Construction method Product List and Ranking from 1587 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Jun 03, 2026~Jun 30, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jun 03, 2026~Jun 30, 2026
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. シーカ・ジャパン Tokyo//Building materials, supplies and fixtures manufacturers
  3. エコ・24 本社 Kanagawa//Other construction industries
  4. 4 昭石化工 Tokyo//Building materials, supplies and fixtures manufacturers
  5. 5 横山基礎工事 Hyogo//General contractors and subcontractors

Construction method Product ranking

Last Updated: Aggregation Period:Jun 03, 2026~Jun 30, 2026
This ranking is based on the number of page views on our site.

  1. 煙突に対するアスベスト封じ込め工法『CAS工法』 エコ・24 本社
  2. Install the valve without stopping the water! 'EM Continuous Water Valve Method' SUIKEN Co., LTD
  3. Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  4. 4 DominoZone A new termite control method that does not involve applying chemicals under the floor. Envu エンバイロサイエンスジャパン
  5. 5 For deep excavation work and cutting/removal of underground obstacles! Super Top Method. Taiyo Kisokogyo Co.,Ltd.

Construction method Product List

2281~2310 item / All 4321 items

Displayed results

Micro Pile Method "SP Micro Pile"

Micro Pile Method "SP Micro Pile"

This is a full-scale high-strength micro-pile construction method that involves double-tube drilling with large-diameter self-drilling bolts and thick-walled steel pipes, ensuring reliable bolt adhesion by extracting the thick-walled steel pipe within the support layer, and placing the thick-walled steel pipe in the upper section. 【Features】 ● Double-tube drilling with self-drilling bolts Great support capacity even with a narrow diameter. (Can accommodate compression, pull-out, and lateral loads) ● Double-tube drilling using self-drilling bolts and thick-walled steel pipes. (Can be handled with conventional anchor machines) ● Construction is possible even in narrow workspaces by selecting the appropriate installation machinery. ● Injection work can be carried out immediately after drilling is completed. (High-speed construction is economical) ● Reduces the time until steel pipe extraction. (Adhesion with the ground occurs, making extraction reliable) ● Easy connection of bolts and steel pipes. ● For other functions and details, please contact us.

  • Steel structure construction
  • Foundation construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Injection-type original design rock bolt method "SP Soil Nail"

It achieves "high speed," "simplicity," and "low cost" compared to the conventional double-tube drilling method.

"SP Soil Nail" achieves "high speed," "simplicity," and "low cost" compared to the conventional double-tube drilling method. Compared to the traditional double-tube method using anchor machines, the components are lightweight, eliminating the need for rod retrieval and core material installation, enabling labor-saving and high-speed construction. The pressurized injection effect of SP Soil Nail has been verified through tests such as "excavation tests." 【Features】 ○ High-speed, labor-saving construction ○ Reliable anchoring achieved through pressurized injection For more details, please contact us or download the catalog.

  • Earth retaining wall/foundation reinforcement
  • Earthworks
  • Pile and foundation work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Micro-pile construction method "SP Micro-pile method"

Self-drilling bolt for double pipe excavation "SP Micro Pile"

"SP Micro Pile" is a unique micro pile construction method developed based on publicly available research from various countries, including Italy, the United States, and Japan, with a thorough pursuit of improved workability, long-term quality maintenance, and cost-effectiveness. 【Features】 ○ High strength orientation ○ Ministry of Land, Infrastructure, Transport and Tourism NETIS registration number: KK-100036-A For more details, please contact us or download the catalog.

  • Earth retaining wall/foundation reinforcement
  • Earthworks
  • Pile and foundation work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Micro-pile construction method "SP Fix Pile Method"

Route pile construction method that achieves high speed, labor saving, and multi-stage hook effect.

The "SP Fix Pile" uses a hollow SP bolt as a center rod and employs a double-tube drilling method with a general-purpose drill pipe, which can also be applied as a micro-pile. Once drilling is completed, injection is performed through the SP bolt, and only the drill pipe is withdrawn, eliminating the need for rod retrieval or core material installation, thus enabling labor-saving and high-speed construction. Although it features a thick bolt structure with a diameter of 115mm or more, stable drilling and reliable shaping through pressurized injection can be achieved with a general-purpose anchor machine up to about 20m, making it effective as a long, thick bolt for countermeasures on slopes with extremely deep soft layers or embankment slopes. Additionally, when adopted as a compression-type pile foundation, placing a "mouth reinforcement pipe" at the head allows for the rational handling of horizontal forces and bending moments in addition to axial compressive forces. 【Features】 - It is a reinforcement soil method that does not introduce tension, eliminating the need for tension management. - Even if over-tension occurs due to seismic loads, there is no issue with tension adjustment. - The SP bolt is used as a center rod for double-tube drilling, leaving it in place, so core material insertion work is unnecessary. - It is a waiting-type reinforcement soil that does not require tensioning work. - The work process can be shortened, achieving high-speed construction. For more details, please contact us or download the catalog.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Micro-pile construction method "SP Mini Pile Method"

Large diameter self-drilling bolt "SP Mini Pile"

Self-drilling bottles are more widely used for their simplicity and speed of operation in reinforcement earthworks such as mountain tunnel auxiliary works and slope stabilization, as well as for their overall economic efficiency and workability in confined spaces. The "SP Mini Pile" is a thick-walled self-drilling system developed by "ST Engineering Co., Ltd." aimed at further expanding the application of the advantages of the self-drilling system into a broader range of fields. 【Components】 ○ SP Fixed Nut ○ SP Coupler ○ SP Bolt ○ SP Bit For more details, please contact us or download the catalog.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Urethane Hollow Filling Method "NTR Method"

A product lineup that can be selected according to conditions, ranging from 10 times expansion to 40 times expansion.

High-expansion polyurethane injection material [NTR Foam] is a product developed for filling cavities behind tunnel walls. Due to its high expansion, it can fill cavities with a small amount, making it very economical. Moreover, it has an extremely low specific gravity, which does not impose a significant load on the tunnel. Additionally, its curing time is very short, making it suitable for projects that require quick construction. 【Features】 ○ Because it is a high-expansion polyurethane, the required material can be reduced by the expansion ratio, making construction simple and lightweight. ○ The short curing time allows for limited injection, and even in the presence of water inflow, the possibility of material separation and outflow is minimal, thus not adversely affecting the water environment. ○ The foamed solid forms a water-insoluble polymer compound with a three-dimensional structure, which is chemically stable and maintains its shape and strength over the long term. ○ Compliant with the "Guidelines for Safety Management of Polyurethane Injection Materials in Mountain Tunnel Construction." ○ A lightweight, compact injection machine that offers good workability and can be used in long and narrow environments. For more details, please contact us or download the catalog.

  • Safety and consumables
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Wild boar damage control method "InoSaver" *Free on-site survey available

Unlike fences and barriers, it reduces damage to the areas you want to protect without hindering the intrusion of wild boars!

The Japanese vegetation wild boar damage suppression method "Ino-Saver" features a surface without protrusions, allowing it to be opened up as a plaza. Even when disturbed by wild boars, it cannot be dug up to the roots due to the strong net. Since the roots are protected, the grass can recover even after being disturbed. You can also download PDF materials on construction methods and specifications from the link below! 【Features】 ■ Not dug up to the roots ■ Grass can recover ■ Connected installation of nets *We also conduct free on-site surveys. Please feel free to contact us.

  • inoseiba2.PNG
  • inoseiba3.PNG
  • inoseiba4.PNG
  • Earthworks
  • Pest and insect control products
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rainwater infiltration and foot pressure responsive square greening method "Grasstrong" *Free on-site survey

A structure that secures the root growth layer, preventing compaction from foot traffic! Usable as a lawn area accessible for people and vehicles.

The Japanese vegetation pressure-resistant square greening method "Grasstrong" is suitable for parks and schoolyards. By filling the voids of No. 4 crushed stone with a strong underlayer and sand, the roots of the grass can extend down to the sub-base layer, allowing the grass surface to demonstrate high recovery power even if it is damaged. You can also download PDF materials on construction methods and specifications from the link below! 【Features】 ■ Strong against stress ■ Improved water retention and nutrient retention ■ Strong against pressure ■ High recovery ability *We also conduct free on-site surveys. Please feel free to contact us.

  • gurahutorongu_c1-960x720.jpg
  • gurahutorongu_c2-960x720.jpg
  • gurahutorongu_a1-960x720.jpg
  • Other park materials
  • Wall and rooftop greenery
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ring unit type rockfall prevention method Rope installation "Ring Rope"

Units can be delivered one piece at a time! They can be divided into smaller portions, saving the hassle of cutting ropes.

The "Ring Unit Type Rockfall Prevention Method" is a technique that processes wire ropes into a ring shape and connects multiple units to prevent rockfalls. We offer a lineup of "Ring Rope" for rope laying works and "Ring Cover" for rope covering works. During the sliding of rockfalls, the unit with a connected ring structure disperses stress, preventing excessive load from concentrating on a single wire rope. 【Features】 ■ Excellent transportability of materials ■ Stress is distributed throughout ■ Reduces dangerous work on site *For more details, please download the PDF or feel free to contact us.

  • 4a.PNG
  • 4b.PNG
  • 4c.PNG
  • 4d.PNG
  • Earth retaining wall/foundation reinforcement
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Tezak Super Lock Method

Three types are available: net type, close-contact type, and G-spec! You can choose according to the site conditions.

The "Tezak Super Lock Method" is a technique that suppresses the initial movement of scattered boulders and loose stones on slopes by utilizing the flexibility of wire ropes and the restraining and supporting forces of anchors. We offer three types: "Tezak Super Lock <Net Type>", "Tezak Super Lock <Close Contact Type>", and "Tezak Super Lock G-spec". This method can be selected from the above three types according to the site conditions. 【Features】 ■ Helps stabilize loose stones scattered over a wide area of the slope ■ Does not compromise the natural landscape ■ Compatible with most terrains ■ Reduces the need for land acquisition for projects *For more details, please download the PDF or feel free to contact us.

  • 5a.PNG
  • 5b.PNG
  • Earth retaining wall/foundation reinforcement
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] (Private) Rockfall prevention measures for slope restoration work at temples and shrines.

The soil type is clayey soil, rock masses, and pebbles, with examples of restoration work in a 250m² area!

We would like to introduce a case where our "Tezak Super Lock (G-spec)" was used in the restoration work of the slope at Kinkai Komyoji Temple. This project was commissioned privately and carried out in Kyoto Prefecture. The soil types included clayey soil, rock masses, and cobblestones, covering an area of 250m2 for the restoration work. This method is designed to suppress the initial movement of scattered boulders and floating stones on the slope by utilizing the flexibility of wire ropes and the restraining and supporting power of anchors. [Case Overview] ■ Project Name: Restoration Work of the Slope at Kinkai Komyoji Temple ■ Location: Kyoto Prefecture ■ Construction Date: May 2022 (Year 4 of Reiwa) ■ Area: 250m2 ■ Soil Types: Clayey soil, rock masses, cobblestones *For more details, please refer to the related links or feel free to contact us.

  • 18a.PNG
  • 18b.PNG
  • Rockfall prevention agent
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Andersen Park Dog Run. Measures against stress from feces, urine, and foot pressure.

An example of a construction method that secures a root growth layer and prevents compaction due to foot traffic!

In the 2014 fiscal year, we would like to introduce a case where the pressure-resistant green space greening method "Grass Strong" was implemented at the Andersen Park dog run. This product was chosen because it is resilient to stress from urine and feces, as well as foot traffic. Its safety due to the absence of protrusions on the surface and the ability to prevent excavation with the GS net also make it suitable for dog runs. 【Case Overview】 ■ Project Name: 2014 Andersen Park Dog Run ■ Location: Chiba Prefecture ■ Construction Date: February 2014 ■ Area: 3,100 m² ■ Purpose: Park *For more details, please refer to the related links or feel free to contact us.

  • 19-2.jpg
  • Other park materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Animal Guard Construction Method <Construction Procedure>

Can be used in conjunction with frame construction and vegetation sheet construction! There is also a type for boar prevention.

Our company implements the "Animal Guard Method," which involves installing vegetation mats and sheets tailored to specific locations and situations. After installation, height keepers are placed at regular intervals on top, and the sky cross net is deployed over the installed height keepers. The wire mesh is connected using a dedicated sky coil, ensuring that the sky cross net is maintained at a certain height, completing the installation. 【Installation Steps】 ■ Laying vegetation mats and sheets ■ Installing height keepers ■ Deploying wire mesh ■ Connecting wire mesh ■ Completion of installation *For more details, please download the PDF or feel free to contact us.

  • ?アニマルガード工 画像2.png
  • ?アニマルガード工 画像3.png
  • ?アニマルガード工 画像4.png
  • ?アニマルガード工 画像5.png
  • ?アニマルガード工 画像6.png
  • ?アニマルガード工 画像7.png
  • Planting work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Wildlife Damage Prevention Method "InnoSaver"

A strong net! The surface is free of protrusions and can be opened up as a square.

"InnoSaber" is a wildlife damage prevention method for grassy areas that, unlike fences or barriers, does not hinder wild boar intrusion while reducing damage to the areas you want to protect. It is made of grass intertwined with a sturdy net, and since the nets are connected during installation, the entire area remains unified and cannot be easily overturned. Even if wild boars dig up the area, the strong net prevents them from uprooting the roots, thereby protecting them, which allows the grass to recover even after being disturbed. 【Features】 ■ Roots are not uprooted ■ Grass can recover ■ Reduces damage to protected areas without hindering wild boar intrusion *For more details, please download the PDF or feel free to contact us.

  • ?イノセイバー 画像2.png
  • ?イノセイバー 画像3.png
  • ?イノセイバー 画像4.png
  • ?イノセイバー 画像5.png
  • Pest and insect control products
  • Civil Engineering Method
  • Landscaping materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Integrated parking lot greening method "Tafutafu Park" for roadbed layers.

The turf protection material protects the grass from damage caused by vehicle compaction and abrasion!

"Tafutafu Park" is a green parking lot designed to prevent soil compaction from vehicle pressure and to secure a growth layer for roots, maintaining the grass. The grass uses Kyoryokka 21, which demonstrates high effectiveness against the high temperatures and dryness of the parking lot. Additionally, by incorporating a sand cushion layer, it improves drainage and provides a leveling function. 【Features】 ■ Resistant to stress ■ Improved drainage ■ Enhanced water retention and nutrient retention ■ Can be counted towards green space area ■ Strong against compaction *For more details, please download the PDF or feel free to contact us.

  • ?タフタフパーク 画像2.png
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rainwater infiltration and compaction-resistant square greening method "Grasstrong"

The surface is free of protrusions and is safe! It can be used as a grassy area accessible to people and vehicles.

"Grastro Long" is a type of green space landscaping method designed to prevent soil compaction due to foot traffic, featuring a structure that secures the root growth layer. Thanks to the reinforcing effect of the GS net, it distributes the load and minimizes the formation of ruts. It maintains a lawn area that can accommodate temporary vehicle access and foot traffic. Additionally, there are no protrusions on the surface, allowing it to be used as a lawn area accessible to both people and vehicles. 【Features】 ■ Strong against stress ■ Strong against foot traffic ■ Improved water retention and nutrient retention ■ High recovery ability *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Comprehensive Catalog of Rockfall Prevention Measures

Various construction methods, including ring unit-type rockfall prevention works and Tezak super lock method, are featured!

This catalog provides an overview of the rockfall prevention methods handled by our company. It includes a selection flowchart for rockfall prevention methods, as well as a wealth of information on rockfall prevention, rockfall protection, and slope failure measures. Please make use of this information for selecting methods. [Contents] ■ Selection Flowchart for Rockfall Prevention Methods ■ Rockfall Prevention ■ Rockfall Protection ■ Slope Failure Measures *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Animal Guard Construction Method <Wild Boar Prevention Type>

We are just laying down special wire mesh to deal with the problem of wild boars digging up the ground!

Introducing the "Animal Guard Method" provided by Nippon Shokusei Co., Ltd. This is a special wire mesh installation method designed to prevent the expansion of erosion and small landslides caused by damage from wild boar digging in flat and sloped areas. Additionally, the wire mesh has been specially processed at the intersections to prevent misalignment. It can simply be laid down in areas troubled by wild boar digging. 【Features】 ■ Intersections do not misalign ■ Prevents erosion expansion and small landslides ■ Wild boar countermeasure type *For more details, please download the PDF or feel free to contact us.

  • Pest and insect control products
  • Slope protection material
  • Landscape Design
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Proposal and services (on-site survey → soil analysis → construction method consideration → proposal document preparation)

Free Service [Research, Analysis, Proposal] We visit the site in person and, taking into account various on-site conditions, provide the best proposals for solving issues and concerns.

We consistently propose optimal construction methods based on various factors, including soil hardness and acidity (soil pH) that affect plant growth, slope gradient, soil type, degree of weathering, and crack spacing, as well as local conditions and environment, from field surveys to the preparation of proposal documents. ■ Soil Analysis System by Nichi-Shoku We send local soil samples to a dedicated lab and analyze 17 items related to chemical and physical properties that significantly impact plant growth. - [Risk Assessment] Whether sulfides are present, or if there is a risk of a rapid decrease in soil acidity (pH) after slope construction, etc. - [Soil Evaluation] Whether soil improvement or neutralization treatment with lime or other materials is necessary, etc. ■ Field Survey ■ Construction Method Proposal ■ Troubleshooting We offer these services for free!! Please feel free to contact us!! Which construction method should I choose? Is the method I am considering okay? I want to discuss everything from the frame to the embankment! Acidic soil has appeared! After soil improvement (with cement, etc.), it became alkaline! I want to take measures against deer trampling and damage! It was supposed to be greening, but it has withered... And more! With a network of 20 locations nationwide (including group companies), we support each individual site.

  • Slope protection material
  • Soil improvement material
  • Other civil engineering services
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Securing green space through "parking lot greening" that balances factory location law compliance and business continuity.

Do not give up on expanding or renovating the factory due to 'insufficient green space' or 'insufficient site area.' While utilizing the existing parking lot, ensure the green space is secured without halting operations.

This is a greening method that can secure green space, which tends to be insufficient in response to the Factory Location Act, by utilizing existing parking lots. It addresses the need for green space during expansion, renovation, and equipment updates, thereby reducing the risk of business continuity disruptions. It is a new green space development solution that balances legal compliance and business continuity. ■ Features - Effective in securing green space under the Factory Location Act - Smoothly promotes expansion, renovation, and equipment investment plans - Durable green parking lots with roots extending to the subgrade - There are types that can be installed over existing pavement - Reduces construction burden and waste disposal without the need for removal of existing pavement or handling of surplus soil - Can be implemented without stopping operations ■ Environmental and Added Value - High rainwater infiltration performance allows for the suppression of rainwater runoff - Contributes to reducing environmental impact and green infrastructure *For details, please refer to the PDF materials available by downloading the "Catalog."

  • NS路盤1.jpg
  • NS路盤5.jpg
  • NS路盤6.jpg
  • NS路盤4-1.jpg
  • NS路盤7.jpg
  • NS路盤9.jpg
  • NS路盤2.jpg
  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Landscape Design
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

We propose construction methods that enhance lightweight design, wind resistance, and seismic performance using a variety of roofing materials and roofing work.

From the restoration work of important cultural properties such as Tokyo Station to the roofs and walls of private homes, we handle it all! The skilled craftsmanship using advanced techniques is one of our strengths!

Our company is a roofing contractor that has been in business for over 100 years, dating back to the Taisho era. We handle a wide variety of products, including Japanese tiles, imported tiles, natural slate, and resin roofing materials. Most of the products we offer are made from natural materials that are environmentally friendly and contribute to the SDGs. With the construction methods we have developed over many years as a roofing contractor, we propose original techniques for lightweight construction, wind resistance, and seismic performance. Our skilled craftsmen work with high technical expertise, handling everything from restoration work on historically significant cultural properties to roofing and walls for private homes. *For more details, please refer to the PDF materials or feel free to contact us.*

  • Waterproofing work
  • Roof and gutter construction
  • Insulation work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Input tile

We have both large and small tiles available! A diverse selection of tiles from around the world.

Our company handles not only domestic tiles in Japan but also "imported tiles" from around the world. We offer a diverse lineup, including Western-style tiles from France and Spain, as well as Asian tiles from China and South Korea. We have options such as the "Omega 10," which can make buildings look dynamic with its large tiles, and the "Lapis Tile," used in places like the Forbidden City in Beijing. 【Partial Lineup】 ■ France S-shaped tile Omega 10 ■ France F-shaped tile Alp 20 ■ France Plate tile ■ Spanish tile BORJA TECH ■ Spanish tile FLAT 10 *For more details, please download the PDF or feel free to contact us.

  • 1.png
  • 2.png
  • 3.png
  • 4.png
  • 5.png
  • 6.png
  • 7.png
  • 8.png
  • Metal roof tile
  • Cement roof tile
  • Clay roofing tiles
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Agricultural Waterway Rehabilitation Method "AG Mortar Lining Method"

Introducing a mortar lining method for agricultural waterway rehabilitation that boasts excellent abrasion resistance and high durability!

The "AG Mortar Lining Method" involves applying a high-durability polymer cement mortar to the surface of structures that have been worn or eroded in agricultural water channels, aiming to restore and enhance functions such as smoothness (roughness coefficient) and water tightness. It can be applied to various wear and cross-sectional defects that occur in agricultural concrete channels, improving the roughness coefficient. By using "AG Primer," it can accommodate wet surface construction and ensure long-term integration with weakened existing channel structures. Additionally, the adhesive strength does not decrease even when exposed to water environments for extended periods. 【Features】 ■ Applicable to various wear and cross-sectional defects in agricultural concrete channels ■ Ensures long-term integration with weakened existing channel structures (using AG Primer) ■ AG Mortar can be used simply by mixing with the appropriate amount of water, requiring no special skills ■ Excellent wear resistance and high durability ■ Reinforcement of cross-sections is possible with the use of CFRP grid reinforcement *For more details, please refer to the PDF document or feel free to contact us.

  • Erosion control works
  • Other civil engineering works
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic resistance construction method "Buffer Chain (G Type)"

Surely mitigate the impact during an earthquake! A cushioning chain suitable for seismic reinforcement and bridge collapse prevention structures.

The "Buffer Chain (Type G)" is a chain-type bridge anti-fall device that can absorb shocks even under repeated loading. By using a shockless chain coated with rubber, it can reliably mitigate the impact during an earthquake. Even if the bridge has an angle, adjustments can be made by changing the number of links and the installation angle. Applications for skewed bridges can be discussed individually. 【Features】 ■ Reliable shock absorption during earthquakes ■ Installation position can be adjusted according to the situation of interfering objects ■ The size of the installation bracket can be reduced ■ Adjustments can be made by changing the number of links and the installation angle, even for bridges with angles *For more details, please refer to the PDF document or feel free to contact us.

  • Earthquake-resistant construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rust and Water Resistance Method "Clear Protect Method"

Excellent fluidity, capable of filling in detail! A transparent, highly weather-resistant waterproof material with excellent deformability.

The "Clear Protect Construction Method" is a technique that uses a transparent, highly weather-resistant waterproof material with excellent deformation performance for bearing rust prevention and gap waterproofing. The cured material is soft but can stand on its own. Since it is a transparent material, internal inspections are possible even after construction. 【Features】 ■ Transparent waterproof material with excellent deformation performance ■ Excellent fluidity, allowing for filling of fine details ■ High weather resistance due to silicone base ■ Cured material is soft but can stand on its own ■ Adhesive properties allow for re-adhesion even if the cured material breaks *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Reinforcement and repair materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Non-pick method

Acquisition of technical evaluation from the Japan Architectural Disaster Prevention Association! Introducing a seismic reinforcement method for columns using partial slits.

The "Non-Pick Method" is a seismic reinforcement method for columns using partial slits. Construction can be carried out while residents are living in the building, providing seismic reinforcement effects equivalent to complete slits. With our specially developed cutting machine (with a special bit), continuous and consistent construction from end hole drilling to groove cutting can be achieved in one setup. Additionally, it requires no chipping, has low vibration and low noise, and produces minimal waste with excellent precision. 【Features】 ■ Continuous and consistent cutting can be performed in one setup with the dedicated cutting machine ■ The accuracy and finish of the slits are outstanding ■ No chipping required, low vibration, low noise, and dust-free construction ■ Drilling and cutting debris is in a slurry form (liquid mixed with sand particles), making disposal easy ■ The construction efficiency for cutting is approximately 3 to 5 meters per day per machine for a width of 30mm and depth of 100mm *For more details, please refer to the PDF materials or feel free to contact us.

  • Reinforcement and repair materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Choosing construction methods that won't fail! Non-pick method <Seismic retrofitting edition>

It is now possible to carry out construction that was previously difficult! No chipping is required, and it can be done with low noise and dust-free construction.

Introducing the post-construction slit work "Non-Pick Method" for apartment buildings, office buildings, and more. The angled construction allows for easy installation behind pipes without the need to remove external piping. Additionally, a compact dedicated cutting machine can be used for easy installation in narrow spaces. This method reduces the burden on residents and offices, ensuring excellent results and construction precision. 【Features】 ■ Outstanding results and construction precision ■ Reduced burden on residents and offices ■ Safe work while occupied, ensuring safe passageways ■ No chipping required, low noise, and dust-free construction ■ Thin residual type complete slit with technical evaluation obtained ■ Years of trust and proven results *For more details, please refer to the PDF materials or feel free to contact us.

  • Earthquake-resistant construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super weather-resistant and super durable concrete finishing method 'RF REBORN Method'

Ultra weather-resistant and ultra-durable concrete finishing method using the Reflite method and water-based inorganic polymer paint.

The "RF REBORN method" is a technique that enhances the durability of exposed concrete economically, without compromising the material feel and texture of the concrete. Reinforced concrete structures, which have been considered permanent, can experience various forms of deterioration due to "neutralization" and "salt damage." This method involves repairing reinforced concrete structures that have already deteriorated using the "Refleet method," and then further protecting the surface with REBORN (a water-based inorganic polymer coating) to shield the concrete structure from various deterioration factors and maintain its aesthetic appeal. 【Features】 - By repairing with the Refleet method, the durability of the structure is improved. - REBORN forms a surface protective layer that excels in durability and weather resistance. - The synergistic effect of the Refleet method and REBORN protects concrete structures from various deterioration factors over the long term. *For more details, please refer to the PDF materials or feel free to contact us.

  • Reinforcement and repair materials
  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Repair and Reinforcement Method "RF Ductal Form Method"

Repair and reinforcement method using high durability thin-walled embedded formwork "Ductal Form" with ultra-high strength fiber reinforced concrete.

The "RF Ductal Form Method" is a repair and reinforcement technique that combines Ductal Form, which is expected to have ultra-long-term durability against various deterioration factors, with the Refleet Method, enabling the maximum service life for structures. In particular, it is effective in areas where complex deterioration occurs due to salt damage, carbonation, wear, and other factors. The construction involves implementing fundamental countermeasures against deterioration factors of existing structures using the Refleet Method, followed by placing Ductal Form as a surface material and integrating it with grout or similar materials. 【Features】 ■ Has sufficient strength and rigidity against loads such as lateral pressure during concrete placement as formwork material. ■ Achieves strong integrity, allowing consideration of cover for reinforcing bars and applicable as the effective cross-section of compression members. ■ Exhibits high resistance to salt damage, wear, freeze-thaw action, and carbonation. *For more details, please refer to the PDF materials or feel free to contact us.

  • Reinforcement and repair materials
  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Refleet Method "DS Specification"

For salt damage repair and rebar rust prevention! We will perform surface coating with "RF Rust Prevention Paste."

We would like to introduce the "DS Specification" of the Refleet Method. It consists of "chemical repair" using "RF-100" and "DS-400," and "physical repair" using "RF Rust Prevention Paste." It is suitable for reinforced concrete civil structures such as bridge piers, abutments, railings, and retaining walls that have been damaged by salt damage, as well as for preventive maintenance against salt damage in reinforced concrete. 【Features】 ■ Alkalinity enhancement and surface strengthening with "RF-100" ■ Rust prevention of reinforcing bars through diffusion penetration of "DS-400" ■ Surface coating with "RF Rust Prevention Paste" *For more details, please refer to the PDF materials or feel free to contact us.

  • Reinforcement and repair materials
  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration