Construction method Product List and Ranking from 1590 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Apr 08, 2026~May 05, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Apr 08, 2026~May 05, 2026
This ranking is based on the number of page views on our site.

  1. ネプラス工法全国会 本部 Niigata//General contractors and subcontractors
  2. 成瀬化学 Mie//Building materials, supplies and fixtures manufacturers
  3. 徳和工業 Miyagi//Other construction industries
  4. 4 コンステック Osaka//General contractors and subcontractors
  5. 5 TRAWE main office Saitama//Other construction industries

Construction method Product ranking

Last Updated: Aggregation Period:Apr 08, 2026~May 05, 2026
This ranking is based on the number of page views on our site.

  1. 側溝修繕工法『ネプラス工法』<施工前後の写真付き資料進呈> ネプラス工法全国会 本部
  2. Waterproof layer renovation method for achieving the long lifespan of facilities! Narlite injection method. 成瀬化学
  3. Vacuum concrete construction method 徳和工業
  4. 4 建物外壁工事 ロープアクセス工法 TRAWE main office
  5. 5 D-Lite D Board Method [Non-combustible decorative panel that can be processed on-site] 大建工業

Construction method Product List

1921~1950 item / All 4301 items

Displayed results

ASL method (tile and stone anti-slip construction)

To reduce "slipping and danger," make wet and slippery tiles or stones less slippery. Non-coating anti-slip treatment for floors.

The "ASL Method" is a technique that involves applying a liquid agent to flooring materials (tiles and stone) to dissolve specific components, creating countless micro-holes (a few micrometers, or thousandths of a millimeter) on the surface of the tiles or stone. The difference before and after construction is simply whether there are "holes on the surface of the floor." When a person walks on it while wet, their weight compresses the water, making it harder for the water to move, which reduces the likelihood of slipping. Tiles and stone surfaces wear down over time, gradually eliminating the holes; however, as long as there are holes, the effect will last if the floor surface is properly cleaned. Please feel free to contact us. 【Features】 ■ Maintains aesthetic appeal ■ No need to replace flooring materials ■ Quick installation ■ Easy maintenance ■ Free test installation available ■ Up to 5-year warranty Main applications: Commercial facilities, public facilities, train stations, elementary schools, temples and shrines, private companies, bathing facilities, nursing homes, apartments, hotels Main installation locations: Entrances, store aisles, hallways, large baths, poolside, restrooms Cumulative installation record: Over 208,000 m² (as of August 31, 2022) *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

ASL Method for Hotels and Inns (Tile and Stone Anti-Slip Construction)

To reduce "slipping and danger," make wet and slippery tiles or stones less slippery. Non-coating anti-slip treatment for floors.

The "ASL Method" is a technique that involves applying a liquid agent to flooring materials (tiles and stone) to dissolve specific components and create countless holes measuring several micrometers (thousandths of a millimeter) on the surface of the tiles or stone. The difference before and after construction is simply whether there are "holes on the surface of the floor." When a person walks on it while wet, their weight compresses the water, making it harder for the water to move, which reduces the likelihood of slipping. We support the safe and user-friendly operation of facilities by applying this method in slippery areas such as bathing facilities within buildings and entrance lobbies. 【Features】 ■ Maintains aesthetic appeal ■ No need to replace flooring materials ■ Quick installation ■ Easy maintenance ■ Free test installation available ■ Up to 5-year warranty Main application projects: commercial facilities, public facilities, train stations, elementary schools, temples and shrines, private companies, hot spring facilities, nursing homes, apartments, hotels Main application locations: entrances, store walkways, corridors, large bathing areas, pool sides, restrooms Cumulative construction achievements: over 208,000 m² (as of August 31, 2022) *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【For Educational Facilities】Non-visible Anti-Slip Construction ASL Method

To reduce slips and hazards in the educational environment...

