Ground improvement work in Fukushima Prefecture! Super Ruple Elneed method.
[NETIS Registration] Construction is OK even with a large amount of groundwater flow!
In cases where the groundwater level in the ground is high, the excavation hole may soon be filled with groundwater after the excavation begins. The Super Rappu Elneed method changes the excavation technique according to the groundwater inflow situation, thereby preventing excessive water inflow and reducing the risk of collapse of the excavation hole. Additionally, the water management method of the Elneed method involves measuring flow values using the cylinder method to manage the water volume. This management method allows for appropriate responses to changes in the moisture content of the soil used for improvement and the inflow of groundwater. We also introduce various case studies on pages from other prefectures.
- Company:エルニード協会
- Price:Other