Construction method Product List and Ranking from 1590 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Apr 01, 2026~Apr 28, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Apr 01, 2026~Apr 28, 2026
This ranking is based on the number of page views on our site.

  1. ネプラス工法全国会 本部 Niigata//General contractors and subcontractors
  2. 成瀬化学 Mie//Building materials, supplies and fixtures manufacturers
  3. TRAWE main office Saitama//Other construction industries
  4. 4 コンステック Osaka//General contractors and subcontractors
  5. 5 徳和工業 Miyagi//Other construction industries

Construction method Product ranking

Last Updated: Aggregation Period:Apr 01, 2026~Apr 28, 2026
This ranking is based on the number of page views on our site.

  1. 側溝修繕工法『ネプラス工法』<施工前後の写真付き資料進呈> ネプラス工法全国会 本部
  2. Waterproof layer renovation method for achieving the long lifespan of facilities! Narlite injection method. 成瀬化学
  3. 建物外壁工事 ロープアクセス工法 TRAWE main office
  4. 4 Vacuum concrete construction method 徳和工業
  5. 5 D-Lite D Board Method [Non-combustible decorative panel that can be processed on-site] 大建工業

Construction method Product List

2341~2370 item / All 4299 items

Displayed results

Unit house | Rental use OK! Authentic design & fast construction

Design and quality for "limited-time architecture" with features like full glass and wood-patterned louvers.

Our company offers a "unit house" that pursues design and comfort, which is difficult to achieve with conventional unit houses and prefabs. You can easily use it for rent, and we provide a variety of options such as "full glass" and "wooden louver panels," enabling us to respond to urgent needs with fast construction! It is ideal for various spaces that prioritize comfort and design, such as event facilities, residential sales offices, temporary offices or stores during reconstruction periods, while being used temporarily. Of course, we also support building confirmation applications. 【Features】 ■ Bright white color walls (exterior and interior) ■ Rentable FIX front glass ■ A wide range of options that can be freely combined ■ Standard equipment includes parapets, base covers, and downspouts for a clean appearance ■ Achieves an open space with a ceiling height of 2.34m (high type is 2.69m) ■ Super-fast construction produced in a factory and installed on-site *For other functions and details, please contact us.

  • Prefab
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Road Plus (Extended Lane)

Simple Expansion Method for Road Widening

This is a simple cantilever road widening method aimed at small-scale road widening of approximately 1.5 meters in narrow sections of roads in mountainous areas.

  • Dam construction
  • Airport facilities
  • Civil Engineering CAD
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Wide Wall Method (Roadway Widening Method)

Road widening method completed simultaneously with block stacking.

This technology allows for an approximately 2-meter widening by being constructed in the same manner as conventional large block retaining walls, and it enables a lower wall height compared to traditional methods when widening roads in steep terrain. Additionally, it reduces the amount of excavation needed, making it environmentally friendly and promising cost reductions. Received the 11th National Land Technology Development Award in FY 2009 [Regional Contribution Technology Award].

  • Dam construction
  • Retaining wall
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Total Cost Reduction Method "Sun K Clear Method"

Labor-saving, effort-saving, shortened construction period, and easy installation! Ideal for improving the work environment on-site.

The total cost reduction method "Sun K Clear Method" allows for the installation of precast products by adjusting the height with a jack and then floating the main body above the foundation using pre-installed "Raku Pita (height-fixing bolts)." Concrete is then filled into the gap, integrating the retaining wall with the base. This method enables the construction of a robust retaining wall while improving the working environment on-site, reducing installation time, and achieving labor and effort savings, resulting in a total cost reduction. 【Features】 ○ Easy installation ○ Safe construction ○ Complete integration ○ Reduced installation time, labor, and effort ○ Improved installation accuracy For more details, please contact us or download the catalog.

  • Airport facilities
  • River construction
  • Retaining wall
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Takagi Support-Free Planting Method

This is a planting method suitable for tall trees.

■This construction method is an underground support method for trees using anchor piles. ■It is ideal for places that prioritize aesthetics, such as golf courses and stadiums, or where it is inconvenient to install supports in narrow spaces. ■It effectively supports tall trees by utilizing eccentric forces. ■It is patented. (Patent No. 3383934)

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sediment control dam wall construction method (dam wall)

It is possible to construct a dam that matches the natural landscape by applying stone planting and decorative elements to the front of the sediment control dam block.

