Excess Concrete Treatment - Stretch Type Pile Cap Method
By splitting the previous single-piece post caps into two parts and transporting them in a tea canister state, we have doubled the transportation efficiency. 【Features】 ○ 20% reduction in manufacturing costs ○ Reduction in stockyard area ● For other functions and details, please download the catalog.
Inquire About This Product
basic information
By splitting the previous single-piece post caps into two parts and transporting them in a tea canister state, we have doubled the transportation efficiency. 【Features】 ○ Reduced manufacturing costs by 20% ○ Reduced stockyard area ● For other functions and details, please download the catalog.
Price information
-
Delivery Time
Applications/Examples of results
【Purpose】 ○ Excess concrete processing
catalog(1)
Download All CatalogsCompany information
We are constantly seeking leaps and transformations, advancing the development and research of technology.




![Road construction method "Metal Road Method" [For road construction in steep slopes of mountainous areas!]](https://image.www.ipros.com/public/product/image/396/2001511362/IPROS8312756002241763722.png?w=280&h=280)

![Ground reinforcement construction [Performance certification method] RES-P method](https://image.www.ipros.com/public/product/image/321794/IPROS6263428337976322716.png?w=280&h=280)

