Construction method Product List and Ranking from 26 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Jul 16, 2025~Aug 12, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jul 16, 2025~Aug 12, 2025
This ranking is based on the number of page views on our site.

  1. null/null
  2. null/null
  3. null/null
  4. 4 エスケー化研 Osaka//Building materials, supplies and fixtures manufacturers
  5. 5 null/null

Construction method Product ranking

Last Updated: Aggregation Period:Jul 16, 2025~Aug 12, 2025
This ranking is based on the number of page views on our site.

  1. Off-site construction method for air conditioning equipment "Vispaire Frame"
  2. Temporary bridge temporary pier cable-stayed construction method "LIBRA Method"
  3. Rigid urethane coating waterproofing HU-B method 化研マテリアル
  4. 4 Unrestricted Foundation Roller Method 'Cerami RC-FR Method' エスケー化研
  5. 5 Special foundation roller painting method for interior and exterior finishes "Fine FR Method" エスケー化研

Construction method Product List

106~120 item / All 2454 items

Displayed results

Sand Erosion Prevention Works - Greenland Method

Sand Erosion Prevention Works - Greenland Method

This method involves applying synthetic resin-based sand control agents to prevent flying sand and dust from bare land, such as construction sites and reclaimed land, for a certain period, and by sowing seeds of grasses and turf to establish vegetation that will permanently prevent flying sand and dust. 【Features】 - It is non-toxic to humans and fish, ensuring safety during and after construction. - The sand control agent penetrates and binds soil particles, forming a solid layer that maintains stable sand control effects even under heavy rain or strong winds of 20 m/sec for an extended period. - The sand control agent is colored green, making it easy to confirm the application area. ● For other functions and details, please contact us.

  • Waste treatment facilities
  • Retaining wall
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Forest Topsoil Utilization Work A0 Base Method

Forest Topsoil Utilization Worker A0 Base Method

The A0 base method is a natural regeneration greening technique that involves suctioning and collecting buried seeds (soil seed bank) contained in the forest topsoil (A0 layer) near the construction site, utilizing them as plant materials to create local plant communities, and restoring vegetation that harmonizes with diverse ecosystems and the regional landscape. 【Features】 ○ By using buried seeds from the forest topsoil (A0 layer) near the construction site as plant materials, this method suppresses the hybridization of local plant communities (genetic disturbance), preserves a diverse ecosystem, and achieves natural regeneration greening that harmonizes with the regional landscape and environment. ○ The newly developed forest topsoil collection device, the "Seed Bank Sweeper," is lightweight, compact, and efficiently collects forest topsoil while minimizing the impact on the seedlings on the forest floor. ● For other functions and details, please contact us.

  • Retaining wall
  • Earthworks
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Long fiber mixed thick layer substrate spraying work - Roving shot method

Long fiber mixed thick layer substrate spraying work - Roving shot method

This construction method is a slope greening technique using geotextiles (soil stabilization fibers). By incorporating long fibers, it streamlines the installation of fiber nets and diamond wire mesh, enhances erosion resistance, and creates a sustainable vegetative foundation, thereby achieving labor savings and shortening the construction process. 【Features】 - The incorporation of long fibers allows for the reinforcement of the growth foundation over a wide area, providing a reinforcement effect similar to that of plant root systems immediately after spraying. - By mixing long fibers into the corkboard-like finished growth foundation, further improvement in erosion resistance can be achieved. ● For other functions and details, please contact us.

  • Bricks and Corks
  • Exterior Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Long fiber mixed reinforcement soil integrated greening construction - Roving wall method

Long fiber mixed reinforcement soil integrated greening construction - Roving wall method

【Features】 ○ Creates reinforced soil with high pseudo-adhesion and shear strength ○ Can accommodate various shapes of slopes and inclines ○ Forms soil structures similar to natural soil conditions ○ Excellent portability allows for efficient construction ● For other functions and details, please download the catalog.

  • Fiber wall
  • Retaining wall
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

PCL method

Multi-segment precast concrete slabs for tunnel interior finishing, repair, and reinforcement purposes.

The PCL panels used in the PCL method are intended for the interior finishing, repair, or reinforcement of tunnels. They are arc-shaped precast concrete panels that are divided into multiple sections in the transverse direction of the tunnel and are installed on top of the pre-constructed side walls as lining materials.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

High Support Strength Construction Method / Medium Excavation High Support Strength Method "Hyper-NAKS Method"

High load-bearing method using the middle excavation expansion foundation method.

The Hyper-NAKS method is a type of embedded construction method classified as a middle excavation and enlarged root solidification method, using precast concrete piles (with the lower pile being ONA105-S). This method excavates the ground at the tip of the pile using a hydraulic expansion bit at the tip of a spiral auger inserted into the hollow part of the pile, while discharging the excavated soil through the hollow part of the pile to the discharge bucket at the top of the pile, allowing the pile to be installed by its own weight and forced pressure input. 【Features】 ○ Dramatic transformation of the bearing capacity calculation formula ○ Increased maximum pile diameter up to φ1200mm ○ Root solidification bulb construction using hydraulic expansion bits ○ Excellent construction performance and reliability with no-weld joints ○ Standard equipped with a discharge bucket For more details, please contact us or download the catalog.

  • Earthworks
  • Piles, caissons, sheet piles
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Non-welded joint method "Triple Plate Joint"

T・PJOINT proudly offers reliable, robust, and convenient excellent features.

The triple plate joint consists of end plates, side plates, reinforcement bands, connection plates, and connection bolts. The joint fittings of the main pile consist of end plates, side plates, and reinforcement bands, with screw holes corresponding to the bolt holes of the connection plates cut into the side plates. The end plates and connection plates have a complementary uneven shape that fits together when aligned, and by attaching connection bolts to the screw holes of the side plates, the uneven shapes interlock, transmitting the stress acting on the pile through this interlocking section. 【Features】 ○ Has performance equivalent to welded joints ○ Less affected by weather conditions, allowing for stable construction ○ Can be safely constructed in areas where open flames are prohibited ○ Shorter construction time compared to welded joints ○ The connection plate is divided into three parts for weight reduction, making it easy to handle For more details, please contact us or download the catalog.

  • Concrete sheet piles and piles
  • Piles, caissons, sheet piles
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Hyper Series"

Supporting near-future architecture! We offer a variety of options that can accommodate various ground conditions!

The "Hyper Series" is a construction method that allows for the reduction of materials used and the decrease of construction energy. Starting with the pre-boring high load-bearing method "Hyper-Straight," it also includes the pre-boring high load-bearing method "Hyper-MEGA" and the intermediate boring high load-bearing method "Hyper-NAKSII" in its lineup. It pursues cost performance by adopting high load-bearing capabilities and ultra-high strength piles. 【Features】 ■ Exploration of resource conservation ■ Response to construction environment ■ Pursuit of cost performance ■ Exceptional construction precision ■ Reliable dependability *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Solar Panel 4-Point Support Installation Method "Solar Gashit Series"

Strong installation that withstands rain, wind, and earthquakes! It has a simple structure.

The "Solar Gashit Series" is a solar panel installation system. It features a simple structure that allows for straightforward installation. A single panel is securely fixed with four arms. This increases installation strength, allowing for safe use even in areas with strong winds for extended periods. 【Features】 ■ Minimal gap between the roof and solar panel ■ Installation height is about half compared to conventional methods ■ Gashit base is resistant to cracking and does not shatter ■ Gashit base eliminates concerns about leaks due to tile processing ■ Simple structure ■ Easy installation *For more details, please refer to the PDF materials or feel free to contact us.

  • Roof and gutter construction
  • Power generation equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Bridge Waterproofing Method Comprehensive Catalog

Exhibits excellent performance not only in waterproofing and durability but also in adhesion and workability!

This catalog features waterproof sheets suitable for bridge waterproofing methods. We introduce the "SR Sheet," developed to prevent water penetration within the deck, as well as the asphalt coating waterproofing material "Polyascoat II." Additionally, we explain the necessity of the flowing application method (SR-110) and the use of joint tape (Flash Tape). 【Contents】 ■ Product Introduction ■ Flowing Application Method (SR-110) ■ Torch Method (SR-120) ■ Ambient Temperature Method (SR-130) ■ Asphalt Coating Waterproofing Method (Polyascoat II Method) ■ Necessity of Using Joint Tape (Flash Tape) ■ Materials Used / Various Considerations in Construction *For more details, please refer to the PDF document or feel free to contact us.

  • Waterproofing work
  • Bridge Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Chemix Asbestos Treatment Method

Asbestos has many excellent properties. It is highly workable and economically advantageous, but the harmfulness of airborne fibers has become apparent.

Asbestos refers to a group of naturally occurring fibrous minerals, derived from the Greek word meaning "eternal and unquenchable." It is classified into six types, with the most commonly used being chrysotile (white asbestos), crocidolite (blue asbestos), and amosite (brown asbestos). Due to its hazardous properties that can cause health issues such as lung cancer and mesothelioma, asbestos was designated as a specific chemical substance in 1971, and the spraying of asbestos was banned in 1975. Furthermore, in Japan, the use of particularly harmful blue and brown asbestos was prohibited in April 1995. The amendment to the Enforcement Order of the Industrial Safety and Health Act, which came into effect on October 1, 2004, also imposed a complete ban on white asbestos. Although its use was allowed until 2006 for certain applications, all six types were fully banned in June 2008. However, the effectiveness of alternative products is lacking, and it is unclear how long it will take to achieve a complete transition.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

HydroDyne Method

Blast furnace slag is an environmentally friendly material.

"Hydrodine" is a crack injection material primarily composed of blast furnace slag fine powder (2.8μm) and HT-G1. When slurried with HT-G1 and injected, Hydrodine promotes hardening over a long period and integrates with the target concrete structure. When injected into cracks, Hydrodine rapidly reacts with calcium ions (Ca+) leached from the concrete and blast furnace slag, producing strong calcium silicate hydrates, thereby forming a dense hardened body over an extended period.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Design Method "Syrical Art Method"

Space creation with special polyester sheets! A design method for decorating floors and other surfaces with patterns and photos.

The "Shirikar Art Method" is a technique that expresses three-dimensional designs by printing patterns such as natural stones on special polyester sheets and adhering them with resin. In addition to patterns, various marks and photographs can also be accommodated. The resin is excellent in light and water resistance, allowing for displays both outdoors and indoors. It is used in walkways, parks, station concourses, theme parks, and more. 【Features】 ■ Expresses three-dimensional designs on floors and walls ■ Accommodates patterns, marks, photographs, etc. ■ No extreme color fading or peeling occurs even after 2000 hours ■ Abundant design options *For more details, please refer to the catalog or feel free to contact us.

  • Store construction
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Drainage of surface-stagnant rainwater using FC drain method.

Drainage of surface retained rainwater using FC drain method.

This is a method for efficiently draining rainwater that has pooled on permeable asphalt pavement. Rainwater that accumulates in ruts can cause vehicle slippage and splash onto pedestrians. By installing the asphalt-based heated pavement repair material "Drainage Falcon" in the longitudinal and transverse drainage channels, this method, known as the "FC Drain Method," enables efficient pavement drainage and creates a comfortable road environment even during rainy weather. 【Features】 ○ Eliminates damage to the pavement caused by clogging of the channels or chipping of corners. ○ Large catchment area allows for efficient pavement drainage. ○ Repairs through replacement are also possible, making maintenance easy. ● For other functions and details, please contact us.

  • Drainage and ventilation equipment
  • Roof drain

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Excess concrete treatment - Stretch-type pile cap method

Excess Concrete Treatment - Stretch Type Pile Cap Method

By splitting the previous single-piece post caps into two parts and transporting them in a tea canister state, we have doubled the transportation efficiency. 【Features】 ○ 20% reduction in manufacturing costs ○ Reduction in stockyard area ● For other functions and details, please download the catalog.

  • Concrete sheet piles and piles
  • Piles, caissons, sheet piles
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration