Construction method "Two-Line Welding Method (Two-Line Mesh Method)"
A two-line welding method for underground beams that achieves significant shortening of construction time and allows for small-scale construction!
The construction method is the "Underground Beam Double-Line Welding Method" for underground beam stirrups and beam stirrups, which ensures a spacious working environment without the need for main reinforcement receiving frames or temporary scaffolding. The reinforcement of the upper main bars of the beam, pressure welding, and the installation of cap ties can be carried out on the formwork. Additionally, the joint length is not a problem as it is more than 25d due to the two horizontal bars welded at the ends of the auxiliary reinforcement. *For more details, please download the PDF or feel free to contact us.*
- Company:ワイビーテクノ 東京事務所
- Price:Other