Construction method Product List and Ranking from 1592 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Feb 18, 2026~Mar 17, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Feb 18, 2026~Mar 17, 2026
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. TRAWE main office Saitama//Other construction industries
  3. エルニード協会 Kagawa//Other construction industries
  4. 4 シーカ・ジャパン Tokyo//Building materials, supplies and fixtures manufacturers
  5. 5 水研 Shiga//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Feb 18, 2026~Mar 17, 2026
This ranking is based on the number of page views on our site.

  1. 建物外壁工事 ロープアクセス工法 TRAWE main office
  2. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  3. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 地下水・軟弱地盤対応の基礎工法『スーパーラップルエルニード工法』 エルニード協会

Construction method Product List

1951~1980 item / All 4292 items

Displayed results

Super Rappuru Basic Construction Method (El Nido Method) Technical Documentation

[NETIS Registration] An explanation of design policies, the bearing capacity of the underlying ground, and load levels, extracted from design documents!

On this page, we have published excerpts of technical materials on the Super Rappuru Foundation Method (El Nido Method). We provide detailed explanations on topics such as "the bearing capacity and load degree of the underlying ground for embankment," "immediate settlement amount," and "the calculation formula for the design standard strength Fc of the embankment." For more details, please check the related links. We encourage you to take a look. [Contents] ■ Design Policy ■ Bearing Capacity and Load Degree of the Underlying Ground for Embankment ■ Confirm that the immediate settlement amount SE is less than the allowable total settlement amount Sa ■ Determine the design standard strength FC of the embankment *For more information, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super Rappuru El Nido Method <Over 3,000 construction achievements nationwide>

Shortening the time from excavation to completion of land development! It is easy to confirm the supporting layer through visual inspection and palpation.

The "Super Rappuru Elniido Method" utilizes on-site excavated soil during construction, allowing for a reduction in disposal costs for excess soil. It addresses challenges such as the complexity of processes like excavation and formwork placement in methods like the Rappuru Method (concrete pouring), seeking a more simplified approach. This method enables a reduction in processes through direct excavation, leading to shortened construction periods and lower costs. Additionally, we are expanding our partnerships with major companies such as Shimizu Corporation, Kajima Corporation, and Takenaka Corporation, boasting over 3,000 construction achievements nationwide. 【Three Strengths】 ■ Shortened construction period and reduced costs ■ Easy verification of support layers and high quality ■ Minimal excess soil after construction *For more details, please download the PDF or feel free to contact us.

  • スクリーンショット 2025-04-14 15.27.36.png
  • スクリーンショット 2025-04-14 15.34.39.png
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Yamaguchi Prefecture! Super Rappu El Nido method.

[NETIS Registration] Achieving shortened construction periods and low costs! Capable of handling groundwater and soft ground!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation, as well as the setting up and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix design, construction management, and the development of mixing buckets, enabling us to create high-quality site development with minimal variation in strength. 【Features】 ■ Easy confirmation of the supporting layer ■ Shortened construction period and high-quality site development ■ Minimal surplus soil (disposal leftover amount) on site ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 掘削完了.JPG
  • 20230417-102358-815_387d96ea2b3c442d5485953ce0c40957.jpg
  • 地盤改良工事.JPG
  • フロー値.JPG
  • 現場コア写真.JPG
  • 施工後残土量.jpg
  • 水中養生.jpg
  • 圧縮試験機.jpg
  • 試験練り.JPG
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Column] Comparison of Other Construction Methods and Processes / The Reason for the Significantly Faster Construction Time

Comparison of construction methods and processes / The reason why the construction time is overwhelmingly fast.

Can we achieve an overwhelming reduction in construction time? ⬛︎Explanation 1: No "slurry production" (compared to cement milk/pile improvement) In the cement milk method and pile improvement, the process begins with "slurry production," where cement and water are mixed at a batch plant. In fact, this preparation alone takes about 90 minutes for a site using 30 tons of cement. The Super Rappu Elneed method eliminates this entire preparation process. Since the solidifying agent is directly inserted in its package, there is no need for a plant or slurry production. The insertion work that took 90 minutes is completed in just 5 minutes. ⬛︎Explanation 2: No "formwork assembly and dismantling" (compared to the Rappu method) In the Rappu method, after "excavation," "formwork assembly" is performed, and after the concrete hardens, "formwork dismantling" occurs. These tasks require specialized craftsmen and are time-consuming processes. The Super Rappu Elneed method utilizes the sides of the excavation hole as a substitute for formwork (earthen formwork), eliminating the entire series of tasks related to "formwork." This allows for reductions in work time, labor costs, and material costs.

  • 67ea78497424eed9679815a182c5a3db-1024x768.jpg
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

RC・S造のコストダウン事例。杭・柱状改良に次ぐ第三の選択肢

杭基礎より安価に、柱状改良より高強度に。「目視確認」ができる安心の地盤改良工法。NETIS登録・技術審査証明取得済み

従来の柱状改良工法で課題となっていた「品質のバラツキ」や「支持層確認の難しさ」を、全数フロー値管理と直接の目視確認によって解決しました。 場所打ち杭やラップルコンクリート工法と比較し、RC造7階建マンションの施工事例では「工期約15%短縮」「総コスト約10%削減」を実現。 砂質土で最大3000kN/m²の高支持力を実現し、大規模建築や重量物施設における基礎の小型化・経済設計に貢献します。 岩塊・巨礫混じりの難地盤や、地下水位が高い現場でも品質を確保できるため、諦めていた敷地での施工もご相談ください。 本資料では、従来工法との詳細なスペック比較、コストダウン事例、設計基準強度について解説しています。

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Joint Development with the Ministry of Land, Infrastructure, Transport and Tourism] Ground improvement with a site strength ratio of 1.0 or higher! Support layers visible.

Eliminating the "invisible" concerns of column improvement. Achieving both direct visual inspection of the support layer and a field strength ratio of 1.0 or higher. Comprehensive comparison table with conventional methods and design standard strengths.

This is a technical document aimed at preventing quality issues in ground improvement. It allows for direct visual confirmation of the "support layer," which has been difficult to verify with conventional columnar improvement methods. Furthermore, through strict slurry management, it achieves a strength ratio of "strength ratio ≥ 1.0," which is generally said to be around 0.2 to 0.8 (field test specimen strength / laboratory mix strength). Please take a look at this reliable quality management method developed in collaboration with the Ministry of Land, Infrastructure, Transport and Tourism and registered with NETIS. 【Contents】 Overview of the method and its reliability Challenges of conventional methods and the technical superiority of this method Design advantages and application conditions Features of quality management

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

屋根改修工法『ユニークルーフFit』

熱中症対策で関東圏でのカタログに載っている建材を使った施工をご紹介!

『ユニークルーフFit』は、屋根の形状に応じて断熱材を加工・納品する 屋根改修工法です。 屋内の厚さ軽減、雨漏り防止、屋根材の保護に好適。軽量な断熱材を屋根に 貼付け、スプレーウレタン防水の密着工法にて一体化。 また、断熱材の厚さ50・75・100mm、お客様の要求性能をふまえたご提案が 特長で、トップコートは標準色のほか、調色の対応も承っております。 【特長】 ■さまざまな屋根に適用できる改修工法 ■既設屋根の現状を元にオーダーメイド ■押出法ポリスチレンフォーム断熱材3種bA相当、熱伝導率0.028W/(m・K)以下 ■断熱材の厚さ50·75·100mm ■建築用塗膜防水材、高品質なスプレーウレタンを使用 ■屋根の全面をスプレーウレタンで覆う、安心の防水性能 ※詳しくはPDFをダウンロードしていただくか、お気軽にお問い合わせください。

  • Roof and gutter construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Work Schedule Creation AI System "Work Style Meister"

"Designing to work happily" - An AI system for creating work schedules born from a hospital.

The "Work Style Meister" is a tool designed to create a happier way of working. With AI automatically generating work schedules in a short time, it allows for the testing of various conditions to create the optimal schedule that balances work-life balance and service quality at a higher level. It also enables the management of daily task assignments, event participation, support, output of Form 9, and monitoring of nursing staffing standards. 【Features】 ■ Work preferences can be submitted from smartphones ■ AI automatically generates schedules in just a few minutes, considering work preferences and conditions ■ Management of daily tasks, event participation, support, etc. is possible ■ Creation of Form 9 and monitoring of staffing standards are possible ★ The "Nursing Staffing Meister" has been reborn as the "Work Style Meister" ★ While maintaining the screen layout and existing functions of the "Nursing Staffing Meister," performance has improved, and design and usability have been enhanced, allowing for use from a wider variety of devices. In addition to daily shift creation, time scheduling for tasks (scheduled for release in 2026) will be possible, and integration with other systems will be strengthened. *For more details, please download the PDF or feel free to contact us.

  • Shift Management System
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Exterior construction work

For exterior structures such as garages, fences, and entrances, leave it to us!

Our company provides exterior construction services with the motto of being careful and beautiful, aiming to enhance the appearance of buildings and improve functionality. We carry out various projects such as lightweight and earthquake-resistant block walls, painting, parking lot paving, and the installation of fences made from various materials, including resin and wood grain. Additionally, we handle formwork construction for creating molds before pouring concrete, as well as the handling of various materials and tools used in civil engineering sites. 【Construction Services】 ■ Block Walls ■ Parking Lots ■ Approaches ■ Terraces ■ Fences ■ Gate Posts and Gates *For more details, please download the PDF or feel free to contact us.

  • Gates, walls and fences
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Inorganic mineral composite modifier "Hardlex"

Effective in small amounts! A remarkable product that hardens soft soil and transforms it into strong soil.

"Hardlex" is an inorganic mineral composite modifier that improves handling and compaction density immediately after mixing with the target soil due to its instant water absorption effect and the modification effects of hydration reactions and agglomeration granulation. Additionally, it begins to generate a large amount of ettringite within a few hours of mixing, ensuring trafficability and initial strength, such as for heavy machinery, through the effect of linking soil particles. Furthermore, it continuously transitions into ongoing chemical reactions such as pozzolanic reactions and carbonation reactions, increasing its binding strength over time, leading to long-term stability. 【Features】 ■ Immediate effect ■ Cost-effective and quick construction ■ Achieves strength even in difficult-to-stabilize soils ■ Low alkalinity, environmentally friendly ■ Resistant to disasters such as earthquakes and heavy rain *For more details, please download the PDF or feel free to contact us.

  • Soil improvement material
  • Ground improvement
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

ASE-HR method

It is possible to neutralize the soil after modification! The hexavalent chromium leaching test is not required.

The "ASE-HR method" allows for the management of appropriate additive amounts while adjusting water content and pH levels. It enables improvements in strength and handling, and there is no need for hexavalent chromium leaching tests. Additionally, handling of the soil is improved from the mixing stage to immediately after, allowing for heavy machinery work to commence right away. [Features] - Enables improvements in strength and handling - No need for hexavalent chromium leaching tests *For more details, please download the PDF or feel free to contact us.

  • Soil improvement material
  • Ground improvement
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement RCI method

No need for concrete replacement! Ground construction can be done without stopping operations.

We would like to introduce our "Ground Reinforcement RCI Method." Floor construction that would normally take one month if redoing the concrete can be completed in approximately 1 to 2 days. The construction period is shorter, reducing costs to about two-thirds, and the load-bearing capacity of the concrete increases by 1.5 times. Please feel free to contact us when you need our services. 【Features】 ■ Short construction period ■ Low cost ■ High quality *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Ground improvement
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Off-site construction method for air conditioning equipment "Vispaire Frame"

Since it can be delivered using a dedicated cart, the packaging material is limited to minimal protection, and individual material arrangements are not necessary!

The "Bispire Frame" is an off-site construction method for air conditioning equipment that significantly reduces on-site work time, contributing to shorter construction periods. By streamlining the workforce on-site and shortening the construction period, costs are reduced. Multiple contractors (for equipment installation, ductwork, and insulation) can be handled by a single contractor. Additionally, since it can be transported in unit form, the hassle of gathering related materials at a cluttered storage area is eliminated. **Benefits of Off-Site Production of Air Conditioning Equipment** - Shortened construction period - Standardization of quality - Space-saving on-site - Cost reduction - Safety for workers - Environmentally friendly construction site *For more details, please download the PDF or feel free to contact us.*

  • Earthquake-resistant construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Off-site construction method for air conditioning equipment "A Frame"

The adoption of the slab attachment enables the offset of the insert and the hanging bolt!

The "A Frame" is an off-site construction method for air conditioning equipment aimed at concealed PAC (package air conditioning) and FCU (fan coil units). Even if insert differences occur, the slide function of the main beam and sub-beam allows for the adjustment of the position of vibration-proof fittings (suspension bolts). Since the position of the suspension bolts can be aligned, the installation of post-construction anchors can be omitted. Additionally, by pre-packaging related materials such as bracing fittings and suspension bolts, the time spent searching for parts can be eliminated, significantly reducing on-site work time. 【Points】 ■ Improved seismic resistance ■ Cost reduction + shortened construction period ■ Cost reduction + increased productivity ■ Quality improvement ■ Enhanced safety + shortened construction period *For more details, please download the PDF or feel free to contact us.

  • Earthquake-resistant construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SCFR method

For preventing root rot of steel pipe columns such as lighting poles, sign poles, utility poles, pedestrian bridges, park playground equipment, and buildings!

The "SCFR method" is a repair and reinforcement technique that enables long lifespan through stable "prevention of external corrosion and increase in plate thickness" using SCFR sheets made of carbon fiber. By using a lattice-like carbon fiber reinforced plastic sheet, grease-like epoxy resin, and epoxy resin that can bond firmly with steel plates, it exhibits strong adhesion and bonding strength. It theoretically demonstrates an "increase in plate thickness effect of (0.4mm × number of sheets)" and ensures the necessary load-bearing capacity. 【Features】 ■ Corrosion prevention effect ■ Load-bearing capacity increase effect (plate thickness can be increased) ■ Performance stability effect (high-quality construction is possible) *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

UVPPS method

Repair steel and concrete structures with a UV-curable FRP sheet that is difficult to peel off and has excellent workability!

The "UVPPS method" is a repair technique that involves adhering FRP sheets with adhesive and curing them with ultraviolet light. Using a translucent sheet and a defoaming agent makes high-precision defoaming easy. During defoaming, the adhesive fills the gaps, eliminating the need for unevenness adjustment and accommodating the sheet's irregularities. In impact resistance tests for construction substrate adjustment coatings, there were no cracks, damage, or sheet peeling. The construction guidance system provided by association members ensures stable construction quality. 【Features】 ■ Stable adhesion ■ High durability ■ Stable adhesive strength ■ Reduced and integrated processes ■ Butt joint construction ■ Shortened curing time *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Two-Way Lining Method

The maximum bending angle of the bend pipe can be constructed up to 90°! Large diameter and long-distance construction are also possible.

The "Two-Way Lining Method" is a technology for rehabilitating aging pipelines safely and quickly without excavation. It is compatible with seismic levels 1 and 2, and the maximum bending angle of the bend pipe can be constructed up to 90°. Additionally, by using hot water, it allows for uniform curing without inconsistencies, resulting in high-quality rehabilitation, and significantly improves flow capacity due to enhanced roughness coefficients. 【Features】 ■ Structural design tailored to the purpose of water supply and drainage, agricultural and industrial water pipelines, etc. ■ Compatible with seismic levels 1 and 2 ■ Maximum bending angle of the bend pipe can be constructed up to 90° ■ Capable of large diameter and long-distance construction ■ High-quality rehabilitation possible due to uniform curing with hot water *For more details, please download the PDF or feel free to contact us.

  • Pipeline Construction
  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Precast concrete residual formwork method

Ensuring safety in underwater construction and the ability to plan offshore construction, which is easily affected by weather and sea conditions, is possible!

The "Precast Concrete Residual Formwork Method" is a technique that utilizes precast concrete formwork as part of the structure to efficiently and safely implement underwater concrete "belly work" for maintaining, improving, or enhancing the performance of existing facilities such as gravity-type berthing structures (quays and wharves) made of concrete. This method allows for phased construction underwater, offering advantages in terms of shortened construction periods and safety. Additionally, by using precast concrete residual formwork as a method for extending the lifespan of fishing port facilities, it addresses the challenges associated with traditional underwater construction, contributing to improved construction efficiency and worker safety as a standard method. 【Features】 - Requires less workspace since large-scale formwork assembly and post-construction removal work on land are unnecessary. - Reduces the width of the belly work of the structure, thereby decreasing the amount of underwater concrete required. - Enables a reduction in construction time. *For more details, please download the PDF or feel free to contact us.*

  • Renovation and repair methods
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Dynamic Resin Strong Guard U Coat Method

We would like to introduce the concrete surface protection methods that we handle!

The "Dynamic Resin Strong Guard U Coat Method" is a construction method that complies with the "Construction Management Guidelines for Structures of East Japan, Central Japan, and West Japan Expressway Companies 3-6 Concrete Surface Protection." The process includes substrate treatment, primer application, putty material application, intermediate coating application, and top coating application. Please feel free to contact us when you need our services. 【Composition】 ■ Finishing material (top coat) "JDB-450U" ■ Main material (intermediate coat) "JDB-430" ■ Unevenness adjustment material (putty) "JDB-420" ■ Substrate treatment material (primer) "JDB-410" ■ Concrete surface *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

RT One Guard Clear Method

The incredible performance achieved by the one-component high-strength urethane coating!

The "RT Wangard Clear Method" is a technique that allows for "concrete protection" and "spalling prevention" simply by applying it without using continuous fiber sheets. It possesses various concrete protection capabilities such as salt resistance, carbonation prevention, and crack-following properties, and it also complies with the "push-out test." Since the resin is transparent, the deterioration condition of the concrete structure can be visually assessed after application. 【Features】 ■ Visualization of deterioration condition ■ Significant reduction in construction time ■ Excellent performance in concrete protection *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Multi-mole method

Sewer main and connection pipe work with limitless functionality! Vertical and horizontal connections are extremely easy and speedy.

The "Multi-Mole Method" is a technique developed by Sato Iron Works that mechanizes horizontal pushing and vertical excavation using "TonTon-kun" and "BuruBuru-kun." In addition to standalone use, it also allows for the joining of horizontal and vertical sections. This method significantly improves labor efficiency, safety, and construction quality. Please feel free to contact us if you have any inquiries. 【TonTon-kun Features】 ■ More cost-effective than conventional pushing methods ■ Capable of construction at one location per day ■ Strong against gravel-mixed ground due to impact pushing ■ Can be pushed from an open-cut trench (effective width of 900mm) *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Scaffolding Method "GS System"

A groundbreaking system born from the needs of the field!

The "GS System" is a highly functional new scaffolding method that achieves GOOD SAFETY. Its structure, which has fewer clamps, allows for safe and speedy work. Scaffolding can be assembled easily, creating a faster and more comfortable working environment. Additionally, it is possible to lay panels seamlessly not only on straight beams but also on curved beams and pot beams. 【Features】 ■ Safe and speedy work due to a structure with fewer clamps ■ Compatible with conventional equipment and methods, thus improving work efficiency ■ Flexible adaptation to curved beams and pot beams, allowing for both panel assembly and disassembly *For more details, please download the PDF or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Existing tunnel backfill injection method "NEW Set Form NF Method"

The NEW Set Form NF method is a construction technique that offers excellent safety during installation, as well as preventing volume shrinkage of the foam after filling, making it a "safe," "reliable," and "high-performance" method!

The "NEW Set Form NF Method" is a backfill injection method that fills the voids behind the lining concrete in repair work for existing tunnels using a rigid foam polyurethane called "Set Form." It was newly registered with the Ministry of Land, Infrastructure, Transport and Tourism's New Technology (NETIS) in December 2024 (KT-240144-A). 【Features of the NEW Set Form NF Method】 - Over 1,000 successful cases using 40 times expanded polyurethane. - Responsible construction system supported by more than 30 member companies. - The average increase rate of final injection volume is 132%, making it economical. - Uses HFO (hydrofluoroolefin) as a foaming agent, an environmentally friendly non-fluorine product. - Improved dimensional stability due to HFO remaining stable within the foam. - Possesses isocyanurate bonds and uses HFO as a foaming agent, achieving high thermal decomposition temperature and low internal temperature to prevent smoking accidents. - Compact injection equipment eliminates the need for wide access routes or land. - Can be operated with batteries, making it suitable for narrow construction sites. *For more details, please download the PDF or feel free to contact us.

  • Reinforcement and repair materials
  • Tunnel Materials
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Dry protection method for waterproof rising parts

A method born from viewing many of the issues faced by traditional methods from a new perspective!

I will introduce the "Waterproof Vertical Upstand Dry Protection Method" that we handle in this meeting. This is a systematized method that primarily uses high-strength extruded cement boards and other materials with excellent weather resistance and waterproofing properties to protect the waterproof layer of vertical upstands on rooftops. By systematizing the components, we have achieved many benefits, such as shortening construction periods, facilitating maintenance of the waterproof layer, and improving aesthetic quality. 【Features】 ■ Clarification of functions and required performance ■ Rationalization of construction ■ Insulation between the movement of the pressure layer and the waterproof layer ■ Response to inspections and maintenance repairs *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Exterior wall composite renovation method

It is also possible to create a highly transparent composite layer using transparent resin, while preserving the design of the existing tile surface!

This method is applied to the renovation of deteriorated mortar-finished exterior walls and tile-finished exterior walls. It is a renovation method that uses polymer cement-based coatings along with fiber nets or transparent resin-based paints and anchor pins, and is also referred to as the pin-net method. By combining anchor pins and fiber nets while keeping the existing exterior finishing layer intact, it ensures safety against peeling by preventing the finishing layer from falling off with the anchor pins and integrating the existing finishing layer with the fiber nets. 【Business (Partial)】 ■ Research, development, and improvement of this method ■ Investigation, verification, and evaluation of this method ■ Promotion of this method ■ Education and guidance related to construction techniques and construction management techniques ■ Planning, drafting, operation, and implementation of various study groups, training sessions, and site visits *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

ARUR Method: A Long-Life Technology for Asbestos-Containing Slate Roofs

Maintenance-free for 30 years, enabling the long lifespan of factories! This construction method has excellent cost performance and features waterproofing and heat insulation functions.

The "ARUR (Asbestos Roof Urea Renewal) method" is a system that achieves long lifespan and maintenance-free protection for asbestos-containing slate roofs over a period of 30 years. To achieve this, we used advanced one-component reaction-curing urea resin paint. By applying the one-component reaction-curing urea resin paint as a topcoat, a coating with an expected lifespan of 30 years is formed. Additionally, it is an environmentally considerate system that prevents the release of asbestos into the external environment during the process. 【Features】 ■ It becomes maintenance-free for 30 years, allowing for the long lifespan of the factory. ■ A cost-effective method that possesses waterproofing and heat insulation functions. ■ Environmentally considerate asbestos treatment prevents issues with neighboring residents. *For more details, please download the PDF or feel free to contact us.

  • Roof and gutter construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pressure-resistant plate construction method

One of the construction methods to consider when a hard ground is located at a shallow depth!

The "pressure-resistant plate method" is a technique for correcting the sinking of buildings by installing a pressure-resistant plate under the foundation and lifting it with a jack. It can be used in narrow spaces, and it allows residents to continue their daily lives during construction. This is one of the methods considered when a hard ground is located at a shallow depth. Please feel free to contact our company when you need assistance. 【Main Benefits】 ■ Can be used in narrow spaces ■ Allows normal living during construction *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Side pinning method

Just like underpinning, adjust the building's level with hydraulic jacks!

We would like to introduce our proposed "Side Pinning Method." This method involves driving piles into the ground around the foundation's perimeter using a pile driver, and inserting steel pipes until reaching a hard and stable ground. The building is supported by brackets. Similar to under-pinning, the building's level is adjusted using hydraulic jacks. 【Main Benefits】 ■ Construction is possible even if further settlement is expected ■ Can be implemented in narrow spaces ■ Normal living can continue during construction *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

PVC sheet waterproofing method with metal substrate specification

We can carry out construction for both new builds and renovations! We are also capable of working on factories, large stores, and warehouses.

Our company offers the "PVC Sheet Waterproofing Method with Metal Base Specification," which combines the characteristics of metal substrate fire-resistant roofs and PVC sheet waterproofing. This method eliminates the need for on-site poured concrete for the roof waterproofing substrate, allowing for the construction of a highly insulated and flat rooftop, while also achieving shortened construction periods and reduced roof weight. Additionally, it provides significant total cost benefits, allows for the design of low-slope roofs, and ensures a waterproof responsibility construction system. 【Features】 ■ No need for on-site poured concrete for roof waterproofing substrate ■ Ability to construct a highly insulated and flat rooftop ■ Shortened construction periods and reduced roof weight ■ Significant total cost benefits ■ Capability to design low-slope roofs, along with a waterproof responsibility construction system *For more details, please download the PDF or feel free to contact us.

  • Roof and gutter construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sky Method / Fit Method

Stay cool and comfortable in summer, and protect against the cold in winter! Significantly reduce heat from drying ovens and machines.

Our company offers the "Sky Method" and "Fit Method," which utilize our aluminum thermal barrier sheet "Thermo Barrier" with a purity of 99% for installation on roofs and drying ovens, enabling reductions in electricity costs. The "Sky Method" for factories and stores involves the installation of sky sheets made from aluminum foil, which excels in reflecting radiant heat, ensuring uniform thermal insulation effects regardless of the skill level of the workers or the weather conditions during installation. Additionally, the "Fit Method" for drying ovens and machinery is designed with high-temperature glass cloth specifications, making it suitable for heat protection from furnaces and machinery. This method results in increased productivity and energy-saving effects. **Features of Thermo Barrier Fit:** - Non-combustible certified sheet - Heat-resistant with a thickness of 0.2mm - Can be sewn together (sheet joining processing) - Expected heat protection and energy-saving effects *For more details, please download the PDF or feel free to contact us.*

  • Heat insulation and heat shielding methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration