe pile driving methods and pressure slab methods to fundamentally eliminate the risk of future settlement. Our method fully accommodates construction while residents are living in the home, without the need for moving or temporary housing, allowing work to proceed while maintaining the residents' daily routines. We significantly reduce the financial and mental burden on homeowners, ensuring structural integrity and enhancing long-term asset value, so you can rest assured.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Partial correction of settlement and cracks in the fabric foundation during occupancy completed with SWS investigation.

During residence, we will clarify the sinking and cracks of the slab foundation through SWS investigation! We will ensure safe construction while protecting your life with partial jack adjustments, eliminating the need for temporary housing.

This plan is a resident-friendly subsidence correction solution that precisely and safely repairs partial subsidence of the foundation and structural cracks while protecting the daily lives of residents. By conducting a pre-implementation SWS (Screw Weight Insertion) test and high-precision measurements of the floor levels inside and outside, we visualize the localized causes of subsidence and the unevenness of the ground. Based on the diagnostic results, we ensure dust prevention measures and safe pathways to prevent dust from entering the living space, and we carry out partial jacking using small hydraulic jacks. By lifting and correcting in millimeter increments while monitoring the building's minute movements in real-time with a 3D laser level measuring device, we can restore it to a level position without placing undue stress on walls or columns. For foundation cracks, we apply epoxy resin injection and, if necessary, use steel pipe pile driving and pressure plate reinforcement to prevent re-subsidence. We promise to achieve a worry-free construction process that incurs no temporary housing costs or moving expenses, minimizing the mental and financial stress for the client.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work|Partial jack correction of settlement cracks in the fabric foundation through SWS investigation.

Accurate clarification of partial subsidence and cracks in the foundation through SWS investigation! We will safely restore it by reducing costs with efficient jack adjustments.

This proposal is a settlement correction method that effectively repairs partial subsidence and cracking issues in strip foundations without incurring excessive construction costs. By conducting a preliminary SWS (Screw Weight Insertion) test, we can pinpoint the specific soft layers or subsidence areas causing the settlement. By applying a "partial jack-up method" that selectively lifts and corrects only the necessary areas without jacking up the entire building, we minimize construction equipment and personnel, achieving significant cost reductions. Furthermore, for structural cracks in the foundation, we combine high-viscosity epoxy resin injection and carbon fiber sheet reinforcement to significantly enhance the durability and toughness of the foundation structure beyond the level of new construction. If necessary, we will implement deep pile driving or pressure slab methods to completely contain the risk of future settlement recurrence. This method is chosen by many contractors and clients as a rational option that balances smart cost management with reliable safety structures and the preservation of the building's asset value.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Correction of settlement cracks in the mat foundation using SWS survey and partial jacking.

The SWS survey scientifically clarifies partial settlement and cracks in the fabric foundation! We will safely restore it with partial jack adjustments that do not stop the lifelines and steel pipe pile driving.

This construction method is a subsidence correction solution for single-family homes that have experienced partial sinking of the foundation or structural cracks. It scientifically investigates the causes based on SWS (Screw Weight Penetration) tests and high-precision level measurements, allowing for partial jacking up while maintaining the living infrastructure. By implementing flexible piping measures that do not disrupt lifelines such as city gas and water supply and drainage, we achieve complete construction while residents remain in their homes, without the need for temporary housing or relocation. For cracks in the foundation caused by uneven subsidence, we apply structural repairs such as epoxy resin injection, and during lifting, we use small hydraulic jacks and laser measuring devices to safely and precisely restore levelness to the millimeter. Furthermore, by combining the driving of steel pipe piles into the supporting ground and the installation of pressure-resistant slabs, we fundamentally eliminate the risk of future re-subsidence. We dramatically reduce the financial and mental burden on homeowners while ensuring the safety of their homes and enhancing property value, so you can trust us to handle it with confidence.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Repairing settlement cracks in the fabric foundation using SWS investigation and partial jacking.

Investigating the causes of partial subsidence of the foundation and structural cracks through SWS surveys! We will reliably restore the client's trust with partial jacking up and re-attaching ground guarantees.

This plan is a solution for contractors and house manufacturers that covers everything from the scientific clarification of the causes of partial subsidence of the foundation and structural cracks that occur in homes after delivery, to precise corrections and warranty provisions. By conducting SWS (Screw Weight Insertion) tests and high-precision measurements of the building in advance, we visualize the factors of uneven subsidence in the ground and present a correction plan based on clear evidence. We adopt an approach of "repairing while living" that does not require temporary housing or moving, and we prevent secondary complaints through thorough site management with dust protection and low-noise construction. In the construction process, we use a small hydraulic jack in conjunction with a laser measurement device to accurately return the building to a level position without applying pressure to it, down to the millimeter. Along with repairing foundation cracks, we perform permanent ground reinforcement using steel pipe piles and pressure plates, providing a one-stop solution that includes reissuing ground warranties. We aim to transform the trust of clients who have been discouraged by troubles into a solid positive impression by providing "greater peace of mind than at the time of new construction."

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Settlement cracks in the mat foundation addressed with SWS investigation and partial jacking.

We will conduct pinpoint analysis of partial subsidence and cracks in the foundation using SWS investigation! We will rationally restore it through targeted jack adjustments and foundation reinforcement, eliminating waste.

This proposal is a settlement correction and structural reinforcement solution that effectively repairs partial settlement of the mat foundation and structural cracks without incurring excessive construction costs. By conducting a preliminary SWS (Screw Weight Insertion) test, we can pinpoint the specific soft layers or settlement areas causing the subsidence. By applying a "partial jack-up method" that selectively lifts and corrects only the necessary areas without jacking up the entire building, we minimize construction equipment and personnel, significantly reducing construction costs and time. Furthermore, for structural cracks in the foundation, we combine high-viscosity epoxy resin injection, carbon fiber sheet application, and additional foundation reinforcement to dramatically enhance the durability and toughness of the foundation structure beyond its original level. After jacking up, we will perform steel pipe pile insertion, pressure plate installation, and mortar filling to completely eliminate the risk of future subsidence recurrence. We provide a rational option that balances cost-effectiveness with reliable safety structures and the preservation of the building's asset value.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Seismic recovery of fabric foundation settlement cracks through SWS investigation and partial jacking.

Clarifying partial subsidence and cracks in the foundation through SWS investigation! We will reliably restore the building's seismic resistance and structural strength with partial jacking and carbon fiber reinforcement.

This construction method is a specialized solution that combines ground analysis based on the SWS (Screw Weight Penetration) test and partial jacking up for single-family homes where some settlement of the foundation and structural cracks have occurred. By conducting a preliminary survey, the causes of uneven settlement in the ground are identified as objective data, and small hydraulic jacks are placed in the settling foundation areas to perform precise horizontal corrections in millimeter increments. For structural cracks in the cloth foundation caused by settlement stress, high-viscosity epoxy resin injection and carbon fiber sheet reinforcement are applied, enhancing the strength of the concrete structure beyond that of a new build. Furthermore, by optimally combining the underpinning method of driving steel pipe piles into the supporting ground, we fundamentally eliminate the risks of future resettlement and uneven settlement during major earthquakes. This method allows for complete construction while residents remain in their homes, ensuring that the homeowner's daily rhythm and comfort are preserved while broadly restoring the overall structural safety of the house, so you can trust us with confidence.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Foundation settlement cracks addressed with SWS investigation and partial jacking with consideration for neighbors.

Analyzing partial subsidence and cracks in the foundation using SWS investigation! We will ensure safe construction with consideration for neighbors in densely populated residential areas through low-noise and low-vibration partial jack adjustments.

This construction method is a surrounding consideration type of settlement correction solution that safely resolves partial sinking of strip foundations and structural cracks that occur in densely populated residential areas or small lots with narrow spacing from neighboring properties. By conducting a pre-emptive SWS (Screw Weight Insertion) test and precise level measurements, we accurately quantify ground unevenness even in tight spaces and identify the causes. During construction, we selectively use electric hydraulic pumps that do not emit exhaust gases, as well as low-noise and low-vibration equipment, while minimizing the storage space for materials to thoroughly reduce traffic obstruction and noise stress for neighbors. We place small multi-stage hydraulic jacks in the limited gaps under the floor and beside the foundation, performing millimeter-level horizontal restoration while monitoring with high-precision laser level measuring instruments. Cracked areas of the foundation are treated with epoxy resin injection, and we strongly prevent re-sinking through the insertion of small-diameter steel pipe piles and the installation of pressure-resistant slabs. This reliable method perfectly balances construction while the client resides in the property and consideration for the neighbors.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Recovering value of foundation settlement cracks through SWS investigation and partial jacking.

Scientifically elucidating partial subsidence and cracks in the foundation through SWS investigation! Dramatically restoring the asset value of real estate with partial jack adjustments and re-attaching ground guarantees.

This construction method is a settlement correction solution that addresses partial sinking and structural cracks in cloth foundations, which are issues that arise during the buying and renovating of used single-family homes, significantly enhancing real estate value. Through preliminary SWS (Screw Weight Penetration) tests and high-precision laser surveying, the causes of building tilt and uneven ground settlement are clarified with objective data. During construction, small hydraulic jacks are placed at the sinking areas, and the structure is accurately lifted to a level position in millimeter increments under constant laser level monitoring. Cracked cloth foundations are repaired with epoxy resin injection to restore structural strength, and measures such as the insertion of steel pipe piles into deep support layers and the installation of pressure plates are taken to prevent re-settlement. This process enables the passing of mortgage examinations and building inspections, providing total support up to the re-attachment of ground guarantees. It fundamentally proves the safety of "problematic tilted properties," leading real estate transactions and asset preservation to assured success.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Foundation settlement cracks addressed with SWS investigation and partial jacking in an ultra-short construction period.

Rapid analysis of partial subsidence and cracks in the foundation using SWS investigation! We will quickly restore it with partial jack adjustments and immediate foundation repairs through digital continuous monitoring.

This proposal is a speed settlement correction solution that achieves millimeter-level high-precision adjustments in an extremely short construction period through the collaboration of digital measurement technology and an elite team, addressing partial subsidence of the foundation and structural cracks. By instantly digitally analyzing the data from the pre-conducted SWS (Screw Weight Penetration) test, we identify the localized soft layers causing the subsidence. During the lifting operation, we use a super high-precision 3D laser level measuring device in conjunction with a small hydraulic jack to accurately return the building to a level position in millimeter increments while monitoring the displacement in real time. For the cracks in the foundation caused by subsidence, we apply pressure injection of high-viscosity epoxy resin to quickly restore the structural strength, and we strongly prevent re-subsidence through the insertion of steel pipe piles into the supporting layer and filling with non-shrink mortar. This process requires no temporary housing or moving, minimizing living stress during the construction period, and swiftly restoring the peace of mind and healthy living environment of a newly built home in a short time.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic recovery of residential fabric foundation settlement cracks using SWS investigation and partial jacking.

Clarifying the subsidence and cracks of the foundation through SWS investigation, and restoring seismic resilience with partial jacking up.

In residential foundation reinforcement, it is essential to address issues such as foundation settlement and cracking early on to maintain the long-term safety and comfort of the building. Particularly in the case of strip foundations, certain settlements and structural cracks can potentially impact the building's seismic resistance and structural strength. Ignoring these problems can accelerate the deterioration of the building and increase the risk of major repairs in the future or during an earthquake. Our settlement correction work addresses these challenges with scientific investigation and precise repair techniques, restoring the safety of the building. 【Usage Scenarios】 - Detached houses with partial settlement or structural cracks in strip foundations - Cases requiring recovery of the building's seismic resistance and structural strength - Situations where there is a desire to reduce the risk of future settlement or differential settlement during a major earthquake - Cases where construction needs to proceed while residents are still living in the home 【Benefits of Implementation】 - Reliable recovery of the building's seismic performance and structural strength - Stabilization of the foundation through precise horizontal correction at the millimeter level - Improvement of concrete structural strength through carbon fiber reinforcement - Fundamental elimination of future settlement risks through steel pipe pile driving - Construction that respects the residents' daily routines while they continue to live in the home

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Subsurface Correction Work | Epoxy Injection Pressure-Supported Slab Method to Repair Foundation Cracks and Partial Settlements

Simultaneously overcome foundational cracks and partial subsidence! We will strongly repair the base of your home using a combination of high-adhesion epoxy resin injection and pressure-resistant slab methods.

