Underpinning Renovation Work | A Plan for Jacking Up Detached Houses to Restore Client Trust
Subsidance correction work
A construction plan for jack-up work on single-family homes to maintain the residents' living conditions. This is a site management guideline for contractors to promptly respond to complaints and defects while the owner is still residing in the home.
This is a technical and management guide for house lifting construction plans specifically designed for construction companies and house manufacturers, aimed at maintaining the residents' quality of life. It comprehensively covers the process management guidelines for professionals to correct building tilt in the shortest time possible while residents continue to live in the property, without imposing the burden of moving or temporary housing on the owners when issues of differential settlement are discovered after handover. Based on ground investigation data, it accurately combines the use of existing columns, steel pipe jacking methods, and pressure slab methods to detail the process of returning the entire building to a level position without distortion. It includes a checklist of management considerations unique to occupied sites, such as attention to noise reduction, selection of low-noise and low-vibration equipment, and dust prevention measures. This practical document is essential for builders to restore trust and address warranty issues, covering everything from dialogue techniques to alleviate the psychological stress of owners, to various procedural steps for reattaching ground guarantees and insurance application processes.
Inquire About This Product
basic information
It describes the equipment configuration and construction management specifications that meet the quality standards of residential builders. It covers high-output hydraulic jacks that can handle settlements exceeding 150 mm, a 3D laser measurement system that detects tilt in millimeter increments, and compact excavators that can access narrow sites. It also includes the specifications for the carbon fiber sheet reinforcement method "Ganko Oyaji," which beautifully repairs foundation cracks, lightweight and high-strength bubble mortar materials used for backfill, and the format for level measurement reports that prove horizontal accuracy over the long term after construction.
Price range
Delivery Time
Applications/Examples of results
In the design and after-sales maintenance departments of house manufacturers and construction companies, it can be utilized for presenting plans for differential settlement restoration to clients and formulating internal construction guidelines. It is ideal for situations that require a balance between technical reliability and consideration for the client, such as fulfilling warranty obligations for defects within ten years, applying for renovation defect insurance, planning recovery work for construction defects, and reaching settlements or agreements with the builder. It is used with the aim of fully fulfilling the company's technical responsibilities while protecting the daily lives of residents and resolving issues quickly and amicably.
catalog(4)
Download All Catalogs
Company information
-


![[Case Study of Super Jack System] Expressway](https://image.www.ipros.com/public/product/image/315/2000792512/IPROS51343811922895894380.png?w=280&h=280)



