Selected for sites where other methods have been rejected. Approximately 4,000 cases of challenging construction achievements disclosed.
This document summarizes the construction achievements and technical foundations for five challenging conditions in ground improvement that design offices, construction companies, and general contractors often find difficult to address and may decline due to "strict conditions." 【The five challenging conditions included】 1. Sites with groundwater or spring water 2. Muddy or weak backfill ground 3. Ground mixed with large gravel, boulders, and rock masses 4. Ground with undulating support layers that are difficult to verify 5. Remote islands, mountainous areas, and sites with difficult access For each site, it specifically explains why other methods (column improvement, rubble, cast-in-place piles) are challenging and how the Elneed method can solve these issues with specific technologies, along with the regions where these achievements have been made. The overall picture of the ground improvement method, with a cumulative construction record of approximately 4,000 cases by the National Elneed Association, a reinforced concrete ratio of 36.2%, and a site test body strength ratio of 1.0 or higher, can be understood in 9 pages.
Inquire About This Product
basic information
【Data Specifications】 ■ Number of Pages: 9 pages in total ■ Format: PDF ■ Target Audience: Design offices, construction companies, general contractors 【Contents】 - Introduction | Why is "Ability to Respond to Difficult Conditions" being questioned? - Difficult Condition 1: Groundwater and Spring Water (Water volume management based on flow rate × adjusted water content ratio) - Difficult Condition 2: Mud and Soft Ground (Advancing while stabilizing the footing with a general-purpose backhoe) - Difficult Condition 3: Large Boulders, Rolling Stones, and Rock Mass (Crushing and removing with an excavator, then immediately continuing construction) - Difficult Condition 4: Undulating Support Layers (Making the "invisible" "visible" through visual confirmation) - Difficult Condition 5: Remote Islands and Mountainous Areas (Only 4 pieces of equipment needed / No plant required)
Price information
The materials can be downloaded for free. We also offer free consultations and estimates regarding construction. Even at sites where you have been told "we cannot accommodate" using other methods, please feel free to consult with us first. We will provide answers regarding the feasibility of construction based on technical grounds.
Delivery Time
Applications/Examples of results
【Recommended for Such Sites】 ■ Sites with abundant groundwater and spring water └ Proven track record in Beppu City and Hakone Town (hot spring areas with high groundwater levels) ■ Sites with muddy, weak backfill where heavy machinery sinks └ Sites where poor backfill was discovered in "bare land delivery" properties ■ Sites mixed with large gravel, boulders, and rock masses └ Proven track record in Yamaguchi City and Hiroshima City (scattered gravel layers and uneven bedrock) ■ Ground with undulating support layers that are difficult to verify └ Sites where the risk of differential settlement needs to be reduced, and where excessive design should be avoided ■ Remote islands, mountainous areas, and sites with difficult access └ Proven track record in more than three remote islands without regular shipping routes (including Ishigaki Island) 【Main Uses】 ・Foundation ground improvement for buildings ・Support ground improvement for civil engineering structures ・Alternative methods for sites deemed difficult to address with other methods ・Selection candidates during method comparison discussions with design offices
Company information
The Elneed Association handles the "Super Rappuru Basic Construction Method (Elneed Method)." This method uses stabilized soil created by mixing construction-generated soil with water and cement-based solidifying agents, and it is an improved version of the Rappuru concrete method for construction foundations. Our member companies are located from Tohoku to Kyushu, allowing us to respond to requests from all over the country. Please feel free to contact us when you need our services.


![[Column] Over 3,000 Achievements: Reasons Why the Elneed Method is Chosen](https://image.www.ipros.com/public/default/object/noimage_l.gif?w=280&h=280)
![[Column] The El Niño Method That Can Be Applied Even in Areas with Abundant Groundwater](https://image.www.ipros.com/public/product/image/2115299/IPROS9123016161053024445.png?w=280&h=280)
![Ground reinforcement work [Performance certification method] Cross-wing column method](https://image.www.ipros.com/public/product/image/321794/IPROS4293062677374440758.png?w=280&h=280)
![Ground reinforcement construction [Performance certification method] Pure pile method](https://image.www.ipros.com/public/product/image/321794/IPROS13021923202802504447.png?w=280&h=280)
![Ground reinforcement work [Performance certification method] Σ-i method](https://image.www.ipros.com/public/product/image/321794/IPROS17689074750660876182.png?w=280&h=280)
![Ground reinforcement construction [Performance certification method] RES-P method](https://image.www.ipros.com/public/product/image/321794/IPROS6263428337976322716.png?w=280&h=280)
![[Free Offer] Elneed Method_Ground Knowledge Collection](https://image.www.ipros.com/public/product/image/2115299/IPROS18275664791655007365.png?w=280&h=280)