Ground anchor construction KTB anchor method
The KTB anchor method uses a screw-type anchor head for anchoring each strand after "wedge" anchoring, and further anchors it using a ring nut method with the screw-type anchor head, eliminating set loss and enhancing the tightening effect. 【Features】 ○ The KTB anchoring method is a wedge and nut anchoring system, which eliminates losses, allows for free re-tensioning, and enables flexible adjustment of the strand length and number on-site. ○ The tensioning materials used in this method, <SC strand> and <SC unbonded> (fully coated PC steel wire), are materials that significantly enhance the corrosion resistance performance against various corrosive environments for PC steel wire. ● For other functions and details, please contact us.
Inquire About This Product
basic information
The KTB anchor method uses a screw-type anchor head for anchoring each strand with a "wedge" fixation, followed by further fixation using a ring nut method with the screw-type anchor head, eliminating set loss and enhancing the tightening effect. 【Features】 ○ The KTB anchoring method utilizes wedge and nut fixation, which eliminates loss, allows for free re-tensioning, and enables flexible adjustment of the strand length and number on-site. ○ The tensioning materials used in the method, <SC strand> and <SC unbonded> (fully coated PC steel wire), are materials that significantly enhance the corrosion resistance performance against various corrosive environments for PC steel wire. ● For other functions and details, please contact us.
Price information
-
Delivery Time
Applications/Examples of results
【Purpose】 ○ Slope protection work
Company information
Mito Green Service Co., Ltd. contributes to the local community through "the restoration of nature," "coexistence with nature," and "the realization of a sustainable society," supporting the creation of a life that is "healthy," "comfortable," and "peaceful."






![Ground reinforcement work [Performance certification method] Cross-wing column method](https://image.www.ipros.com/public/product/image/321794/IPROS4293062677374440758.png?w=280&h=280)
![Ground reinforcement construction [Performance certification method] Pure pile method](https://image.www.ipros.com/public/product/image/321794/IPROS13021923202802504447.png?w=280&h=280)
![Ground reinforcement construction [Performance certification method] DM method](https://image.www.ipros.com/public/product/image/321794/IPROS7365441545588568100.png?w=280&h=280)
![Ground reinforcement work [Performance certification method] Σ-i method](https://image.www.ipros.com/public/product/image/321794/IPROS17689074750660876182.png?w=280&h=280)
![Ground reinforcement construction [Performance certification method] RES-P method](https://image.www.ipros.com/public/product/image/321794/IPROS6263428337976322716.png?w=280&h=280)