The "ASL method" is a technique that involves applying a liquid agent to flooring materials (tiles and stone) to dissolve specific components, creating countless holes measuring several micrometers (a few thousandths of a millimeter) on the surface of the tiles or stone. The difference before and after construction is simply whether there are "holes on the surface of the floor or not." When a person walks on the wet surface, their weight compresses the water, making it harder for the water to move, which reduces the likelihood of slipping. This method is applied in slippery areas such as school hallways, stairs, and entrances to support safety and security in educational environments. 【Features】 - Maintains aesthetic appeal - No need to replace flooring materials - Quick installation - Easy maintenance - Free test installation available - Up to 5-year warranty Main applications: Educational facilities from kindergartens to universities Main application areas: Entrances, hallways, stairs, pool sides, restrooms Applicable flooring materials: Tiles, stone, artificial polished stone *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

25t Large Vehicle Compatible Road Widening Method "Bridge Plus Alpha"

Achieved a weight reduction of approximately 400kg/m and an expansion of up to 100cm on one side.

"Bridge Plus Alpha" is a road widening construction method that accommodates the era of 25-ton large vehicles, achieving both widening and weight reduction simultaneously. Compared to conventional concrete widening, it realizes a weight reduction of about 400 kg/m (one example). The width increases by 100 cm (one example). Moreover, reinforcement of girders and piers is unnecessary. Additionally, the construction period can be completed within 7 days for 100 meters, making it a groundbreaking method with numerous advantages. [Features] ■ Road widening is possible up to a standard of 1,000 mm on one side. ■ Ensures high corrosion resistance due to JIS H 8641 hot-dip galvanized coating, with high-precision factory-manufactured products. ■ Secures vehicle deviation prevention performance suitable for 25-ton (240 kN) large vehicles. ■ Weight reduction to about 1/3 of reinforced concrete pavement. *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reinforced Soil Wall Method "Tail Arm Method"

We protect the infrastructure that supports the foundation of our land with reliable technology.

Our company offers the reinforced earth wall method "Taille Armé Method." With the introduction of this method, even when earth pressure is applied, the friction resistance between the soil and the strips (steel reinforcement materials) restrains the movement of the soil, allowing for the construction of stable vertical embankments in a short period of time. It is used in many locations such as roads (general and expressways), railways, rivers, coastlines, and land development (residential areas, parks, schools, industrial facilities), among others. 【Features】 ■ Strong against disasters (earthquakes and floods) due to its resilient structure ■ Versatility to accommodate various applications ■ Simple components for easy construction ■ High repairability and ease of maintenance *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Retaining Wall Health Assessment Service

Leave the assessment of the retaining wall's condition to us.

We offer wall integrity diagnosis services. In surface wave exploration, vibrations are generated by striking the surface of the wall, and these vibrations are captured by sensors to measure the S-wave velocity of the wall structure and the backfill soil. The S-wave velocity can also be used to evaluate whether the wall is dry-stacked or mortared. Additionally, we address issues related to ground stability, such as concerns about "the impact of neighboring construction," "worries about the yellow zone," and "concerns about fill in valleys." 【Methods for Wall Integrity Diagnosis】 ■ Visual inspection of aging walls - Deformation survey through close visual inspection - Evaluation using a scoring method ■ Surface wave exploration (recommended) - Integrated diagnosis of the structure - Evaluation based on S-wave velocity, etc. *For more details, please download the PDF or feel free to contact us.

  • Structural Survey
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Elcolam method

This is a method developed with the intention of improving the mixing and stirring performance of the ground and solidifying material slurry.

The "Elcolum Method" is a slurry-based mechanical stirring deep mixing treatment method for constructing columnar ground improvement bodies. By injecting slurry using an E-nozzle that enhances the diffusion efficiency of the solidifying agent, the soil and slurry mix more uniformly, strengthening the excavation and stirring forces. In principle, management is conducted using head core and full-length core, allowing for evaluation of homogeneity based on uniaxial compressive strength. Depth, speed, rotation speed, number of blade cuts, cumulative flow rate, and other parameters can be monitored using management devices. 【Features】 ■ Stirring and mixing device ■ Construction management device ■ Quality control *For more details, please download the PDF or feel free to contact us.

  • Ground improvement
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Expansion resin anchor method

We will solve the problem of easily deflected wooden trusses, making large-span construction possible.

The "Expanded Resin Anchor Method" is a joint technology that enables design architecture like timber construction without hardware, as well as large-span buildings such as gymnasiums. Since the joints are made within the wood, they are not affected by drying shrinkage. The epoxy resin is filled in a spherical shape, eliminating any wobbling, and it possesses high rigidity and strength to the extent that the inserted bolts can break. Additionally, since no hardware is visible on the surface of the wood, it maintains a simple appearance as if the wood pieces are directly connected, preserving the design of exposed materials. 【Features】 ■ High rigidity and strength ■ No exposed hardware ■ Resistant to humidity and salt damage ■ No custom hardware required ■ Use of solid wood and locally sourced materials ■ Suitable for renovation work *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Wood Fastener Method

It is a supplementary method intended to be used primarily in conjunction with the expansion resin anchor method.

The "Wood Fastener Method" is our unique method that eliminates the need for steel plates by driving drift pins at an angle. Since the holes for the drift pins are on the receiving material side, there are no visible processing marks on the joints of the beams being connected. Additionally, the exposed part of the drift pin is almost entirely inside the wood, with only the head visible, making it resistant to rust. Depending on conditions such as joint shape, wood species, and drying state, it is also possible to use solid wood. 【Features】 ■ Sufficient rigidity and strength ■ No exposed hardware ■ Relatively resistant to moisture ■ Use of solid wood and locally sourced materials ■ Dry construction method, etc. *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Match Schedule Creation System

Large 4K TV, automatic display on the screen. Automatically re-display when the table is updated.

Our company provides a shift schedule creation system for various industries, including not only cutting work and paving/civil engineering, but also for creating shift schedules. You can access information anytime, anywhere, using your smartphone, tablet, or computer at your office or home. In addition to individual staff shifts, we automatically create shift schedules and process charts from multiple dimensions, such as by site, by equipment used, and by type of work. Please feel free to contact us if you have any requests. 【Operating Environment】 ■ Windows PC OS: Windows 7 or Windows 10 ■ Required Software: Microsoft Excel 2010 or later           Database software ace32 (provided by us) ■ Shared Disk: Windows server or NAS (network-attached storage) ■ Cloud: Microsoft OneDrive or other cloud environments *For more details, please download the PDF or feel free to contact us.

  • Shift Management System
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Permeable resin pavement adhesive "Fiber U"

It has good workability due to its liquid form! The adhesive strength is similar to that of epoxy resin and contains special fibers.

"Fiber U" is an elastic, permeable resin pavement adhesive made from urethane material. It can be applied directly over concrete substrates such as parking lots or on new and existing asphalt. Being a non-yellowing type, it helps maintain the wet color of natural gravel for a long time. Additionally, one of the characteristics of urethane resin is its glossiness, which is present in the standard specification along with the wet color, but a matte finish is also available as an option. 【Features】 ■ Non-yellowing type, so the wet color of natural gravel is preserved for a long time ■ Can be applied directly over concrete substrates such as parking lots or on new and existing asphalt ■ Adhesive strength is similar to that of epoxy resin, with special fiber included ■ Elastic due to the urethane material *For more details, please refer to the PDF document or feel free to contact us.

  • glue
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

PatchGuard (bury type sacrificial anode)

Electrolytic cathodic protection method using impressed current anodes effective in suppressing macrocell corrosion of internal steel in concrete structures due to salt damage and other factors.

