iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      36255items
    • Facilities
      Facilities
      57897items
    • Lighting and Interior
      Lighting and Interior
      17467items
    • Common materials
      Common materials
      36866items
    • Civil Engineering Materials
      Civil Engineering Materials
      10193items
    • Construction, work and methods
      Construction, work and methods
      29250items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29659items
    • IT/Software
      IT/Software
      33755items
    • others
      others
      101442items
    • Store and facility supplies
      Store and facility supplies
      4655items
    • Office and commercial supplies
      Office and commercial supplies
      11974items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      1072items
    • Logistics Equipment
      Logistics Equipment
      7402items
    • Energy and Resources
      Energy and Resources
      12023items
  • Search for companies by industry

    • Information and Communications
      7300
    • others
      7275
    • Building materials, supplies and fixtures manufacturers
      6689
    • Service Industry
      4815
    • Trading company/Wholesale
      3120
    • Other construction industries
      2461
    • Electrical equipment construction business
      795
    • Construction Consultant
      680
    • General contractors and subcontractors
      676
    • Interior Design
      520
    • Housing manufacturers and construction companies
      502
    • Facility Design Office
      490
    • Architectural design office
      370
    • retail
      365
    • Warehousing and transport related industries
      338
    • Building Management
      320
    • Electricity, Gas and Water Industry
      287
    • Interior construction business
      284
    • Medical and Welfare
      278
    • Educational and Research Institutions
      257
    • Renovation and home construction industry
      232
    • Water supply and drainage construction business
      203
    • Transportation
      182
    • Real Estate Developers
      174
    • Fisheries, Agriculture and Forestry
      137
    • Structural Design Office
      65
    • Finance, securities and insurance
      41
    • Restaurants and accommodations
      34
    • self-employed
      31
    • Mining
      26
    • Public interest/special/independent administrative agency
      20
    • Police, Fire Department, Self-Defense Forces
      17
    • Property Owner
      9
    • Store and building owners
      9
    • Government
      9
    • Individual
      9
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Construction Consultant
  • General contractors and subcontractors
  • Interior Design
  • Housing manufacturers and construction companies
  • Facility Design Office
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Building Management
  • Electricity, Gas and Water Industry
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Property Owner
  • Store and building owners
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. ProductSearch
  3. Construction, work and methods
  4. Construction methods and technologies
  5. Ground foundation construction method
  6. Collection of Construction Achievements under Five Difficult Conditions | Elneed Method

Collection of Construction Achievements under Five Difficult Conditions | Elneed Method

  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

last updated:Jun 05, 2026

エルニード協会
エルニード協会
  • Special site
  • Official site

Selected for sites where other methods have been rejected. Approximately 4,000 cases of challenging construction achievements disclosed.

This document summarizes the construction achievements and technical foundations for five challenging conditions in ground improvement that design offices, construction companies, and general contractors often find difficult to address and may decline due to "strict conditions." 【The five challenging conditions included】 1. Sites with groundwater or spring water 2. Muddy or weak backfill ground 3. Ground mixed with large gravel, boulders, and rock masses 4. Ground with undulating support layers that are difficult to verify 5. Remote islands, mountainous areas, and sites with difficult access For each site, it specifically explains why other methods (column improvement, rubble, cast-in-place piles) are challenging and how the Elneed method can solve these issues with specific technologies, along with the regions where these achievements have been made. The overall picture of the ground improvement method, with a cumulative construction record of approximately 4,000 cases by the National Elneed Association, a reinforced concrete ratio of 36.2%, and a site test body strength ratio of 1.0 or higher, can be understood in 9 pages.

    Ground foundation construction method
スクリーンショット

Collection of Construction Achievements under Five Difficult Conditions | Elneed Method

スクリーンショット 2026-05-13 6.08.12.png
スクリーンショット 2026-05-13 6.08.12.png
  • Elneed Kyushu Co., Ltd. Official Website
  • Special site - Product/service details - https://pr.www.ipros.com/elknead/product/

Inquire About This Product

  • Contact Us Online

basic information

【Data Specifications】 ■ Number of Pages: 9 pages in total ■ Format: PDF ■ Target Audience: Design offices, construction companies, general contractors 【Contents】 - Introduction | Why is "Ability to Respond to Difficult Conditions" being questioned? - Difficult Condition 1: Groundwater and Spring Water (Water volume management based on flow rate × adjusted water content ratio) - Difficult Condition 2: Mud and Soft Ground (Advancing while stabilizing the footing with a general-purpose backhoe) - Difficult Condition 3: Large Boulders, Rolling Stones, and Rock Mass (Crushing and removing with an excavator, then immediately continuing construction) - Difficult Condition 4: Undulating Support Layers (Making the "invisible" "visible" through visual confirmation) - Difficult Condition 5: Remote Islands and Mountainous Areas (Only 4 pieces of equipment needed / No plant required)

Price information

The materials can be downloaded for free. We also offer free consultations and estimates regarding construction. Even at sites where you have been told "we cannot accommodate" using other methods, please feel free to consult with us first. We will provide answers regarding the feasibility of construction based on technical grounds.

Delivery Time

Please contact us for details

Applications/Examples of results

【Recommended for Such Sites】 ■ Sites with abundant groundwater and spring water  └ Proven track record in Beppu City and Hakone Town (hot spring areas with high groundwater levels) ■ Sites with muddy, weak backfill where heavy machinery sinks  └ Sites where poor backfill was discovered in "bare land delivery" properties ■ Sites mixed with large gravel, boulders, and rock masses  └ Proven track record in Yamaguchi City and Hiroshima City (scattered gravel layers and uneven bedrock) ■ Ground with undulating support layers that are difficult to verify  └ Sites where the risk of differential settlement needs to be reduced, and where excessive design should be avoided ■ Remote islands, mountainous areas, and sites with difficult access  └ Proven track record in more than three remote islands without regular shipping routes (including Ishigaki Island) 【Main Uses】 ・Foundation ground improvement for buildings ・Support ground improvement for civil engineering structures ・Alternative methods for sites deemed difficult to address with other methods ・Selection candidates during method comparison discussions with design offices

Company information

エルニード協会

エルニード協会

Other construction industries

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
  • Special site
  • Official site
Phone number/address

The Elneed Association handles the "Super Rappuru Basic Construction Method (Elneed Method)." This method uses stabilized soil created by mixing construction-generated soil with water and cement-based solidifying agents, and it is an improved version of the Rappuru concrete method for construction foundations. Our member companies are located from Tohoku to Kyushu, allowing us to respond to requests from all over the country. Please feel free to contact us when you need our services.

Product/Service List (110)

Popular products in related categories

Collection of Construction Achievements under Five Difficult Conditions | Elneed Method
Construction, work and methods
Collection of Construction Achievements under Five Difficult Conditions | Elneed Method
エルニード協会
[Column] What is the Elneed method that reduces quality, cost, and environmental impact?
Construction, work and methods
[Column] What is the Elneed method that reduces quality, cost, and environmental impact?
エルニード協会
[Column] The El Niño Method That Can Be Applied Even in Areas with Abundant Groundwater
Construction, work and methods
[Column] The El Niño Method That Can Be Applied Even in Areas with Abundant Groundwater
エルニード協会
[Column] Over 3,000 Achievements: Reasons Why the Elneed Method is Chosen
Construction, work and methods
[Column] Over 3,000 Achievements: Reasons Why the Elneed Method is Chosen
エルニード協会
[Column] The Option of "Solidifying" for Liquefaction Countermeasures — El Niño Method
Construction, work and methods
[Column] The Option of "Solidifying" for Liquefaction Countermeasures — El Niño Method
エルニード協会

Related New Products

Site Investigation | Optimization of Pile Length and Cost for Small Steel Frame Buildings through Data Comparison and Detailed Surveys
Surveys, Measurements, and Services
Site Investigation | Optimization of Pile Length and Cost for Small Steel Frame Buildings through Data Comparison and Detailed Surveys
ジオテック
Ground reinforcement work | Building environmentally friendly foundations using DM method with recycled materials.
Construction, work and methods
Ground reinforcement work | Building environmentally friendly foundations using DM method with recycled materials.
ジオテック
Ground reinforcement work | Optimizing the entire construction process with the DM method to achieve a shortened construction period.
Construction, work and methods
Ground reinforcement work | Optimizing the entire construction process with the DM method to achieve a shortened construction period.
ジオテック
Ground reinforcement work | Establishing a foundation design based on evidence using the DM method of GBRC performance certification.
Construction, work and methods
Ground reinforcement work | Establishing a foundation design based on evidence using the DM method of GBRC performance certification.
ジオテック
Ground reinforcement work | A reliable structure that prevents differential settlement accidents of buildings using the high-support capacity DM method.
Construction, work and methods
Ground reinforcement work | A reliable structure that prevents differential settlement accidents of buildings using the high-support capacity DM method.
ジオテック

The related categories of Ground foundation construction method

  • Construction, work and methods
  • Construction methods and technologies
  • Ground foundation construction method
Find products and companies by related keywords
  • #Construction method
  • #El Niño construction method
          

Inquire About This Product

  • Contact Us Online

Products

  • Search for Products

Company

  • Search for Companies

Special Features

  • Special Features

Ranking

  • Overall Products Ranking
  • Overall Company Ranking

support

  • site map
IPROS
  • privacy policy Regarding external transmission of information
  • terms of service
  • About Us
  • Careers
  • Advertising
IPROS Services
  • >IPROS GMS | Search site for the manufacturing industry
  • >IPROS | Search site for the B2B industry
COPYRIGHT © 2001-2026 IPROS CORPORATION ALL RIGHTS RESERVED.
Please note that the English text on this page is automatically translated and may contain inaccuracies.