Construction method Product List and Ranking from 1586 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Jun 10, 2026~Jul 07, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jun 10, 2026~Jul 07, 2026
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. シーカ・ジャパン Tokyo//Building materials, supplies and fixtures manufacturers
  3. 大建工業 Tokyo//Building materials, supplies and fixtures manufacturers
  4. 4 エコ・24 本社 Kanagawa//Other construction industries
  5. 5 昭石化工 Tokyo//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Jun 10, 2026~Jul 07, 2026
This ranking is based on the number of page views on our site.

  1. 煙突に対するアスベスト封じ込め工法『CAS工法』 エコ・24 本社
  2. Install the valve without stopping the water! 'EM Continuous Water Valve Method' SUIKEN Co., LTD
  3. D-Lite D Board Method ~ 3M × DAIKEN ~ 大建工業
  4. 4 For deep excavation work and cutting/removal of underground obstacles! Super Top Method. Taiyo Kisokogyo Co.,Ltd.
  5. 5 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック

Construction method Product List

1711~1740 item / All 4306 items

Displayed results

H-type PC pile

Wall materials for retaining structures using precast PC components that do not require temporary earth retention.

The "H-type PC pile" is a prestressed concrete member with an H-shaped cross-section manufactured in a factory, and it is a construction method for building retaining walls by continuous driving using a three-point pile driver. During construction, it is used as a temporary retaining wall, and during the permanent phase, it is used as the completed structure. The cross-sectional dimensions are available in three types: width 1070(mm) × height 540, 640, 740(mm), and the design standard strength of the concrete is 70(N/mm²). 【Features】 ■ No need for temporary retaining walls ■ Self-supporting wall heights of up to approximately 8.5(m) are possible ■ Rigid connection with base and top slabs is possible ■ Leakage suppression effect for groundwater and other water ■ Drainage effect for rainwater and other sources ■ Low noise and low vibration construction method ■ Shortened construction period on site *For more details, please refer to the PDF materials or feel free to contact us.

  • スライド9.JPG
  • スライド11.JPG
  • スライド12.JPG
  • スライド13.JPG
  • スライド14.JPG
  • スライド15.JPG
  • 施工方法.jpg
  • DSCF0652.JPG
  • Retaining wall
  • Civil Engineering Method
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Earth Drill Expansion Pile (newACE) Method

new ACE method

This is a method of pile foundation construction known as the expansion resistance pile method, which improves the vertical load-bearing capacity of piles by excavating the expansion resistance section in a frustum shape using a newACE bucket. An earth drill machine is used for the excavation. 【Features】 ● The excavation method for the shaft section can be selected based on the ground conditions (earth drill, all-casing, reverse). ● Expansion of up to 4.8 meters is possible, with a maximum effective expansion ratio of 4.62. ● Concrete with a maximum design strength of Fc 80 N/mm² can be used. ● Two scrapers ensure accurate measurement of the hole wall. ● The inclination angle of the expansion resistance section is consistently maintained at 12°. *For more details, please refer to the PDF document or feel free to contact us.

  • アースドリル2.jpg
  • アースドリル3.jpg
  • Foundation construction machinery
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shot Blast "T-Type"

Efficient processing of small and medium-sized items! Introducing Hidaka Industry's shot blasting.

We would like to introduce our shot blast machine, the "T-type." The tumbler blaster is a machine suitable for efficiently processing small and medium-sized items. The workpieces are loaded into the barrel of the endless rubber conveyor inside the machine, where they are continuously flipped due to its rotation. At the same time, they receive the projection of abrasive material from the rotor (projection device) installed on the top, allowing for blast cleaning of the entire surface in a short amount of time. *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shot Blast "J Type"

We introduce a device that allows for surface processing while providing rotation and rolling!

We would like to introduce our shot blast machine, model 'J'. This device allows for full surface processing while providing both rotation and rolling. Generally, rotation alone is sufficient, but for complex-shaped workpieces, a rolling device can be added as an option. *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Tekot pile method

Reassessing steel materials to enable low costs! A construction method certified by the Minister of Land, Infrastructure, Transport and Tourism that employs slide weight testing.

The "Tecot Pile Method" is a technology that utilizes a steel pipe with notches, to which two semicircular steel plates and a drilling blade are welded. By rotating this assembly, it penetrates the ground and is used as a pile. It is suitable for both sandy soil (including gravelly soil) and clayey soil. It meets all the needs of pile foundation construction, achieving low cost, effective construction management, and high quality. 【Features】 ■ Enhanced construction management ■ Low cost ■ Reliability ■ Wide range of support layers ■ Space-saving *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Gaia Pile Method

The unique shape of the pile tip provides great bearing capacity! It enables economical pile design.

The "Gaia Pile Method" is a foundation pile technology certified by the Minister of Land, Infrastructure, Transport and Tourism, characterized by minimal penetration capability, high installation accuracy, and minimal pile core deviation, as well as no wing deformation, ensuring high construction precision. It is a rotary driven steel pipe pile with two semicircular wings and a triangular excavation blade attached to the tip of a thin steel pipe, capable of meeting a wide range of needs. Additionally, since no plant equipment is required, it allows for extremely space-efficient construction. The pile materials can be transported by small trucks (2t to 4t), contributing to environmental protection around the construction site. 【Features】 ■ Achieves pile installation without residual soil ■ Completely eliminates the generation of residual soil by not using any industrial waste ■ Exhibits great bearing capacity due to its unique pile tip shape, allowing for economical pile design ■ Low noise and low vibration ■ Suitable for pile installation in urban areas, densely populated residential areas, and inside buildings *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Non-drainage, additive-free VOC pollution control: Iron powder cartridge method

A small and simple device that purifies high-concentration contamination on-site! It can be applied for full area purification, partial purification, and runoff prevention.

The "Iron Powder Cartridge Method" is a technique suitable for VOC pollution control without drainage and additives. By installing the iron powder cartridge in a well and operating it, VOCs are decomposed by the action of the purifying iron powder, effectively addressing high concentrations of contamination. Additionally, there are no additives introduced into the groundwater, and ground subsidence does not occur. 【Features】 ■ Install and operate the iron powder cartridge in the well ■ Decompose VOCs using the purifying iron powder, effective for high concentrations of contamination ■ Gradually purify the surrounding area by circulating groundwater underground ■ Deploy multiple cartridges according to the spread of contamination ■ VOCs are decomposed underground with no impact on the surface *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Existing waterway repair and reinforcement method "Panel Lining Method"

Repair and reinforcement method for existing waterways using resin concrete panels.

The "Panel Lining Method" is a technique that utilizes high-smoothness, wear-resistant resin concrete panels as surface covering materials on the inner surfaces of existing waterway structures, without demolishing the existing structures. This method effectively utilizes existing facilities in combination with reinforcement materials. Resin concrete panels are lightweight, easy to install manually, and allow for fast construction, as well as partial repairs. Due to their long service life, they are also cost-effective in terms of lifecycle costs. 【Method Features】 ■ Easy manual installation ■ Fast construction speed and capability for partial repairs ■ Can be produced with arbitrary curvature, resulting in minimal cross-sectional loss after covering ■ Can maintain the previous water flow rate *For more details, please download the PDF or contact us.

  • Renovation and repair methods
  • Earthquake-resistant construction method
  • Reinforcement and repair materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Waterway structure repair and reinforcement method "SR Joint Method"

Repair and reinforcement methods for waterway structures such as open channels and tunnels!

The "SR Joint Method" is a technique for repairing and reinforcing waterway structures. Since it uses adhesive fixation instead of anchor fixation, it does not damage the concrete itself. Additionally, due to its excellent flexibility, it can accommodate significant movements. 【Features】 ■ Does not damage the concrete itself due to adhesive fixation ■ Excellent flexibility ■ Accommodates significant movements ■ Joint movements can adapt to shear direction joints ■ Superior weather resistance, water resistance, and chemical resistance, etc. *For more details, please download the PDF or contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Columnar Ground Improvement "SST Method"

The columnar ground improvement technology "SST method," which enables powerful compaction in the horizontal direction, achieves overwhelming high strength, high load-bearing capacity, and cost reduction.

The SST method is based on the principle of "eliminating voids and water between soil particles to increase density and strength." Unlike conventional in-situ mixing methods, it involves excavating soil and discharging it above ground, where solidifying agents and additional sand are mixed to "combine particles of different diameters." This improved soil is then filled into the excavation hole while being "compressed and compacted with strong force" using a newly developed auger, which binds soil particles together with needle-like crystals of the solidifying agent to construct a robust column. Since the construction is visually monitored on-site, it ensures a uniform and continuous high quality. Additionally, the method allows for powerful compaction not only in the vertical direction but also horizontally, enabling the construction of columns that exhibit high strength and bearing capacity of 2,400 kN/m² as per design standards. Furthermore, the surrounding ground is also compacted strongly, significantly enhancing the overall bearing capacity of the foundation. As a result, the number of columns can be reduced, and since very little excavated soil is generated, the use of large construction machinery, water, and electricity is minimized, greatly improving the applicability and workability on-site and reducing costs. Moreover, due to the immediate development of considerable strength from compaction, the curing period for the solidifying agent is almost unnecessary, leading to a shortened construction period.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Information] Liquefaction countermeasures using the SST method

We introduce the causes of liquefaction, SST liquefaction countermeasures, and physical principles!

This document introduces liquefaction countermeasures using the SST method. Research and development of countermeasures for liquefaction has a relatively short history, beginning at the national level after the Niigata earthquake in 1964, which caused the collapse of buildings due to liquefaction. By converting the numerous pieces of information obtained from the liquefaction damage during the Great East Japan Earthquake on March 11 into empirical values, we believe that it is possible to select liquefaction countermeasure methods that consider "cost-effectiveness." This document was created to introduce liquefaction countermeasures using the SST method. [Contents (partial)] ■ Introduction ■ Liquefaction phenomenon ■ Causes of liquefaction ■ Problems caused by liquefaction ■ Soil layers at risk of liquefaction *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Asbestos removal work negative pressure monitoring device "PL10 Room Inspector"

Easy operation! Contributing to the prevention of asbestos dispersion with high-precision differential pressure sensors and measurement technology. Leave the rental of construction equipment to us!

The "PL10 Room Inspector" is a device that monitors the micro-pressure of negative pressure rooms, such as isolation rooms for the removal of asbestos and dioxins, which do not allow internal air to leak outside. It operates on batteries and accurately monitors minute differential pressure, alerting users to abnormal negative pressure in the room with flashing lights and a buzzer sound. Additionally, it stores indoor pressure data, allowing for easy trend graph display and record storage on a computer. 【Features】 ■ Accurately measures minute negative pressure indoors ■ Reduces the impact of noise from wind and other sources ■ Long battery life due to energy-efficient design ■ Peace of mind with both internal negative pressure alarms and wireless remote alarms ■ Easy record storage on a computer ■ Convenient trunk case for standing and portability of the monitor *For more details, please refer to the PDF document or feel free to contact us.

  • Other security systems
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rock bed circular hole excavation method "Percussion method"

Excavation in rock formations or narrow spaces in a short time! Please make use of it for foundation work for various types of poles.

We would like to introduce the "Percussion Method," a rock drilling method for pole installation work. This method allows for excavation in difficult ground conditions such as bedrock, boulders, and cobbles, without collapsing the surrounding ground. The excavation performance is as follows: for a drilling diameter of φ460mm, the maximum excavation depth is 6000mm, and for a drilling diameter of φ610mm, the maximum excavation depth is 5000mm. Please utilize this method for various pole foundation works. 【Excavation Performance】 ■ Drilling Diameter φ460mm - Maximum Excavation Depth: 6000mm ■ Drilling Diameter φ610mm - Maximum Excavation Depth: 5000mm *For more details, please download the PDF or feel free to contact us.

  • 1.PNG
  • 2.PNG
  • 3.PNG
  • 4.PNG
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP support method (FRP seismic lining)

No need for branch pipe cutting, no need for indoor construction methods!

Our company has independently developed technology related to the rehabilitation of water supply and drainage pipes, and we propose suitable construction methods based on the type and condition of the pipes. If you are a building or apartment owner, or a management company concerned about the aging or issues with the building's water supply and drainage facilities, please feel free to consult us. 【Features】 ■ 20-year warranty because we are confident in our drainage pipe rehabilitation ■ Unlike painting methods, we can rehabilitate even old pipes with holes into double-walled pipes ■ Over 40 years of durability ■ Forms epoxy FRP pipes that are several times stronger than PVC pipes ■ Both main pipes and branch pipe junctions are finished with FRP, allowing rehabilitation without cutting the branch pipe junctions ■ In addition to three layers of FRP, we apply a urethane hose for added processing *For more details, please download the PDF or contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Precast concrete method for revetment construction

Orderable according to the conditions of the construction site! This is a highly reliable revetment product with numerous achievements.

The "Precast Concrete Method for Revetted Shoreline Construction" is a widely used technology recognized as a standard type of shoreline construction. The products can be installed using a truck crane, allowing for mechanized construction. This reduces the labor involved, helping to alleviate labor shortages. Additionally, the rationalization and labor-saving aspects of the construction lead to shortened construction periods, improved efficiency, and cost savings. 【Features】 ■ Extensive track record and high reliability ■ Products can be installed with a truck crane, enabling mechanized construction ■ Reduces labor involved, helping to alleviate labor shortages ■ Achieves shortened construction periods, improved efficiency, and cost savings ■ Dimensions of components can be ordered according to the conditions of the construction site *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Evostone method

The Evostone method achieves simple and stable paving performance.

We propose the "Evostone Method," a paving technique using natural stone, concrete slabs, and brick paving with guide rails. The "guide rails" support various load points over a surface, making it suitable for paving methods on roadways and access points. Additionally, by laying the paving materials on plastic "guide rails," we simplify the construction process, reduce construction time, and eliminate the need for curing periods. 【Features】 ■ Compatible with vehicle traffic, suitable for roadway construction ■ Ensures smoothness of the construction surface, contributing to safe paving ■ Excellent safety of the pavement, with no subsidence, rattling, or movement of the paving stones ■ Dry construction method allows rainwater to be returned underground ■ Capable of using larger-sized paving stones compared to small stone wet methods, etc. *For more details, please download the PDF or contact us.

  • Paving Materials
  • Paving of sidewalks, roads, parking lots and stadiums
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Protective agent "WATER SHIELD"

The curing time after application is only 2 hours! A protective agent that does not allow water intrusion.

"WATER SHIELD" is primarily composed of silane-siloxane and forms a water-repellent layer on the surface of concrete, protecting the surface of concrete structures by preventing the intrusion of moisture and chloride ions from the outside. The formation of the water-repellent layer is completed with just 2 hours of curing after application. This shortens the curing time after application, making process management easier. Additionally, the likelihood of reapplication due to the leaching of the impregnating agent during sudden heavy rainfall is reduced. 【Features】 ■ Curing time after application is only 2 hours ■ Does not freeze even at -40°C ■ A colored type for application certification is also available *For more details, please download the PDF or feel free to contact us.

  • Slope protection material
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Tile clip method "NC Fix Plus"

Tile clip method to prevent height differences between tiles!

We offer the tile clip method "NC Fix Plus," which uses a construction aid tool called "Spacer Clip" to adjust the height and joint width when installing ceramic tiles and stone materials. With "NC Fix Plus," you can prevent unevenness between tiles simply by inserting and tightening a wedge into the "Spacer Clip" using a dedicated pliers. The "Spacer Clip" and "Wedge" can be easily removed with a rubber hammer or similar tool after the adhesive has cured. 【Tools Used】 ■ Spacer Clip ■ Wedge *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

NC coupling system

By isolating the movements of stone, tile, metal substrates, and base materials (structural framework), you can ensure safety during earthquakes and strong winds!

The "NC Joint System" is a construction method that uses perforated metal (stainless steel or ZAM) as a base to attach finishing materials such as stone and tiles. By mechanically intertwining the adhesive with the base, the stone or tile, adhesive, and perforated metal become integrated, allowing for stable strength over a long period. Additionally, to accommodate the deformation of the building and the behavior of the substrate, the base material is fixed with loose holes, achieving high seismic performance. 【Features】 ■ Freedom to choose finishing materials such as stone, tile, and flat-backed bricks ■ Compatible with ALC and extruded cement boards, which were previously restricted ■ Suitable for renovation as it can be installed without removing existing exterior walls ■ Minimal waste ■ High durability achieved by using punched stainless steel and new steel plates (ZAM) *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Earthquake-resistant construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

High Friction Pile Method with Winged Steel Pipe "ATT Column(R)"

A high-friction pile method with wings applicable to architectural and civil engineering structures!

The "ATT Column (R)" is a high-friction winged steel pipe pile method that incorporates winged steel pipe piles embedded within a columnar improvement body, providing significant frictional force and high toughness. In the construction field, it has obtained ministerial certification (driven bearing capacity) and evaluation from the General Incorporated Foundation Better Living (pull-out bearing capacity). In the civil engineering field, it has received technical evaluation from the Japan Society of Civil Engineers. 【Features】 ■ Achieves large surface frictional force ■ Achieves large horizontal bearing capacity ■ Environmentally considerate construction method ■ Usable in narrow spaces *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Steel Pipe Soil Cement Pile Method "Gantetsu Pile(R)"

A steel pipe soil-cement pile method that offers better construction efficiency compared to conventional methods and contributes to shortening construction periods!

The "Gantetsu Pile (R)" is a steel pipe soil-cement pile method that involves injecting cement milk while mixing and solidifying the in-situ soil to create a solidified body (soil-cement column) in which a steel pipe pile with protrusions on its outer surface is driven into the center. It is documented as a steel pipe soil-cement pile in road bridge guidelines and railway design standards, and has been publicly evaluated. 【Features】 ■ High load-bearing composite pile that supports with fewer units ■ Hybrid pile that utilizes the characteristics of steel pipes and soil-cement ■ Environmentally friendly pile ■ Contributes to shortening construction periods *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Advanced Enlarged Tip Foundation Steel Pipe Pile Method 'TN-X'

Advanced expansion and foundation steel pipe pile method certified by the Minister of Land, Infrastructure, Transport and Tourism in 2005!

The "TN-X" method is a high-support steel pipe pile construction technique that achieves significant bearing capacity by constructing a maximum 2,400mm base stabilization bulb at the tip of the pile using a hydraulic expansion and contraction drilling head. It is primarily used in important structural buildings such as large logistics warehouses, government buildings, hospitals, and airport facilities that require high pile capacity. 【Features】 ■ Exhibits high bearing capacity ■ Demonstrates excellent seismic performance with steel pipe piles ■ Adopts a middle excavation method that allows for long construction lengths ■ A method that generates minimal residual soil ■ Achieves thorough quality control *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Tenokoramu Method "High Strength, Low Residual Soil Deep Mixing Treatment Method"

A trusted construction method boasting over 30,000 achievements! In addition to building foundation structures, we can also address retaining walls, uneven settlement prevention, liquefaction, and arc sliding measures!

The Tenokoramu method is a technique that solidifies the ground into column shapes using solidifying materials. It boasts over 30,000 achievements (excluding single-family homes) and has received high praise for its quality. 【Features】 ■ It constructs high-quality columns. With the Tenoblade (anti-rotation wing), it effectively stirs and mixes the soil, allowing for the creation of columns with uniform strength regardless of soil type. ■ It meets a wide range of needs with a diverse lineup. The column diameters that can be manufactured range from 400mm to 2600mm (with technical review certification obtained). Construction machinery is available from 8-ton to 135-ton classes, allowing for selection based on construction specifications and site conditions. ■ A reliable construction management system (Super System). During the column construction process, the number of mixing cycles of the excavation and mixing head, the amount of solidifying material added, and the workload are managed in real-time, achieving reduced cement usage, shortened construction periods, and cost savings. *For more details, please download the PDF or feel free to contact us.

  • Pile and foundation work
  • Ground foundation construction method
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pure Pile: Pile Foundation Reinforcement Method for Detached Houses

Without loosening the ground, fast and reliable construction is possible! Suitable for foundations of single-family homes and small-scale structures.

"Pure Pile" is a ground reinforcement method that constructs high-quality cement milk columns underground without soil contamination by pulling out a rod while discharging cement milk. Unlike ground improvement methods that mix soil and cement milk, it allows for the construction of high-strength and high-quality columns even in humus and clay layers. We have over 50,000 construction achievements, primarily for single-family homes. 【Features】 ■ Does not depend on soil type ■ Easy construction management ■ Minimal residual soil ■ Cost-effective method *For more details, please refer to the PDF document or feel free to contact us.

  • Pile and foundation work
  • Residential foundations
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Quail brand black varnish

When dry, it has good adhesion to metals and wood! It forms a durable, glossy black coating.

Black varnish is a black paint made primarily from materials such as gilsonite and petroleum asphalt, dissolved in a solvent using an appropriate method. When dried, it forms a glossy black coating with excellent adhesion to metals and wood, and outstanding durability. It can be used for anti-corrosion coatings on cast products, rust-proof coatings on various metal products such as chassis, as well as for coloring or enhancing the water resistance of wood. 【Features】 ■ Main raw materials include gilsonite and petroleum asphalt ■ Good adhesion to metals and wood when dried ■ Forms a glossy black coating with excellent durability ■ Can be transferred to another container and adjusted to the appropriate viscosity with thinner *For more details, please refer to the PDF document or feel free to contact us.

  • paint
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Product Catalog: Guardian Seismic Retrofit Method "Post-Installed Hardware"

A lineup of products that contribute to reducing the risk of collapse during an earthquake!

This catalog features the Guardian seismic retrofitting method "Post-Installed Hardware" developed by the Housing Structure Research Institute, which is based on verification and demonstration of seismic-resistant hardware, seismic walls, and vibration control walls. We introduce products such as the "Post-Installed Holddown," which enhances safety against earthquakes with a significant load-bearing capacity not found in screw-installed hardware, and the "Post-Installed Anchor," which can be added in necessary locations to improve the seismic resistance of homes. [Contents Included] ■ Post-Installed Anchor ■ Post-Installed Holddown ■ Column Head and Base Connection Hardware ■ Joint Connection Hardware ■ Additional Column and Beam Hardware ■ Post-Installed Beam Support Hardware *For more details, please download the PDF or feel free to contact us.

  • Disaster prevention fittings
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Product Catalog: Guardian Vibration Control and Seismic Retrofit Method

We will create a safe home that protects lives even in the event of an earthquake.

This catalog features the reinforcement wall for renovations, "Guardian Vibration Control and Seismic Retrofit Method," handled by Housing Structure Research Institute Co., Ltd. We offer a lineup that responds to various renovation environments with the "Guardian Wall," a surface material seismic reinforcement wall, and the "Guardian Shield," a slim and sturdy reinforced seismic wall with bracing. [Featured Products] ■ Guardian Wall ■ Guardian Shield ■ Guardian Force Red 2 ■ Guardian Cool C2 *For more details, please download the PDF or feel free to contact us.

  • Earthquake-resistant construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Liquid glass coating agent for wood "FF Coat Hinoki" Hinoki wood renovation method

It enables the removal of astringency from white wood and maintenance preservation! Wood regeneration technology for hot spring facilities with antibacterial and antifungal effects.

FF Coat Hinoki" is a wood glass coating that exhibits excellent antibacterial, antifungal, and anti-dust mite effects. It safely protects wood with a glass film that has no impact on the human body. This product can also be used for cleaning and maintaining unpainted wood. In the application at the bathing facility "Fuku no Yu" (Taito Ward, Tokyo), by applying this product to the unpainted wood used in the bathing area, it effectively removed impurities and provided a beauty akin to that of new wood. 【Main Features】 ■ Antibacterial, antifungal, and dust mite repellent properties on wood surfaces ■ Scratch resistance for flooring (hard coat effect) ■ Slip resistance → Suitable for pets and other sliding situations ■ Excellent water repellency and pollution prevention → Prevents staining of wood from organic materials *Technical explanation materials are currently available as a gift! Please apply through "Contact Us.

  • Wood Preservative Paint
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Company Information (We can accommodate everything from small items to assembled products.)

We will respond to our customers' requests to turn their troubles into something good.

We will respond to our customers' troubles and turn them into satisfaction. For more details, please refer to the PDF download below. You can trust us with blasting and painting. Harada Ironworks Co., Ltd. TEL: 082-232-2445 FAX: 082-293-0286 Contact: Tao Mobile: 090-3742-9768 Email: bousei@harada-tekkou.co.jp Harada Ironworks Hiroshima Official Link

  • paint
  • Sign construction
  • Dam construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Welding: TIG Welding Edition

Welding is essential in the can manufacturing and assembly field. This time, I would like to introduce TIG welding.

Welding is essential in the can manufacturing and assembly field. This time, I would like to introduce TIG welding. For more details, please refer to the PDF download below. For anything related to blasting and painting, please leave it to us. Harada Iron Works Co., Ltd. TEL: 082-232-2445 FAX: 082-293-0286 Contact: Tao Mobile: 090-3742-9768 Email: bousei@harada-tekkou.co.jp Harada Iron Works Hiroshima Official Link

  • Rust Inhibitor
  • Special Construction Method
  • paint
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration