SC Drainage Method (for BRT Tunnel)
The packing material is elastic, allowing for fine height adjustments with anchor bolts!
The "SC Drain Method" is a falling prevention construction method that has a freeze prevention function. The construction process consists of three steps: anchor installation → resin injection → anchor installation. It is lightweight and has an appropriate level of flexibility, making it easy to install on tunnel lining surfaces. Additionally, a hollow board made of polypropylene is used as the base material. It has freeze prevention effects and can also be utilized for ice column measures within tunnels. 【Features】 ■ Lightweight with appropriate flexibility ■ Can be cut and processed on-site ■ Allows for fine height adjustments ■ Has freeze prevention effects ■ Alkali resistance *For more details, please refer to the PDF materials or feel free to contact us.
- Company:宇部エクシモ 本社
- Price:Other