Construction method Product List and Ranking from 1587 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Mar 18, 2026~Apr 14, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Mar 18, 2026~Apr 14, 2026
This ranking is based on the number of page views on our site.

  1. 成瀬化学 Mie//Building materials, supplies and fixtures manufacturers
  2. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  3. コンステック Osaka//General contractors and subcontractors
  4. 4 TRAWE main office Saitama//Other construction industries
  5. 5 日本海洋サービス 大阪支店 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Mar 18, 2026~Apr 14, 2026
This ranking is based on the number of page views on our site.

  1. Waterproof layer renovation method for achieving the long lifespan of facilities! Narlite injection method. 成瀬化学
  2. 建物外壁工事 ロープアクセス工法 TRAWE main office
  3. Roof insulation and waterproofing renovation method "Rimtect Method" コンステック
  4. 4 Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  5. 5 Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研

Construction method Product List

3841~3870 item / All 4289 items

Displayed results

Pierstone Method (related technology for residual formwork construction)

It won't damage the landscape! There are various options such as fabric stacking.

The "Pier Stone Method" is a groundbreaking landscaping technique that revives the traditional craftsmanship of stone masons through the combination of residual formwork (pier) and residual decorative materials. Residual decorative materials refer to the landscaping materials such as natural stones, gravel, and thinned wood that are installed using the through-holes of the residual formwork (pier) in this method. Since the residual decorative materials are integrated with the cast-in-place concrete through anchors via the pier's through-holes, there is no concern about peeling or falling off. 【Features】 ■ The design pattern of the residual decorative materials is devised to avoid continuous joints, resulting in a natural joint finish. ■ While maintaining the stable strength of cast-in-place concrete structures, the aesthetic beauty of traditional dry stone walls and similar features can be reproduced. *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Residual Formwork Method Related Technology】W-Mel Method

Using external and internal formwork in a W (double) configuration! Applicable to ISM method as well.

The "W Mer Method" is a soil cement construction method that effectively utilizes locally generated soil and sediment, employing a residual formwork system for the construction of external protective concrete (cover concrete). By vertically installing the internal formwork, it is possible to ensure proper compaction of the internal material (INSEM material) even at the ends near the formwork panels. It can also be applied to the ISM method. 【Construction Examples】 ■ Shizuoka Prefecture Fuji Civil Engineering Office, First-Class River Improvement Work on Denpozawa River ■ Chubu Regional Development Bureau Tajimi Sediment Control National Route Office, Kiso River System Naka Tsutsumi No. 2 Sediment Control Dam Construction ■ Kinki Regional Development Bureau Kinokawa Dam Integrated Management Office, Sako District Landslide Countermeasure Work ■ Kyushu Regional Development Bureau Tachino Dam Construction Office, Tachino Dam Entrance Closure Embankment and Other Works *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Cathedral Method®

Construction can be carried out 24 hours a day, regardless of day or night, so speedy results can be expected.

Our company employs the "Cathedral Method (R)" in large-scale facility demolition and removal projects, utilizing all-weather temporary tents to create a sealed environment, thereby enhancing work safety, reducing work burden, and shortening construction periods. In the surrounding environment, we achieve the prevention of dust dispersion and reduction of noise generation. Additionally, due to the use of large machinery, we can mitigate serious hazards such as falls from heights and flying or falling objects. Please feel free to contact us if you have any inquiries. 【Features】 ■ Environmentally friendly ■ Noise reduction ■ Unaffected by weather ■ Work safety ■ Shortened construction period *For more details, please download the PDF or contact us.

  • Renovation and repair methods
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Water jet cutting method

New technology that takes into consideration both the environment and work vehicles!