This is a reliable sinking correction solution that fundamentally addresses the issue of building subsidence accompanied by foundation cracks. For structural cracks in the foundation caused by uneven ground or localized softening, high-viscosity epoxy resin is injected and filled under high pressure and density to restore the compromised structural strength and significantly improve waterproofing. At the same time, a pressure plate is precisely installed directly beneath the sunken foundation, and high-precision millimeter-level lift-up is performed using hydraulic jacks to restore the tilted building to a precise horizontal state. After the jacking is completed, air bubble mortar (air milk) is poured into the fine gaps that have formed between the foundation and the ground, filling and solidifying them without any gaps, significantly increasing the contact area to prevent future re-sinking or differential settlement. Since this solution accommodates construction while residents are living in the home without the need for large machinery, extensive demolition, or temporary relocation, it greatly reduces the burden on homeowners' daily lives and secondary costs such as temporary housing rent. With reliable construction techniques and uncompromising quality control, we dramatically restore the seismic resistance, durability, and asset value of homes, providing long-lasting peace of mind.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Submersion Correction Work | Investigation of Foundation Cracks and Epoxy Pressure Plate Correction through SWS Survey

Investigating the causes of basic cracking and partial subsidence through SWS surveys! Achieving cost-effective repairs with minimal waste by combining epoxy resin injection and pressure-resistant slab methods.

This is a low-cost, high-precision subsidence correction method that repairs building subsidence accompanied by foundation cracks without waste, based on scientific diagnosis through SWS (Screw Weight Penetration) testing and precise level measurement. It accurately analyzes ground resistance values and the distribution of weak layers at multiple points within the site to investigate the true causes of subsidence. For the foundation structure damaged by subsidence stress, high-viscosity epoxy resin is pressure-injected to seal and repair cracks, restoring bending strength and seismic resistance to levels exceeding those of new construction. In the lifting process, pressure plates are concentrated under the foundation in the subsidence area, and small hydraulic jacks are linked with high-precision laser measuring devices to carry out millimeter-level precise leveling adjustments. After jacking up, high-density air-mortar (air milk) is injected into the gap between the foundation and the ground to densify it, preventing future risks of re-subsidence. Since it can be constructed with minimal excavation and partial jacking adjustments, it does not incur excessive construction costs and safely and reliably resolves tilting issues in a short period while residents remain in the building.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Underpinning repair work | Epoxy injection method for foundation cracks that can be repaired while living in the house.

No need to move, and temporary housing costs are zero! We will repair foundation subsidence and cracks while you live there using high-adhesion epoxy resin injection and pressure-resistant slab methods.

This is a reliable home repair solution that allows you to safely and neatly repair building subsidence with foundation cracks while living in your familiar home. Since there is no need for moving or securing temporary housing, you can significantly cut unnecessary secondary costs and efforts, which can range from several hundred thousand to several million yen. High-viscosity epoxy resin is injected densely into the damaged foundation structure due to subsidence stress, firmly bonding and reinforcing the cracks to improve structural strength and waterproofing. In the lifting process, a compact pressure plate and hydraulic jacks are set under the foundation, and the building's behavior is monitored with high-precision laser measurements to accurately correct the tilt in millimeter increments. By using quiet equipment that minimizes noise and vibration, and thoroughly implementing dust prevention measures to keep dust from entering the interior, the construction can be completed in a short period without compromising the comfort of remote work or daily life. After the jacking up, air milk is filled at the base to prevent re-subsidence, and we provide consistent support until the ground warranty is reattached, delivering the highest sense of security to the homeowner, even better than at the time of new construction.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Epoxy injection method for pressure-resistant slabs with shallow foundation cracks and settlement correction.

Quickly resolve foundation cracks and partial subsidence after handover! Complete restoration of post-delivery trust through the combined use of high-adhesion epoxy resin injection and pressure-resistant slab methods.

This is a reliable settlement correction plan that aims to quickly resolve foundation cracks and partial subsidence issues that occur in newly built homes after handover, with the utmost consideration from the construction company and house manufacturer towards the homeowner. For foundation cracks caused by uneven ground or soil consolidation, high-viscosity epoxy resin is pressure-injected to ensure adhesion and waterproofing of the structure. In the lifting process, pressure plates are concentrated directly beneath the foundation, and using small hydraulic jacks and high-precision laser measurement, precise leveling is performed in millimeter increments, using the building's own weight as a counterforce. After the jacking is completed, air bubble mortar is injected at high density into the voids beneath the foundation to establish surface support and prevent future subsidence. The construction can be carried out while the homeowner is still living in the house, eliminating the need for temporary relocation and reducing secondary costs and mental burden for the homeowner. By providing consistent support through the process of reattaching ground guarantees after construction, we fulfill our responsibility for defect handling and strongly support the rebuilding of trust through aftercare.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Epoxy pressure-resistant slab method to repair foundation cracks and settlement in small sites.

Resolve foundation cracks and partial subsidence near narrow lots and property boundaries! Safe restoration with high-viscosity epoxy resin injection and pressure-resistant slab method, considering neighboring properties.

This is a subsidence correction technology that safely and with low vibration resolves partial subsidence issues accompanied by foundation cracks in densely populated residential areas and narrow sites adjacent to property boundaries. For foundation cracks caused by excavation on neighboring land or lateral flow of fill, high-viscosity epoxy resin is injected densely to strongly bond and reinforce the broken structure, restoring structural rigidity and waterproofing. In the lifting process, it accommodates narrow sites where large machinery cannot enter by concentrating compact, high-strength steel pressure plates directly under the foundation. Using small hydraulic jacks and high-precision laser measuring instruments, the building's weight is used as a reaction force to carefully lift it millimeter by millimeter, returning it to a precise horizontal state without affecting neighboring houses. After correction, self-hardening lightweight bubble mortar (air milk) is poured into the voids under the foundation to densify it, expanding the contact area to prevent re-subsidence. With construction carried out while residents are living in the home, eliminating the need for temporary housing, and thorough low-noise and dust control measures, it minimizes neighborhood disputes while protecting the structural stability and asset value of the home.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement Correction Work | Epoxy Pressure Plate Method to Repair Foundation Cracks and Settlement in Used Houses

Completely overcome foundation cracks and partial subsidence in used houses from the ground up! Dramatically restore property value with high-viscosity epoxy resin injection and pressure-resistant slab methods.

This is an advanced settlement correction solution that resolves foundation cracks and partial subsidence issues identified in used housing transactions and inspection surveys, dramatically enhancing the value of real estate assets. For foundation cracks caused by uneven ground, high-viscosity epoxy resin is pressure-injected to integrate and reinforce the structure, restoring seismic strength and waterproofing to the level of new construction. For correcting tilting, high-strength pressure plates and hydraulic jacks are installed beneath the foundation, allowing for precise millimeter-level horizontal lift-up while monitoring displacement with high-precision laser measuring devices. It effectively resolves issues with door operation and floor inclinations, ensuring compliance with building inspections and mortgage review standards. After lifting, bubble mortar (air milk) is filled and compacted beneath the foundation to prevent re-sinking, providing consistent support until the ground warranty is reinstated. With rapid construction that does not require temporary housing, it minimizes the burden on homeowners during pre-sale renovations or post-purchase repairs before handover, strongly supporting the smooth completion of real estate transactions.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Epoxy pressure-resistant slab method to repair foundation cracks at retaining walls and embankments.

Solve foundation cracks and uneven settlement caused by uneven ground at retaining walls and embankments! We will strengthen the foundation using high-viscosity epoxy resin injection and pressure-resistant slab methods.

This is a high-precision settlement correction solution that fundamentally addresses the problem of uneven ground and differential settlement associated with foundation cracking in residential areas close to retaining walls and embankment/cut boundaries. For the foundation concrete structure that has fractured due to uneven loading, high-viscosity epoxy resin is injected densely to bond and repair the cracks, restoring structural rigidity and waterproofing to the level of new construction. In the lifting process, a thick steel plate pressure distribution slab and hydraulic jacks are set directly under the foundation, and real-time monitoring of the building's behavior is conducted using high-precision laser measurement, allowing for accurate horizontal correction in millimeter increments. After lifting is complete, lightweight bubble mortar (air milk), which has excellent fluidity, is filled into the voids beneath the foundation to densify it, expanding the contact area to support the building's weight over a larger surface and strongly preventing future re-settlement. This method can be implemented even in areas near retaining walls or in narrow spaces where large machinery cannot be brought in, and by accommodating construction while residents are living in the property without the need for demolition or temporary housing, it dramatically reduces secondary expenses and living stress for the homeowners.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Digital measurement for foundation cracks and settlement correction epoxy pressure plate

Prevent distortion of buildings with 3D laser measurement! Correct foundation cracks and subsidence with millimeter precision using high-adhesion epoxy resin injection and pressure-resistant slab methods.

This is a state-of-the-art settlement correction solution that resolves building settlement issues accompanied by foundation cracks with millimeter-level precision, based on visualization data management using a 3D laser measurement system. For the foundation structure that has fractured due to settlement stress, high-viscosity epoxy resin is pressure-injected to create a dense seal, restoring the integrity and waterproofing of the structure and providing seismic strength greater than that of a new building. In the lifting process, a pressure plate and hydraulic jacks are placed directly under the foundation, and ultra-high precision laser level measuring instruments and displacement sensors are linked to continuously monitor and digitally measure the building's lifting behavior and tilt angle. To accurately restore horizontal alignment with millimeter precision without causing harmful distortions or stress concentrations in the structure, it perfectly prevents secondary damage to the house, such as wall coverings tearing or beams warping. After correction, self-hardening lightweight bubble mortar (air milk) is injected at high density into the voids beneath the foundation to distribute the ground pressure evenly, completely eliminating the risk of re-settlement. We offer consistent support for construction while residents are living in the property, with a reliable ground guarantee provided.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sinking correction work | Epoxy pressure-resistant slab to repair foundation cracks and sinking without stopping the piping.

We will not stop city gas or water supply at all! We protect living infrastructure and repair foundation cracks and subsidence with high-adhesion epoxy resin injection and pressure-resistant slab methods.

This is a stress-free subsidence correction plan that safely resolves building subsidence issues accompanied by foundation cracks without completely shutting off essential living infrastructure such as city gas, water supply and drainage, and electricity. For the foundation structure damaged by subsidence stress, high-viscosity epoxy resin is pressure-injected to tightly seal the cracks, restoring structural strength and waterproofing to the level of a new building. In the lifting process, flexible joint temporary installations and piping-following technology are introduced to prevent breakage of existing pipes, and high-precision laser measurements are used to accurately level the foundation in millimeter increments with a pressure plate and hydraulic jacks. During construction, the kitchen, bath, and toilet can be used as usual, so there is no need to move to temporary housing or incur unnecessary secondary expenses. After jacking up, lightweight aerated mortar (air milk) is injected at high density under the foundation to prevent re-subsidence, and by providing consistent support until a reliable ground guarantee is reinstated, we ensure the comfort of the client's living environment and the structural stability of their home.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Epoxy pressure-resistant slab to fix foundation cracks and settlement before renovation.

Fundamentally solve foundation cracks and partial subsidence before renovation! We dramatically enhance the seismic resistance of your home with high-adhesion epoxy resin injection and pressure-resistant slab methods.

This is a seismic and structural reinforcement type settlement correction solution that is implemented prior to large-scale renovations or remodeling work, fundamentally addressing foundation cracks and building subsidence. For foundation cracks caused by uneven ground settlement or deterioration, high-viscosity epoxy resin is pressure-injected to integrate and reinforce the structure, upgrading seismic strength and waterproofing to levels exceeding those of new constructions. In the lifting process, high-strength pressure plates and hydraulic jacks installed directly beneath the foundation are used, with constant monitoring via high-precision laser levels to accurately lift and correct the tilt in millimeter increments. By neatly resolving floor inclinations and column twists, the interior and fixture work during the renovation can proceed with exceptional precision and smoothness. After jack correction, high-density air-mortar is injected into the voids beneath the foundation to solidify and eliminate the risk of re-subsidence. We provide total support until the reattachment of ground guarantees, significantly enhancing the durability and asset value of the home after renovation.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 123 Next
  • 目的・課題から技術・サービスを探せるメディカルケア専門サイト
    • Contact this company

      Contact Us Online

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    IPROS Services
    • >IPROS GMS | Search site for the manufacturing industry
    • >IPROS | Search site for the B2B industry
    COPYRIGHT © 2001-2026 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.