We would like to introduce our "Sabo Dam Wall Method (Dam Wall)." All 15 types of vertical-type Sabo dam blocks, ranging from 0.5 to 0.7 (in 0.05 increments), are self-supporting, which ensures high stability during construction and makes the work easier. Additionally, even when the slopes of the front and back of the dam differ (for example, a front slope of 2 and a back slope of 5), the design ensures that the vertical height of one layer of Sabo dam blocks is consistently 1.5 meters, allowing for a concrete placement height of 1.5 meters for the embankment. 【Features】 ■ Self-supporting precast blocks ■ Custom-designed for each slope ■ Does not compromise aesthetics ■ Excellent cost-effectiveness *For more details, please refer to the PDF materials or feel free to contact us.

  • Retaining wall
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BSB Block Sediment Control Dam Construction Method

By reducing material costs and decreasing the amount of leftover soil, it is possible to reduce transportation and disposal costs, leading to a reduction in construction costs!

We would like to introduce our "BSB Block Erosion Control Dam Construction Method." By using excavated soil and locally generated soil around the construction site as structural materials, we can reduce the amount of leftover soil disposal, allowing for a decrease in transportation and disposal costs. Additionally, all materials used, including cement and locally generated soil, can be utilized as long as they meet the required quality after mixing. 【Features】 ■ Reduction of leftover soil disposal ■ Cost reduction ■ Relaxation of construction conditions ■ Contribution to a resource-recycling company ■ Improvement of safety ■ Adoption of external protective materials *For more details, please refer to the PDF document or feel free to contact us.

  • Retaining wall
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

PC Well Method

PC Well Method

The PC well method involves stacking cylindrical single blocks at the construction site while introducing prestress using a post-tensioning method. The interior is excavated using various excavation machines such as hammer grabs, and ground anchors are driven and installed to a specified depth as a reaction force. The single blocks are equipped with PC copper rods, rebar placement holes, grout injection ports, and anchor plates, designed to standardize work at the construction site. The excavation methods include in-bucket excavation with hammer grab buckets and undercutting with widening excavators, making it suitable for a wide range of soil types. There are two types of PC wells: PC structure and PPRC structure. Features of the method: 1. It uses factory-manufactured precast components, ensuring thorough quality control, making it a highly reliable method. 2. Construction management is easy. 3. Since it is installed using a jacking method, it has minimal impact on the surrounding ground and is suitable for close-proximity construction. 4. It allows for low vibration, low noise, and high safety during construction. 5. It does not require temporary closures or island construction even for underwater work. 6. The construction accuracy is excellent. 7. The construction period can be shortened.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Coastal protection works using stone net method

Coastal protection works using stone net method

The irregular stone structure is permeable and preserves the ecosystem of aquatic plants and animals. 【Features】 ○ The installation area of the stone products is large at 4 square meters (standard), making it easy to work with. ○ The flexible structure of the wire mesh accommodates changes in slope and natural curves. ● For other functions and details, please contact us.

  • Airport facilities
  • River construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Coastal protection works - Stone net method

Coastal protection works - Stone net method

This is a method that integrates a special basket mat and stone net. 【Features】 ○ Used for riverbank stabilization, bed protection, and embankment works in rivers with high flow force. ○ Using natural stones or contact materials for infill can also contribute to water quality purification. ● For other functions and details, please contact us.

  • Airport facilities
  • River construction
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Foundation work Top Base method

Foundation work Top Base Method

The Top Base Method has many features that are not found in other methods. The principle of the great "Stone Method" established by the battlefield demonstrates excellent effects on the current foundations of civil engineering and architecture by using "my own spinning top." In addition to ground reinforcement, it has many advantages such as excellent economy and workability, high reliability, and can be widely utilized in various foundation works. 【Features】 ○ Safely supports superimposed loads even on extremely weak ground ○ Reduces settlement and prevents differential settlement ● For other functions and details, please contact us.

  • Steel structure construction
  • Foundation construction
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic Joint for Manholes Santac Cap FD Type

Proven exceptional seismic resistance, water resistance, and workability.

This is a seismic joint for Level 2 earthquake response.

  • glue
  • Manhole body
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

ツインドリル工法

確かな開発力で施工技術を革新する

安全性確保をテーマに研究開発された当協会独自の工法です

  • Manhole body
  • Other civil engineering services
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sewer construction - Revo method

Drainage construction Revo method

This is a method for constructing a vertical shaft using a circular casing tube without the use of sheet pile supports or liner plates, utilizing a revocable shaft machine. 【Features】 ○ The equipment is compact, requiring a small footprint. Additionally, with a body weight of 3.4 tons, it can be transported by a 4-ton truck. ○ Even in urban construction, it is less affected by nearby structures and obstacles compared to conventional methods, allowing for efficient work progress through the use of cover plates and other materials. ● For other functions and details, please contact us.

  • Covering plate
  • Other civil engineering works
  • Piles, caissons, sheet piles
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Drainage construction Revo II method

Drainage construction Revo II method

The method of constructing a shaft easily and at low cost using the Rev II shaft machine, which is a further miniaturized version of the Rev shaft machine. 【Features】 ○ The Rev shaft machine has been further miniaturized, reducing its width to 1.7m and weight to 1.46t, and achieving a split-type design (upper part: 0.74t, lower part: 0.72t), allowing for the transportation and installation/removal of the machine using a 2t crane truck (lifting capacity of 2t). ○ With easier installation and removal, casing recovery has become possible. This allows the casing costs, which accounted for a large portion of construction expenses, to be recorded as a loss, enabling further cost reductions. ● For other functions and details, please contact us.

  • Other civil engineering works
  • Crane and others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Wood muscle (sujikou)

Wood muscle (sujikou)

A greening foundation method aimed at contributing to the natural restoration (reforestation) of cut slopes and similar surfaces. It can be applied to steep slopes, improving the vegetation environment by arranging thinned timber in a linear fashion to create a stepped shape. 【Features】 ○ Promotes the use of thinned timber for forest conservation and forestry promotion. ○ The use of thinned timber allows for the creation of stepped slopes, enhancing the vegetation environment. (Stepping of slopes) ○ Over time, thinned timber will weather and return to the soil, minimizing the residual presence of foreign materials. ○ It can be shaped into frames or linear arrangements, allowing for flexible design modifications. ○ Using thinned timber ensures a natural appearance that blends seamlessly with the environment. ○ By restoring slopes naturally, maintenance costs can be significantly reduced in the future. ● For other functions and details, please contact us.

  • Other civil engineering works
  • Earthworks
  • Pile and foundation work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Local Recycling Spray Method

Would you like to effectively utilize useful waste generated in the region (such as sludge and wood waste) and engage in natural restoration?

The Local Recycling Spraying Method is a technique for natural regeneration of slopes that effectively utilizes useful waste generated within the region (such as sludge and wood waste). The "Local Recycling Spraying Method" is a recycling greening technique that can create a stable vegetation foundation regardless of the differences in the components of useful waste generated in the area (such as sludge and wood waste). It allows for the use of a wide range of useful waste and significantly contributes to adjusting and alleviating the supply and demand balance of useful waste, which tends to be uneven within the region. 【Features】 - Allows for the use of a wide range of useful waste - Enables greening of steep slopes - Constructs soil that is ideal for vegetation with adequate moisture *For more details, please contact us or refer to the catalog.

  • Other civil engineering works
  • Earthworks
  • Pile and foundation work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Geodrain Method - Plastic Drain Method Using Horizontal Drains -

Geodrain Method - Plastic Drain Method Using Horizontal Drains -

This is a resource-saving plastic drainage method that uses horizontal drain materials instead of sand mats as horizontal drainage materials. (NETIS Registration Number: KTK-080003-A) 【Features】 ○ Uses horizontal drains (plastic drainage materials) instead of sand mats, eliminating the need for high-quality sand. ○ The design can take into account the water flow performance of both vertical and horizontal drains. ○ By using factory-produced horizontal drain materials with uniform quality, it can improve consolidation delays compared to sand mats. ○ Horizontal drain materials are lightweight and can be installed manually, with no concerns about noise or vibration. They also do not absorb water or swell, providing excellent workability. ● For other functions and details, please contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Eco Geodrain Method - Biodegradable Plastic Drain Method

Eco Geo Drain Method - Biodegradable Plastic Drain Method

This is a plastic drainage method that uses environmentally friendly biodegradable plastic drainage materials, contributing to a sustainable and circular society. (NETIS Registration Number: KTK-070005-A) 【Features】 ○ This is a resource-saving plastic drainage method that uses horizontal drainage materials instead of sand mats. The horizontal drainage materials are lightweight and can be installed manually, eliminating concerns about noise and vibration. ○ It utilizes vertical drainage materials "Nonald Drain" and horizontal drainage materials "BSB Drain," both made from plant-based biodegradable plastics. ○ The drainage materials used have strength and drainage performance equivalent to conventional plastic board drains and can be handled with the same design and construction methods as before. ○ By using plant-based biodegradable plastics, it reduces the amount of petroleum resources used and contributes to the reduction of carbon dioxide in the atmosphere. ● For other functions and details, please contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SPD Method - Vacuum Consolidation Method Utilizing Atmospheric Pressure

SPD Method - Vacuum Consolidation Method Utilizing Atmospheric Pressure -

This is a vacuum consolidation method that utilizes atmospheric pressure in combination with a plastic drainage method. 【Features】 ○ The improvement area is covered with an airtight sheet, and a vacuum device creates a vacuum state beneath the sheet to forcibly discharge water from the soft ground. ○ It can be applied even to soft ground where loading embankments cannot be constructed. ○ By not using loading embankments, it reduces the need for securing land for construction. ○ It is an economical method that shortens construction time by not using embankment materials or sand mats. Additionally, it eliminates the need for heavy machinery operations, making it an environmentally friendly method. ○ "GeoDrain" and "Nonal Drain" are used as vertical drainage materials, while "SB Drain" and "BSB Drain" are used as horizontal drainage materials. ● For other functions and details, please contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Product transportation installation method "Lift Roller Method PAT."

Even in places where tree felling is necessary, it is possible to carry out construction without cutting down trees, while also considering the natural environment.

**Features** - It allows for easy transportation and installation in locations where truck cranes cannot be used, such as under elevated roads and railways, under power lines, or in areas where temporary roads cannot be constructed. - As a self-propelled device that does not require special guides for the foundation concrete, it can be used for construction in curved sections and at bends. - It can accommodate slope construction in the longitudinal direction up to 10% (5% for lift rollers), and it is also capable of handling drop sections. - Concrete products are transported to the installation site, and adjustments in the vertical and horizontal directions are made using hydraulic cylinders, allowing for precise positioning. - The lift rollers are electric, resulting in low noise and low vibration, minimizing impact on the surrounding area. - In locations where tree removal would be necessary for crane construction, it can be installed without cutting down trees, demonstrating consideration for the natural environment. - It can widely accommodate products such as box culverts, three-sided ditches, L-shaped ditches, inverted T-shaped products, and slabs. - We offer "hanging type" (internal suspension) and "side type" (external suspension) options to suit site conditions. *For more details, please download the PDF or feel free to contact us.*

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Large-scale earth reinforcement wall construction method "Super Tail Armé"

Achieving a significant reduction in construction time! By increasing the panel size by approximately 1.5 times, the number of installation tasks is greatly reduced.

The "Super Tail Arume" is a large-scale embankment reinforced soil wall construction method that reduces construction costs through the enlargement of panels, reduction of total strip length, and improvement of compaction frequency. By adopting large rectangular panels, various design panels and art reliefs can be selected. Additionally, by using precast components with irregular top panels and caps, on-site adjustment work can be reduced. 【Features】 ■ Possible reduction in construction costs ■ 30% reduction in panel installation time ■ 25% reduction in total strip length ■ 20% reduction in compaction frequency ■ Improved safety *For more details, please refer to the PDF materials or feel free to contact us.

  • image_02.png
  • image_03.png
  • image_04.png
  • image_05.png
  • image_06.png
  • image_07.png
  • image_08.png
  • image_09.png
  • image_10.png
  • Special Construction Method
  • Retaining wall
  • Concrete Retaining Wall
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Greening Possible Embankment Construction Method "Terra Trail EG6"

The wall height can accommodate up to 6m! By adopting a uniquely developed U-shaped anchor, both workability and cost-effectiveness have significantly improved.

The "Terra Trail EG6" is a greenable embankment construction method with a flexible structure that follows the compaction of the embankment. The wall material uses mesh panels, achieving both greening and lightweight materials. By adopting a uniquely developed U-shaped anchor, the workability and cost-effectiveness have significantly improved. Additionally, the front slope can be adjusted up to 1:0.3, making it adaptable even in cases with land restrictions. 【Features】 ■ The wall material uses mesh panels, achieving both greening and lightweight materials ■ The front slope can be adjusted up to 1:0.3 ■ Adaptable even in cases with land restrictions ■ Construction costs are reduced by 30% compared to other methods ■ Flexible structure that follows the compaction of the embankment *For more details, please refer to the PDF materials or feel free to contact us.

  • image_14.png
  • image_15.png
  • image_16.png
  • image_17.png
  • Retaining wall
  • Special Construction Method
  • Wall and rooftop greenery
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Method Product Catalog

"Open Shield Method" and "OSJ Method" are featured! Landscape products are introduced using photographs.

This catalog introduces the "methods" employed by Maruei Concrete Industry. It features the "Lift Roller Method," which allows for easy transportation and installation even in places where truck cranes cannot be used, as well as the "Arm Roller Method" and the "Jack-Up Roller Method." Additionally, landscape products are introduced using photographs. [Contents (partial)] ■ Lift Roller Method ■ Arm Roller Method ■ Jack-Up Roller Method ■ PC Vertical Tightening Connection Method ■ Open Shield Method *For more details, please refer to the PDF document or feel free to contact us.

  • 2022-07-04_10h06_09.png
  • Special Construction Method
  • Other earthworks, foundation works, and exterior floors
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration