We will restore the tilted house. Subsidence correction work to prevent further sinking.
We provide settlement correction work to restore tilted houses that have experienced differential settlement. In the most commonly used steel pipe pile driving method, the building's load is used as a reaction force to drive steel pipe piles into the supporting ground using jacks, thereby supporting and correcting the entire building. This method not only corrects the settlement of the building but also prevents further settlement. Additionally, we select and implement the most suitable method from options such as pressure slab method, building relocation and new pile construction, and cement milk injection method, according to the ground conditions and the state of settlement.
Inquire About This Product
basic information
As a preliminary survey, we will conduct level measurements of the building's exterior and indoor floors, an inspection of the underfloor, and 4 to 5 points of Swedish sounding tests in one day, and submit deliverables such as a ground survey report and survey drawings. The steel pipe pile driving method does not require relocation and can be performed while maintaining the living conditions. There is minimal noise, vibration, and dust generation, and the space required for equipment storage is small. The process will cover preparation, demolition, excavation, steel pipe driving, settlement correction using jacks, mortar filling, and restoration of the substrate.
Price range
Delivery Time
Applications/Examples of results
This applies to corrections or maintenance when differential settlement occurs in buildings. Differential settlement measurements and a six-month observation period are conducted, and construction methods are selected based on the condition. If the soft layer is deep, methods such as steel pipe pile driving or moving the building and installing new piles are used. If the soft layer is shallow or if settlement has stabilized and corrections are being made, a pressure-resistant slab method is applied. Additionally, if settlement has stabilized and the goal is to maintain the current state, methods such as cement milk injection are employed, addressing various cases of settlement conditions.
catalog(1)
Download All CatalogsCompany information
-



![[Construction Example] Restoration Work of a Wooden House in Mihama 3-chome, Urayasu City, Chiba Prefecture](https://image.www.ipros.com/public/product/image/5f0/2000495424/IPROS73556627643347780831.png?w=280&h=280)

![[Construction Case] Slab Foundation House: Settlement Correction Work (Kawasaki City, Kanagawa Prefecture)](https://image.www.ipros.com/public/product/image/9d6/2001214104/IPROS99093569727016094796.png?w=280&h=280)





