Slope disaster prevention method - Glass frame method
Effectively eliminate groundwater that induces landslides - Large-diameter drainage horizontal hole method.
The glass frame construction method allows for reliable and smooth installation even on steep slopes that were previously difficult. There are no concerns about water absorption or corrosion, so it can be easily installed in areas with fluctuating water levels while maintaining strength over the long term. It is highly durable and lightweight. It flexibly adapts to front greening methods that harmonize with natural slopes. For more details, please download the catalog or contact us.
- Company:興和 本社
- Price:Other