Our company offers the "Water Jet Method," which allows for surface cleaning of concrete, roughening, chipping, and the removal of various types of paint using ultra-high-pressure water jets. This method does not use chemicals or abrasives, making it environmentally friendly. It can also be adjusted to the appropriate pressure according to the type and condition of the substrate. Please feel free to contact us if you have any requests. 【Features】 ■ Can be performed without damaging the main body more than necessary ■ Can selectively remove only the deteriorated paint and concrete ■ Allows for the removal of paint and lining materials without damaging the substrate ■ Generates minimal dust, considering the working environment ■ Compact design accommodates a wide range of construction conditions *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pressure Adjustment Injection Method 'SAPIS'

A new technology that revolutionizes concrete crack repair!

Our company offers the pressure-controlled injection method "SAPIS," which demonstrates excellent injection technology, adaptability, and economic efficiency. You can choose from two types of injection machines: the "Vacuum Suction Type Pressure-Controlled Injection Method (TH-110002-A)" and the "Nozzle Type Pressure-Controlled Injection Method (TH-110003-A)." Please feel free to contact us if you have any inquiries. 【Features】 ■ High-quality repair technology ■ Wide range of adaptability ■ Environmentally conscious *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Maruyama Zoo Repair Work [Water Jet Method]

Introduction of a case where asbestos was removed from an animal shelter using water jet technology in Sapporo, Hokkaido.

We would like to introduce a case study of our "Water Jet Method." At Maruyama Zoo in Sapporo City, Hokkaido, we used the water jet method to remove asbestos from the animal enclosure. This method is suitable for asbestos removal work as it does not generate dust. 【Case Overview】 ■ Location: Sapporo City, Hokkaido ■ Implementation Period: September 2019 ■ Type of Work: Asbestos removal in the animal enclosure ■ Method: Water Jet Method *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Clean Nail® Method

I want to return clean water for the future of the Earth.

The "Clean Narl® Method" is a cleaning technique for floors that takes into consideration the natural environment. It is a newly developed technology aimed at cleaning floor surfaces without damaging the materials and regardless of the type of dirt. By adopting this method, significant reductions in work time and overall costs can be achieved. Additionally, it provides not only cleaning effects but also anti-slip effects. Please feel free to contact us if you have any inquiries. 【Features】 ■ Uses a uniquely developed powerful cleaning solution and dedicated neutralizing solution ■ Neutralization treatment can be performed on-site, allowing for direct drainage into the gutter ■ Capable of removing stubborn dirt as well as rust stains from floors ■ Provides anti-slip effects after application ■ Used waste materials can be disposed of as general waste, etc. *For more details, please download the PDF or contact us.

  • Special Construction Method
  • cleaning
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic reinforcement method "NS Cutting Method"

It is a cutting technology for installing seismic-resistant joints.

Our company provides a seismic-resistant flexible joint (secondary product) that can be installed at the connection points between existing pipes, rehabilitated pipes (composite pipes), and manholes without excavation. This method, called 'NS Cutting Method,' is designed to accommodate the extraction, protrusion, and bending of existing and rehabilitated pipes (composite pipes) under the assumption of Level 2 seismic motion. It can be executed regardless of the construction procedures before and after pipe rehabilitation. Additionally, the operation can be performed remotely via a control panel installed on the ground, ensuring safety and smooth execution. 【Construction Steps】 1. Preliminary Confirmation (Investigation Work) 2. Invert Breaking 3. Cutter Blade Replacement 4. Cutting Work 5. Installation of Seismic-Resistant Flexible Joint 6. Finishing Work *For more details, please download the PDF or contact us.

  • Earthquake-resistant construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic reinforcement method "Remake Ring"

Seismic reinforcement method for rehabilitation pipes and manhole connections using non-excavation techniques!

Our company provides a seismic retrofitting method called "Remake Ring," which involves installing flexible seismic joints at the connection points between the non-excavated rehabilitated pipes (independent pipes) and manholes. This method is designed to accommodate the extraction, protrusion, and bending of rehabilitated pipes under Level 2 seismic motion. This method can be applied in two scenarios: one where flexible seismic joints are installed at locations where pipe rehabilitation has already been completed, and another where flexible seismic joints are installed alongside the pipe rehabilitation work. Please feel free to contact us if you have any inquiries. 【Application Scope】 ■ Applicable existing pipe types: Reinforced concrete pipes, ceramic pipes ■ Applicable rehabilitated pipes: Independent pipes ■ Applicable existing pipe diameters: 200 to 700 mm, etc. *For more details, please download the PDF or contact us.

  • Earthquake-resistant construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Bridge repair construction services

We will carry out a series of construction work from scaffolding to painting!

Our company conducts "bridge repair work" such as cross-section restoration work, footing mortar repair work, and crack injection work. We have been performing cross-section restoration work for over 20 years and are capable of handling any materials. Please feel free to consult us if you have any requests. 【Main materials used (cross-section restoration work)】 ■ Elehon Fix TS ■ Lion GRLC-J *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Bridge Construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Flyer Method "NALT Method"

A fryer method that allows for uniform stirring within the hole through suction circulation from the bottom, making cost reduction possible.

The "NALT method" allows for a high discharge rate of 3m³ per minute due to tornado rising, which shortens the mixing time, and the mixing condition at the bottom can be confirmed with specific gravity samples from the discharge outlet. By adding materials within the circulation, it is possible to reduce the amount of cement added by 10-20%, which leads to high-strength solidification. The amount added is not affected by unexpected variations in pile diameter, pile length, or changes in injection volume due to groundwater. Please feel free to consult us if you have any requests. 【Features】 ■ No need for mixing machinery ■ Pull-out over two days is possible ■ Reliable cement quantity addition ■ No influence from plant conditions ■ No need for plant equipment *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

High-pressure gas container re-inspection service

Leave the re-inspection of high-pressure gas containers to us!

We conduct re-inspections of high-pressure gas containers. We mainly handle two types of containers: LP gas containers and general gas containers. Containers that fail inspection or are requested for disposal are processed as scrap. Please feel free to contact us if you have any requests. 【Handled Containers】 ■ LP Gas Containers - Household containers, LP gas vehicle containers, forklift containers, large containers ■ General Gas Containers - Oxygen, nitrogen, argon, carbon dioxide, nitrous oxide, hydrogen, etc. *For more details, please download the PDF or feel free to contact us.

  • maintenance
  • Gas equipment
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Footingless Panel Method (R)

Free-standing retaining wall construction method without a base slab.

Our company offers the economical and easy-to-construct "Footingless Panel Method (R)." Since it does not have a base slab, it allows for high flexibility during construction and is effective in sites where excavation width is limited. It is also cost-effective as there is no need for large machinery or ground improvement. Steel pipe piles are installed to create a retaining wall on columnar ground improvement bodies, making it possible to construct on ground with an N value of 3 or higher. Please feel free to contact us if you have any inquiries. 【Features】 ■ Effective in sites where excavation width is limited ■ Economical in sites with poor ground conditions ■ Possible to construct in narrow sites *For more details, please download the PDF or contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Heat insulation method "Top Heat Barrier"

For energy conservation and measures against global warming!

Our company offers the heat insulation method "Top Heat Barrier." For outdoor heat insulation, it can be widely used not only for building roofs and exterior walls but also for outdoor equipment such as outdoor tanks and air conditioning outdoor units, as well as in the agricultural sector. Additionally, for indoor heat insulation, there is no need for a reflective air layer on the heat source side, meaning there is no need to create space with spacers or similar materials, allowing for a shorter construction period and lower costs. 【Product Lineup】 ■ Outdoor heat insulation ■ Indoor heat insulation ■ High-temperature equipment insulation ■ Outdoor equipment insulation ■ Tent insulation *For more details, please download the PDF or feel free to contact us.

  • Heat insulation and heat shielding methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Nuri-form (spray painting, single coat)"

Maintenance is easy after painting! The original paint has excellent durability, weather resistance, and chemical resistance.

"NuRiForm" is our unique remodeling method that involves direct spray painting on existing bathrooms. In addition to bathtubs, it is also possible to paint three-dimensional surfaces and components within the bathroom, such as counters and bathtub aprons. Since it can be applied to floors, walls, and ceilings, we also recommend a complete NuRiForm for the entire bathroom. In the unlikely event that stubborn stains or small scratches occur, they can be easily restored by polishing with compound. If there are chips in the paint film or scratches that cannot be removed with compound, partial maintenance repairs can be done with touch-up repairs. [Features] - Excellent for painting curved substrates like bathtubs - Original paint that is resistant to dirt - Can be used for a long time in a clean condition - Easy maintenance after painting *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation
  • Renovation Design
  • Plastering and painting work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Hareform (floor sheet installation)"

Since it is simply applied over the existing floor, the installation takes about half a day to complete! An environmentally friendly ecological method.

"Hariform" is a renovation method that involves directly applying decorative sheets to the walls and ceiling of the bathroom, and attaching foam multilayer vinyl flooring to the floor. It uses a high-performance CF sheet specifically designed for bathroom floors, allowing for an easy refresh of just the floor. Since it is simply applied over the existing floor, the installation takes about half a day to complete. Additionally, because it is made of a cushioned foam sheet, it has excellent thermal insulation properties. If the existing floor is tiled, it can get quite cold in winter, but by applying this flooring material, it provides excellent insulation, making it less likely to feel chilly when touched with bare feet, thereby reducing the risk of heat shock. [Features] - High-performance flooring sheet specifically for bathrooms - Measures against heat shock - Can be installed without damaging the existing floor - No waste or noise generated *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation
  • Renovation Design
  • panel
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Eco Bus Reform: Bathroom Insulation Renovation

Easy to install! It creates a safe and comfortable bathroom environment that you can enjoy bathing in with peace of mind, even in winter.

Transform your existing bathroom into a warm unit bath style! You can easily remodel with foam CF sheets specifically for bathroom floors and water-resistant foam resin panels (3mm thick) that are antibacterial and mold-resistant. It's also fine for small bathrooms or those that cannot be replaced with a unit bath. We will cut the materials to fit the current size, ensuring a perfect and clean finish without gaps! In addition to a bathroom-specific floor sheet that won't feel "chilly" even in winter, the ceiling and walls are wrapped with decorative panels made from foamed resin to minimize temperature drop inside the bathroom and maintain warmth. The decorative panels for water areas have a flat surface that resists dirt, and the anti-mold and antibacterial features make daily maintenance very easy. 【Features】 - Ideal for bathrooms that cannot accommodate a unit bath! - Remake even small bathrooms into a unit bath style - Minimal waste as existing bathrooms are not demolished - Custom-made with free choice of colors and patterns! Create your ideal bathroom space ◎ - Choose remodeling areas according to your budget - Windows, doors, and fixtures can also be newly installed together *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation
  • Renovation Design
  • Insulation work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Wall regeneration method "e-coat(R) series"

Developed with high product strength and technological capability! Consideration is also given to the global environment.

The "e-coat(R) series" is a wall restoration method that rejuvenates surfaces to like-new condition without the need to replace wallpaper, providing a beautiful living space. It contributes to environmental issues by reducing waste generated during wallpaper replacement, harmful substances released during combustion, and the need for new resources. Please feel free to contact us if you have any inquiries. 【Lineup】 ■Standard ■Sound-absorbing board ■Diatomaceous earth *For more details, please download the PDF or contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Machinery and equipment manufacturing services

Please leave everything from the planning stage to completion to us!

Our company manufactures various machinery and equipment, including FA systems, labor-saving devices, and conveyors, with professionals in three different job categories. By seamlessly collaborating in technical sales, mechanical design, electrical control design, robot control, and mechanical assembly, we enable flexible development and speedy production. You can entrust us with the design, manufacturing, assembly, on-site installation, and maintenance of various production equipment, from the conceptual stage to completion. Please feel free to consult us with your requests. 【Our Strengths】 ■ Capable of handling everything from concept to final installation ■ We have an in-house design department ■ We respond firmly to customer requests, gaining trust and stability ■ We have a passion and culture for solving customer problems *For more details, please download the PDF or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Vibro-assisted press-in method (LRB machine)

No need for cement milk, construction that considers the environment is possible!

The Vibro-assisted Press-in Method (LRB machine) is a press-in method using a self-propelled pile driver equipped with a vibro hammer. It can utilize a high-frequency vibro LV20 mounted on the main machine leader for driving and extracting H-beams and steel sheet piles. By combining high-frequency vibro and press-in input, the efficiency of driving and extracting steel piles is dramatically improved compared to conventional methods. Additionally, the need for cement milk for ground stabilization, plant equipment, and disposal of excess soil is eliminated, allowing for environmentally friendly construction. 【Features】 - Reduction in fuel consumption due to shortened construction period - No need for cement milk for ground stabilization - No plant equipment required - No soil disposal construction - Compact construction is possible *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Deep well drainage

The groundwater level has dropped, making dry excavation possible! An illustration after construction is also included.

Here is an introduction to deep well drainage. When conducting underground excavation work, it becomes necessary to lower the water level in the area being excavated if the groundwater level is high. One of the methods employed for this purpose is the deep well drainage method. By implementing the deep well drainage method, it is possible to lower the groundwater level and perform dry excavation. (The number and depth of wells may vary depending on the geological conditions.) 【Features】 ■ When conducting underground excavation work, it becomes necessary to lower the water level in the area being excavated if the groundwater level is high. ■ One of the methods employed for this purpose is the deep well drainage method. ■ It becomes possible to lower the groundwater level and perform dry excavation. *For more details, please refer to the PDF materials or feel free to contact us.

  • 122.png
  • 123.png
  • Drainage and ventilation equipment
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Different settlement countermeasure construction method "Super Geo Method"

By reducing the weight of the foundation, we can suppress the sinking of the building even during earthquakes and other events!

Our company offers the "Super Geo Method," a groundbreaking lightweight ground replacement technique that not only addresses differential settlement and liquefaction but also provides seismic vibration damping effects, serving as an earthquake countermeasure. It also functions as a rainwater retention and infiltration system, allowing for long-term storage and utilization. This method fully leverages the advantages of soft ground (seismic isolation effects) while thoroughly compensating for its weaknesses (differential settlement and liquefaction prevention effects). Please feel free to contact us if you have any inquiries. 【Features】 ■ Soft ground measures ■ Liquefaction measures ■ Earthquake measures (seismic isolation) *For more details, please download the PDF or contact us.

  • Earthquake-resistant construction method
  • Ground foundation construction method
  • Ground improvement materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Structural Repair Method "MOG Rope Net Method"

Inspection and repair using a rope net basket with a patented construction method!

Our company offers a structural repair method using a patented rope net basket, called the "MOG Rope Net Method." Compared to conventional methods, it provides higher safety, allows for accurate inspections, and enables the identification of causes for repairs. Based on our track record with government agencies, licensed architects and builders deliver peace of mind at a more affordable cost. 【Features】 ■ Utilizes a fall prevention rope net, focusing on safety ■ An efficient proprietary method that does not require scaffolding *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Catalog] Roofing Materials and Exterior Wall Materials

A wide variety of metal roofing and exterior wall materials are available from our company!

This catalog features roofing and exterior wall materials from Itaya Metal Co., Ltd., which engages in the processing and sales of secondary steel products, large roofing materials, and wall materials. We introduce a variety of products, including roofing materials such as "Round Haze Folded Material 166" and "Round Haze Folded Plate 90," which excel in workability, as well as exterior wall materials suitable for medium to large structures, such as "Square Wave Siding 750" and "Square Wave Siding 800." [Contents] ■ Roofing Materials ■ Exterior Wall Materials *For more details, please download the PDF or feel free to contact us.

  • Others/Roofing materials (shingles, cement, steel sheets, aluminum)
  • Other wall materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-altitude double-R construction method LH-RR method

By using a low-head type pile driver and a low-head type special auger in this construction method, it is possible to perform construction with a low head!

The "Low Headroom Double R Method LH-RR Method" enables construction in high N-value layers such as soft rock and gravel with low vibration and low noise using small foundation machinery. Traditionally, ground that required large foundation machinery can now be constructed using a leaderless pile driving machine weighing between 20t and 40t, equipped with a high torque auger ranging from 70.7 to 98kNm, utilizing main body pressure input and a special auger head for hard ground. Additionally, the removal of obstacles and crushing methods underground can also be performed by changing attachments. 【Low Headroom Special Auger Performance (Partial)】 ■ Auger Type: AGD7000 ■ Weight (kg): 1,720 ■ Operating Pressure/Flow Rate: 27.4Mpa・220l/min ■ Base Machine Used: Hitachi Construction Machinery RX2300・SRX2700・RX3300 Low Headroom Dedicated Machines *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-altitude head-down-the-hole hammer method LH-DH method

Down-the-hole hammer method under low ceilings, under bridges for railways and roads, and under power lines!

We would like to introduce our "Low-Headroom Down-the-Hole Hammer Method LH-DH Method." Using a driving device to rotate the down-the-hole hammer and bit, the piston inside the hammer cylinder is moved back and forth by air supplied from a high-pressure compressor. This movement causes the bit tip to strike and break stones and rock formations, while the excavated soil is removed using a screw and air lift method. To prevent wear and seizure inside the cylinder due to piston movement, it is necessary to spray oil into the air using a line oiler. 【Construction Examples (Partial)】 ■ LH-DH Method ・Height restriction: 4.55m (under special high-voltage lines) ・Steel material: H250 L=7.5 to 9.5m joint pile construction ・Construction machinery: RX2300 low-headroom construction machine, special auger for low headroom AGD7000 *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-profile casing conveyance down-the-hole hammer method LH-CDH

Low-altitude, under-bridge, under-railroad, under-road bridge, and under-power-line casing conveyance type down-the-hole hammer method!

We would like to introduce our "Low-Headroom Casing Continuous Down-the-Hole Hammer Method LH-CDH Method." By using a special bit and continuously installing protective steel pipes for the borehole walls, we can reliably excavate to the designed height even in collapsed layers with high groundwater levels. After excavation, the steel pipes are left in place, allowing for the extraction of the hammer bit, which ensures that core material installation and solidification with mortar can be carried out effectively. Please feel free to consult us when you need our services. 【Construction Examples (Partial)】 ■ LH-CDH Method - Height restriction: 4.55m (under highway bridge) - Steel material: H300 L=11.5m continuous pile construction - Construction machinery: RX2300 low-headroom construction machine HGS60 *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Gas appliances

We propose a comfortable gas supply system.

We provide a comfortable gas supply system, including LP gas piping materials. Our specialized sales representatives, who are well-versed in our products, will propose suitable items for your needs. Please feel free to contact us with any inquiries. 【Main Products】 ■ Various low-pressure valves (gas faucets) ■ Various high-pressure valves ■ LP gas supply equipment ■ Gas meters ■ Water supply and heating equipment ■ Bulk supply equipment ■ Piping materials, etc. *For more details, please download the PDF or contact us.

  • Gas equipment
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Nice! Takasho

We have started an EC site!

Gas, water, electricity, work supplies, etc. Membership-based professional specialty shop "Iine!" We offer a wide range of materials necessary for everyone supporting lifelines, focusing on gas, as well as water, electricity, and work supplies.

  • Gas equipment
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Safety device "Mamoriti" to prevent pinching.

For preventing entrapment by aerial work platforms and handrails.

"Mamoritii" is a rubber anti-pinch device. Most cases of pinching on site involve hands rather than heads, with 70% of cases involving hands gripping handrails. This is why it was developed. By installing it on handrails and aerial work platforms, it serves as a safety measure to prevent hand pinching accidents. It is compatible with three sizes of standard aerial work platform handrails: 30mm square, 27mm round, and 34mm round. Please feel free to contact us if you have any requests. [Features] - Made of rubber - Improved durability - Does not break when crushed - Inexpensive *For more details, please download the PDF or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration