Construction method Product List and Ranking from 1593 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Feb 04, 2026~Mar 03, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Feb 04, 2026~Mar 03, 2026
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. エルニード協会 Kagawa//Other construction industries
  3. HOKOKU ENGINEERING CO.,LTD. Osaka//Other construction industries
  4. 4 シーカ・ジャパン Tokyo//Building materials, supplies and fixtures manufacturers
  5. 5 水研 Shiga//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Feb 04, 2026~Mar 03, 2026
This ranking is based on the number of page views on our site.

  1. 地下水・軟弱地盤対応の基礎工法『スーパーラップルエルニード工法』 エルニード協会
  2. Foundation Omega Method HOKOKU ENGINEERING CO.,LTD.
  3. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  4. 4 Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  5. 5 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック

Construction method Product List

2341~2370 item / All 4276 items

Displayed results

[Stronger Method Adoption Example] Replacement of Bent Columns

The construction period is one day! The cost is less than half compared to base plate type or when demolishing and rebuilding.

Our company offers a rockfall protection fence reinforcement method called "Stronger Method," which allows for the reuse of bent posts by utilizing existing structures. First, remove the wire attachment fittings and cut the post at the base (250mm from the top). Then, attach the post connection member (only bolted). Next, install the raised post and reattach the removed wire attachment fittings. Compared to base plate systems or complete demolition and new installation, the cost is less than half, and the construction period can be completed in one day. [Example of Adoption] ■ Location: Yamanashi Prefecture ■ Type: Raised type ■ Work Procedure 1. Remove the wire attachment fittings and cut the post at the base (250mm from the top). 2. Attach the post connection member (only bolted). 3. Install the raised post and reattach the removed wire attachment fittings. *For more details, please refer to the PDF document or feel free to contact us.

  • image_02.jpg
  • image_04.jpg
  • image_03.jpg
  • Rockfall prevention agent
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shizuoka Prefecture construction case study: Reinforcement method for existing rockfall protection fences - Noise control measures during demolition!

Noise, dust, and high alkaline water treatment measures during demolition are not required. It is a simple construction method.

Here is a case study of the "Stronger Method" implemented in Shizuoka Prefecture. As a result of the construction, the fence height increased from 1.5m to 2.0m, with a construction length of L = 30.0m. This method connects the tops of the posts with steel rods, allowing the load that was previously supported by a single span to be distributed across multiple spans. Additionally, in areas where there are concerns about insufficient fence height, height-raising materials can be used to increase the fence height. [Case Study] ■Height-raising type (Fence height: H = 1.5 → 2.0m, Construction length: L = 30.0m) ■Shizuoka Prefecture (Construction: Fiscal Year 2018) *For more details, please refer to the PDF document or feel free to contact us.

  • Protective fence
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

NETIS registered - Repair work for access prevention fence 'DON'T DIG method'

Renewal of the old access prevention fence! Utilizing existing posts, reducing construction time by over 50%.

The "DON'T DIG Method" allows for the installation of new poles without excavation by cutting and reusing part of the existing poles. It can be installed without being affected by the roots of trees and other vegetation in mountainous areas, and it does not generate industrial waste. It accommodates various pole shapes and does not require archaeological surveys for buried cultural properties. Additionally, since no digging is involved, it does not damage buried cables. 【Features】 ■ Utilizes existing poles for construction ■ Shorter construction period due to no excavation ■ No industrial waste generated ■ Not affected by the roots of trees and other vegetation ■ Compatible with various pole shapes *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Twin Ray Method

Twin Ray Method

A hybrid pavement construction method called Twin Ray Method, which combines two types of asphalt mixtures with different properties to create a two-layer structure that maximizes the functionality of each layer. 【Features】 ○ Utilizes Multi Asphalt Paver (MAP) that allows for simultaneous construction of two layers. ○ Characterized by cost reduction through efficient paving, integration of structure, and thinning of the constituent layers. ○ Representative examples of this method include the Permi Twin Method, Thin Layer Permi Pavement Method, New Wabbit Method, and Color Pavement Twin Ray Method. ● For other functions and details, please contact us.

  • Dam construction
  • Paving of sidewalks, roads, parking lots and stadiums
  • Pavement construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pavement Refresh Repair Method "CAM Seal NEO"

It is possible to fill in the depressions in the damaged pavement and refresh the surface.

CAM Seal NEO is a mortar-like material composed of cement and asphalt emulsion, used as a repair method to fill depressions in deteriorated pavement surfaces and refresh them. CAM Seal NEO is a room temperature curing type that is highly safe, and after curing, it offers a more aesthetically pleasing appearance and greater wear resistance compared to conventional products. 【Features】 - Fills depressions in rough pavement and refreshes the surface. - The material cures at room temperature, ensuring high safety during handling. - Can be easily applied without the need for specialized tools, using a hand mixer and rubber rake. - Offers a more attractive appearance and greater wear resistance after application compared to traditional cement-based repair materials. For more details, please contact us or download the catalog.

  • Reinforcement and repair materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Asphalt solvent-based bridge deck paving adhesive "Civil Star"

Special solvent-based adhesive with excellent adhesion and elasticity.

Civil Star is a solvent-based adhesive developed for steel and concrete floor slabs, made by mixing special rubber and special resins.

  • Paving of sidewalks, roads, parking lots and stadiums
  • Paving Materials
  • Bridge Materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Unit house | Rental use OK! Authentic design & fast construction

Design and quality for "limited-time architecture" with features like full glass and wood-patterned louvers.

Our company offers a "unit house" that pursues design and comfort, which is difficult to achieve with conventional unit houses and prefabs. You can easily use it for rent, and we provide a variety of options such as "full glass" and "wooden louver panels," enabling us to respond to urgent needs with fast construction! It is ideal for various spaces that prioritize comfort and design, such as event facilities, residential sales offices, temporary offices or stores during reconstruction periods, while being used temporarily. Of course, we also support building confirmation applications. 【Features】 ■ Bright white color walls (exterior and interior) ■ Rentable FIX front glass ■ A wide range of options that can be freely combined ■ Standard equipment includes parapets, base covers, and downspouts for a clean appearance ■ Achieves an open space with a ceiling height of 2.34m (high type is 2.69m) ■ Super-fast construction produced in a factory and installed on-site *For other functions and details, please contact us.

  • Prefab
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Road Plus (Extended Lane)

Simple Expansion Method for Road Widening

This is a simple cantilever road widening method aimed at small-scale road widening of approximately 1.5 meters in narrow sections of roads in mountainous areas.

  • Dam construction
  • Airport facilities
  • Civil Engineering CAD
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Wide Wall Method (Roadway Widening Method)

Road widening method completed simultaneously with block stacking.

This technology allows for an approximately 2-meter widening by being constructed in the same manner as conventional large block retaining walls, and it enables a lower wall height compared to traditional methods when widening roads in steep terrain. Additionally, it reduces the amount of excavation needed, making it environmentally friendly and promising cost reductions. Received the 11th National Land Technology Development Award in FY 2009 [Regional Contribution Technology Award].

  • Dam construction
  • Retaining wall
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Total Cost Reduction Method "Sun K Clear Method"

Labor-saving, effort-saving, shortened construction period, and easy installation! Ideal for improving the work environment on-site.

The total cost reduction method "Sun K Clear Method" allows for the installation of precast products by adjusting the height with a jack and then floating the main body above the foundation using pre-installed "Raku Pita (height-fixing bolts)." Concrete is then filled into the gap, integrating the retaining wall with the base. This method enables the construction of a robust retaining wall while improving the working environment on-site, reducing installation time, and achieving labor and effort savings, resulting in a total cost reduction. 【Features】 ○ Easy installation ○ Safe construction ○ Complete integration ○ Reduced installation time, labor, and effort ○ Improved installation accuracy For more details, please contact us or download the catalog.

  • Airport facilities
  • River construction
  • Retaining wall
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Takagi Support-Free Planting Method

This is a planting method suitable for tall trees.

■This construction method is an underground support method for trees using anchor piles. ■It is ideal for places that prioritize aesthetics, such as golf courses and stadiums, or where it is inconvenient to install supports in narrow spaces. ■It effectively supports tall trees by utilizing eccentric forces. ■It is patented. (Patent No. 3383934)

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sediment control dam wall construction method (dam wall)

It is possible to construct a dam that matches the natural landscape by applying stone planting and decorative elements to the front of the sediment control dam block.

We would like to introduce our "Sabo Dam Wall Method (Dam Wall)." All 15 types of vertical-type Sabo dam blocks, ranging from 0.5 to 0.7 (in 0.05 increments), are self-supporting, which ensures high stability during construction and makes the work easier. Additionally, even when the slopes of the front and back of the dam differ (for example, a front slope of 2 and a back slope of 5), the design ensures that the vertical height of one layer of Sabo dam blocks is consistently 1.5 meters, allowing for a concrete placement height of 1.5 meters for the embankment. 【Features】 ■ Self-supporting precast blocks ■ Custom-designed for each slope ■ Does not compromise aesthetics ■ Excellent cost-effectiveness *For more details, please refer to the PDF materials or feel free to contact us.

  • Retaining wall
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BSB Block Sediment Control Dam Construction Method

By reducing material costs and decreasing the amount of leftover soil, it is possible to reduce transportation and disposal costs, leading to a reduction in construction costs!

We would like to introduce our "BSB Block Erosion Control Dam Construction Method." By using excavated soil and locally generated soil around the construction site as structural materials, we can reduce the amount of leftover soil disposal, allowing for a decrease in transportation and disposal costs. Additionally, all materials used, including cement and locally generated soil, can be utilized as long as they meet the required quality after mixing. 【Features】 ■ Reduction of leftover soil disposal ■ Cost reduction ■ Relaxation of construction conditions ■ Contribution to a resource-recycling company ■ Improvement of safety ■ Adoption of external protective materials *For more details, please refer to the PDF document or feel free to contact us.

  • Retaining wall
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

PC Well Method

PC Well Method

The PC well method involves stacking cylindrical single blocks at the construction site while introducing prestress using a post-tensioning method. The interior is excavated using various excavation machines such as hammer grabs, and ground anchors are driven and installed to a specified depth as a reaction force. The single blocks are equipped with PC copper rods, rebar placement holes, grout injection ports, and anchor plates, designed to standardize work at the construction site. The excavation methods include in-bucket excavation with hammer grab buckets and undercutting with widening excavators, making it suitable for a wide range of soil types. There are two types of PC wells: PC structure and PPRC structure. Features of the method: 1. It uses factory-manufactured precast components, ensuring thorough quality control, making it a highly reliable method. 2. Construction management is easy. 3. Since it is installed using a jacking method, it has minimal impact on the surrounding ground and is suitable for close-proximity construction. 4. It allows for low vibration, low noise, and high safety during construction. 5. It does not require temporary closures or island construction even for underwater work. 6. The construction accuracy is excellent. 7. The construction period can be shortened.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Coastal protection works using stone net method

Coastal protection works using stone net method

The irregular stone structure is permeable and preserves the ecosystem of aquatic plants and animals. 【Features】 ○ The installation area of the stone products is large at 4 square meters (standard), making it easy to work with. ○ The flexible structure of the wire mesh accommodates changes in slope and natural curves. ● For other functions and details, please contact us.

  • Airport facilities
  • River construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Coastal protection works - Stone net method

Coastal protection works - Stone net method

This is a method that integrates a special basket mat and stone net. 【Features】 ○ Used for riverbank stabilization, bed protection, and embankment works in rivers with high flow force. ○ Using natural stones or contact materials for infill can also contribute to water quality purification. ● For other functions and details, please contact us.

  • Airport facilities
  • River construction
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Foundation work Top Base method

Foundation work Top Base Method

The Top Base Method has many features that are not found in other methods. The principle of the great "Stone Method" established by the battlefield demonstrates excellent effects on the current foundations of civil engineering and architecture by using "my own spinning top." In addition to ground reinforcement, it has many advantages such as excellent economy and workability, high reliability, and can be widely utilized in various foundation works. 【Features】 ○ Safely supports superimposed loads even on extremely weak ground ○ Reduces settlement and prevents differential settlement ● For other functions and details, please contact us.

  • Steel structure construction
  • Foundation construction
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration