Introducing the features of our TNF method, which has reduced costs by approximately 30% compared to traditional pile foundations!
We would like to introduce the features of the "TNF Method," implemented by Yoshimitsu Corporation, which has over 1,300 achievements nationwide. In soft ground across the country, we perform ground improvement to create an artificial bedrock suitable for the building. Compared to conventional methods (pile foundations), we can achieve approximately 30% cost reduction (for a total floor area of 1,000 m² and pile length of 30 m). Please feel free to contact us when you need our services. 【Features】 - Compared to conventional methods, there is no need for pile work, formwork work, or ground preparation work, resulting in a 50% reduction in construction time (for a total floor area of 1,000 m² and pile length of 30 m). - Since no piles are used, the demolition costs during building dismantling are also reduced. *For more details, please refer to the related links or feel free to contact us.
Inquire About This Product
basic information
【Recommended for】 ■ Design offices ■ General contractors ■ Companies needing commercial stores or logistics warehouses ■ Clients planning factories, warehouses, or stores on weak ground requiring pile foundations *For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Purpose】 ■Alternative to pile foundations in construction *For more details, please refer to the related links or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
We have been in the construction business for over 100 years, based in Ishikawa Prefecture.