This is a small spot-type sacrificial anode system developed to prevent re-deterioration due to macrocell corrosion at the cross-section repair locations.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

DuoGuard method (hybrid sacrificial anode material)

A new hybrid repair method that combines the characteristics of two effective approaches for preventing salt damage in concrete structures: external power supply type cathodic protection and impressed current anode method.

Effective measures against salt damage can be implemented through two phases: the external power supply phase (de-salting and re-alkalization) for improving the environment around the rebar, and the electrolytic anode phase that utilizes the differences in ionization tendencies of zinc and iron to long-term suppress rebar corrosion.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Submarine method

Safe and efficient. Clean method for dredging work and dewatering treatment using underwater sediment removal robots.

The "Submard Method" is a technique for cleaning the volume of sediment in water intake channels and similar areas. It allows for dredging and cleaning work tailored to various site conditions. Equipped with a Voltex pump, it minimizes clogging and can operate in both shallow and deep water, performing soft work that does not damage the floor surface. Additionally, by using SST, it is possible to conduct surveys from sediment accumulation conditions to output assessments. Please feel free to contact us if you have any inquiries. 【Features】 ■ Safe and efficient ■ Compact portable processing equipment ■ Abundant support devices, etc. *For more details, please download the PDF or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Epoxy method

We provide asphalt mixtures manufactured at our own plant along with reliable technology.

Our company is developing the "Epo Method," which has brought about groundbreaking technological innovations and various benefits and effects in the upper maintenance work of manholes. This method achieves a significant reduction in construction time through the systematization of processes, completing the work from the start of construction to traffic reopening in about three hours. In addition, we are also engaged in paving, general civil engineering, asphalt mixture manufacturing and sales, and construction waste recycling businesses. 【Advantages】 ■ Short construction time ■ High durability ■ Low noise and low dust ■ Flat, safe, low vibration, and comfortable *For more details, please download the PDF or feel free to contact us.

  • Inspection hatches, manhole covers, and ditch covers
  • Manhole body
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ultra Column Method

We will construct high-quality columns using a stirring device and a mixing tester.

The "Ultra Column Method" is a mechanical mixing deep mixing treatment method that uses a cement-based solidifying material slurry. It employs a unique cross-shaped anti-rotation wing on the excavation head, which reduces the mixing failure caused by the soil rotation phenomenon that can be problematic in viscous ground. Additionally, immediately after construction, the resistivity of the column is measured with a mixing tester to confirm the mixing condition, allowing for the construction of high-quality columns. 【Features】 ■ Improved mixing efficiency through unique technology ■ Reliable quality control ■ Various improvement forms available ■ Suitable for small-scale buildings ■ Adaptable to various sites ■ Compatible with a wide range of soil types *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[NETIS Registration] Super Wrap L Elneed Method

Foundation construction method using fluidized treatment soil! Joint research and development with the National Institute for Land and Infrastructure Management.

The "Super Rappuru Erunido Method" is a construction method that realizes "simplicity, clarity, and reliability." Considering soil quality, high quality, and uniformity, various buckets such as cut & mixing buckets, M mixing buckets, and skeleton mixing buckets are used appropriately during construction. Additionally, to achieve high quality, we thoroughly manage quality by addressing changes in soil quality during construction, changes in groundwater levels, and ensuring reliable confirmation of the supporting ground. 【Features】 ■ Minimal leftover soil ■ Easy confirmation of the supporting layer ■ Strength management can be performed as needed ■ Quick response to changes in natural soil moisture content ■ No compaction required ■ Increased adhesion prevents liquefaction *For more details, please download the PDF or feel free to contact us.

  • 1-2.PNG
  • 1-3.PNG
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Hyogo Prefecture! Super Rappu Elneed method.

[NETIS Registration] Supporting the form of the earth with reliable technology! Appropriate and safe design tailored to the application.

We would like to introduce the features of the "Super Rappuru Elniido Method," which include a shortened construction period and high-quality improvement bodies. By using different buckets according to the soil type for mixing, it enables the creation of high-quality improved bodies and also improves efficiency. Additionally, the time from excavation to completion of the improvement is short, and in most cases, direct excavation is possible, eliminating the need for excess excavation and the setting and removal of formwork. [Features] ■ Excellent cost-effectiveness ■ Easy confirmation of support layers ■ Minimal excess soil on site (amount of disposal soil) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

  • 2-2.PNG
  • 2-3.PNG
  • 2-4.PNG
  • 2-5.PNG
  • 2-8.PNG
  • 2-6.PNG
  • 2-7.PNG
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Aichi Prefecture! Super Rappu Elneed method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality earthworks with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation, setting up, and removing formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling the creation of high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

  • 2-2.PNG
  • 2-3.PNG
  • 2-4.PNG
  • 2-5.PNG
  • 2-8.PNG
  • 2-6.PNG
  • 2-7.PNG
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super Rappuru Basic Construction Method (El Nido Method) Technical Documentation

[NETIS Registration] An explanation of design policies, the bearing capacity of the underlying ground, and load levels, extracted from design documents!

On this page, we have published excerpts of technical materials on the Super Rappuru Foundation Method (El Nido Method). We provide detailed explanations on topics such as "the bearing capacity and load degree of the underlying ground for embankment," "immediate settlement amount," and "the calculation formula for the design standard strength Fc of the embankment." For more details, please check the related links. We encourage you to take a look. [Contents] ■ Design Policy ■ Bearing Capacity and Load Degree of the Underlying Ground for Embankment ■ Confirm that the immediate settlement amount SE is less than the allowable total settlement amount Sa ■ Determine the design standard strength FC of the embankment *For more information, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super Rappuru El Nido Method <Over 3,000 construction achievements nationwide>

Shortening the time from excavation to completion of land development! It is easy to confirm the supporting layer through visual inspection and palpation.

The "Super Rappuru Elniido Method" utilizes on-site excavated soil during construction, allowing for a reduction in disposal costs for excess soil. It addresses challenges such as the complexity of processes like excavation and formwork placement in methods like the Rappuru Method (concrete pouring), seeking a more simplified approach. This method enables a reduction in processes through direct excavation, leading to shortened construction periods and lower costs. Additionally, we are expanding our partnerships with major companies such as Shimizu Corporation, Kajima Corporation, and Takenaka Corporation, boasting over 3,000 construction achievements nationwide. 【Three Strengths】 ■ Shortened construction period and reduced costs ■ Easy verification of support layers and high quality ■ Minimal excess soil after construction *For more details, please download the PDF or feel free to contact us.

  • スクリーンショット 2025-04-14 15.27.36.png
  • スクリーンショット 2025-04-14 15.34.39.png
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Kagawa Prefecture! Super Rappu Elneed method.

[NETIS Registration] Achieving cost-effective ground improvement that can accommodate groundwater, weak ground, and narrow sites.

We are implementing ground improvement work that excels in the balance of quality and cost by utilizing the Super Rappu Elniido method, which accommodates various architectural uses such as medical facilities and factories within Kagawa Prefecture. This method allows for a reduction in processes such as excess excavation and the installation and removal of formwork through direct excavation construction, enabling the completion of work at each location in a short time. This achieves both a reduction in construction period and cost. Additionally, based on our track record of conducting numerous preliminary test constructions on various grounds, we have accumulated know-how in mix design, construction management, and the development of mixing buckets. A key feature of this method is its ability to construct high-quality fill with minimal strength variation. We flexibly respond to design requirements such as design bearing capacity, improvement depth, and construction volume, ensuring long-term structural stability and economic efficiency. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality fill ■ Minimal site surplus soil (disposal residual amount) ■ Agile response to various sites

  • IMG_7708(3M).jpg
  • IMG_7709(4M).jpg
  • IMG_7711(3.5M).jpg
  • IMG_7715(4M).jpg
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Aomori Prefecture! Super Rappu Elniido method.

[NETIS Registration] Construction of sediment control dams approved!

We carried out ground improvement for a sediment control dam in public civil engineering using the Super Rappu Elniido method. Excavation and improvement were performed down to the bedrock of the supporting layer, and sloped cross-section shaping was also conducted. In mountainous sites, construction conditions are limited, such as the selection of construction machinery and materials. However, the Super Rappu Elniido method can be implemented with basically a general-purpose backhoe and a small amount of materials, making it possible to work in narrow areas. We also introduce various case studies on pages from other prefectures.

  • 青森県?.jpg
  • 青森県?.jpg
  • 青森県?.jpg
  • 青森県?.jpg
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Yamaguchi Prefecture! Super Rappu El Nido method.

[NETIS Registration] Achieving shortened construction periods and low costs! Capable of handling groundwater and soft ground!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation, as well as the setting up and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix design, construction management, and the development of mixing buckets, enabling us to create high-quality site development with minimal variation in strength. 【Features】 ■ Easy confirmation of the supporting layer ■ Shortened construction period and high-quality site development ■ Minimal surplus soil (disposal leftover amount) on site ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 掘削完了.JPG
  • 20230417-102358-815_387d96ea2b3c442d5485953ce0c40957.jpg
  • 地盤改良工事.JPG
  • フロー値.JPG
  • 現場コア写真.JPG
  • 施工後残土量.jpg
  • 水中養生.jpg
  • 圧縮試験機.jpg
  • 試験練り.JPG
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Column] Comparison of Other Construction Methods and Processes / The Reason for the Significantly Faster Construction Time

Comparison of construction methods and processes / The reason why the construction time is overwhelmingly fast.

Can we achieve an overwhelming reduction in construction time? ⬛︎Explanation 1: No "slurry production" (compared to cement milk/pile improvement) In the cement milk method and pile improvement, the process begins with "slurry production," where cement and water are mixed at a batch plant. In fact, this preparation alone takes about 90 minutes for a site using 30 tons of cement. The Super Rappu Elneed method eliminates this entire preparation process. Since the solidifying agent is directly inserted in its package, there is no need for a plant or slurry production. The insertion work that took 90 minutes is completed in just 5 minutes. ⬛︎Explanation 2: No "formwork assembly and dismantling" (compared to the Rappu method) In the Rappu method, after "excavation," "formwork assembly" is performed, and after the concrete hardens, "formwork dismantling" occurs. These tasks require specialized craftsmen and are time-consuming processes. The Super Rappu Elneed method utilizes the sides of the excavation hole as a substitute for formwork (earthen formwork), eliminating the entire series of tasks related to "formwork." This allows for reductions in work time, labor costs, and material costs.

  • 67ea78497424eed9679815a182c5a3db-1024x768.jpg
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

RC・S造のコストダウン事例。杭・柱状改良に次ぐ第三の選択肢

杭基礎より安価に、柱状改良より高強度に。「目視確認」ができる安心の地盤改良工法。NETIS登録・技術審査証明取得済み

従来の柱状改良工法で課題となっていた「品質のバラツキ」や「支持層確認の難しさ」を、全数フロー値管理と直接の目視確認によって解決しました。 場所打ち杭やラップルコンクリート工法と比較し、RC造7階建マンションの施工事例では「工期約15%短縮」「総コスト約10%削減」を実現。 砂質土で最大3000kN/m²の高支持力を実現し、大規模建築や重量物施設における基礎の小型化・経済設計に貢献します。 岩塊・巨礫混じりの難地盤や、地下水位が高い現場でも品質を確保できるため、諦めていた敷地での施工もご相談ください。 本資料では、従来工法との詳細なスペック比較、コストダウン事例、設計基準強度について解説しています。

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Joint Development with the Ministry of Land, Infrastructure, Transport and Tourism] Ground improvement with a site strength ratio of 1.0 or higher! Support layers visible.

Eliminating the "invisible" concerns of column improvement. Achieving both direct visual inspection of the support layer and a field strength ratio of 1.0 or higher. Comprehensive comparison table with conventional methods and design standard strengths.

This is a technical document aimed at preventing quality issues in ground improvement. It allows for direct visual confirmation of the "support layer," which has been difficult to verify with conventional columnar improvement methods. Furthermore, through strict slurry management, it achieves a strength ratio of "strength ratio ≥ 1.0," which is generally said to be around 0.2 to 0.8 (field test specimen strength / laboratory mix strength). Please take a look at this reliable quality management method developed in collaboration with the Ministry of Land, Infrastructure, Transport and Tourism and registered with NETIS. 【Contents】 Overview of the method and its reliability Challenges of conventional methods and the technical superiority of this method Design advantages and application conditions Features of quality management

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

屋根改修工法『ユニークルーフFit』

熱中症対策で関東圏でのカタログに載っている建材を使った施工をご紹介!

『ユニークルーフFit』は、屋根の形状に応じて断熱材を加工・納品する 屋根改修工法です。 屋内の厚さ軽減、雨漏り防止、屋根材の保護に好適。軽量な断熱材を屋根に 貼付け、スプレーウレタン防水の密着工法にて一体化。 また、断熱材の厚さ50・75・100mm、お客様の要求性能をふまえたご提案が 特長で、トップコートは標準色のほか、調色の対応も承っております。 【特長】 ■さまざまな屋根に適用できる改修工法 ■既設屋根の現状を元にオーダーメイド ■押出法ポリスチレンフォーム断熱材3種bA相当、熱伝導率0.028W/(m・K)以下 ■断熱材の厚さ50·75·100mm ■建築用塗膜防水材、高品質なスプレーウレタンを使用 ■屋根の全面をスプレーウレタンで覆う、安心の防水性能 ※詳しくはPDFをダウンロードしていただくか、お気軽にお問い合わせください。

  • Roof and gutter construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Work Schedule Creation AI System "Work Style Meister"

"Designing to work happily" - An AI system for creating work schedules born from a hospital.

The "Work Style Meister" is a tool designed to create a happier way of working. With AI automatically generating work schedules in a short time, it allows for the testing of various conditions to create the optimal schedule that balances work-life balance and service quality at a higher level. It also enables the management of daily task assignments, event participation, support, output of Form 9, and monitoring of nursing staffing standards. 【Features】 ■ Work preferences can be submitted from smartphones ■ AI automatically generates schedules in just a few minutes, considering work preferences and conditions ■ Management of daily tasks, event participation, support, etc. is possible ■ Creation of Form 9 and monitoring of staffing standards are possible ★ The "Nursing Staffing Meister" has been reborn as the "Work Style Meister" ★ While maintaining the screen layout and existing functions of the "Nursing Staffing Meister," performance has improved, and design and usability have been enhanced, allowing for use from a wider variety of devices. In addition to daily shift creation, time scheduling for tasks (scheduled for release in 2026) will be possible, and integration with other systems will be strengthened. *For more details, please download the PDF or feel free to contact us.

  • Shift Management System
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Exterior construction work

For exterior structures such as garages, fences, and entrances, leave it to us!

Our company provides exterior construction services with the motto of being careful and beautiful, aiming to enhance the appearance of buildings and improve functionality. We carry out various projects such as lightweight and earthquake-resistant block walls, painting, parking lot paving, and the installation of fences made from various materials, including resin and wood grain. Additionally, we handle formwork construction for creating molds before pouring concrete, as well as the handling of various materials and tools used in civil engineering sites. 【Construction Services】 ■ Block Walls ■ Parking Lots ■ Approaches ■ Terraces ■ Fences ■ Gate Posts and Gates *For more details, please download the PDF or feel free to contact us.

  • Gates, walls and fences
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration