Construction method Product List and Ranking from 1593 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 エスケー化研 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Gradient Construction Method for Residential Exterior Walls "KF Gradient Method" KFケミカル
  5. 5 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック

Construction method Product List

736~750 item / All 4218 items

Displayed results

Ground Improvement Method "Rising W" Construction Procedure

A detailed introduction to the construction process from preparation work to completion for "Rising W"!

Here are the construction procedures for "Rising W." In the preparation work, to ensure stability during the operation and movement of the construction machinery, we will carry out measures such as laying steel plates, surface ground improvement, curing, alignment and marking, inspection and calibration of measuring devices, and checking the condition of the solidifying agents. 【Construction Procedures】 ■1. Preparation Work ■2. Positioning ■3. Start Excavation ■4. Confirm Excavation Depth ■5. Introduce Improved Soil and Solidifying Agent Slurry ■6. Mixing ■7. Repeat ■8. End of Mixing and Construction *For more details, please refer to the PDF document or feel free to contact us.

  • Earthworks
  • Ground improvement
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Total Support from Yamashita Industries

Creating a safe and secure living environment starts from the ground up. [ISO 9001 Certification Obtained]

Yamashita Industries boasts numerous achievements ranging from single-family homes to large buildings. Starting with ground surveys and the "G-Men" system that guarantees buildings and ground for 20 years, our professionals in ground surveys and improvement work provide total support, including the columnar improvement construction method "Ultra Column Method NEO." 【Features】 <Ultra Column Method NEO> ■ Acquired construction technology performance certification ■ High strength and low residual soil ■ Wide range of applications from small to large scale *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method
  • Ground improvement
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The ground improvement method "Rising Method" that achieves a solid foundation for buildings.

"From small-scale buildings to civil engineering structures" is a ground improvement method that mixes soil and slurry or solidifying agents to construct a highly homogeneous block-like improved body.

The "Rising Method" is a ground improvement technique that involves placing pre-excavated soil into the excavation area and mixing it with slurry using a uniquely developed mixing bucket to create a highly homogeneous block-like improved body. By excavating the soil in advance, it allows for the "confirmation of the supporting layer and the soil to be improved," and also enables the "removal of organic soil that hinders solidification, as well as gravel layers, boulders, industrial waste, and underground obstacles that can impede construction," thus achieving various benefits. ★ It has obtained the Architectural Technology Performance Certification from the Japan Building Disaster Prevention Association. Additionally, it has a record of NETIS registration SK-130021A (registration period has ended). 【Are you facing any of these issues in ground improvement methods?】 ■ Unable to confirm the supporting layer… ■ Unable to manage the quality of the improved body… ■ Unable to remove underground obstacles… ■ Excavation loss due to circular shape construction… ⇒ We will solve all these concerns! * There is also the "Ultra Column Method," which can reduce poor mixing caused by the phenomenon of soil co-rotation that is problematic in low-viscosity ground. * For more details, please refer to the PDF document or feel free to contact us.

  • Earthworks
  • Ground improvement
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Reason for Adoption] Ultra Wood Column Method

Stable supply with no price fluctuations! Can be accommodated at depths of soft ground. Construction with compact machinery.

We will introduce the reasons why the "Ultra Wood Column Method" is adopted. Methods such as column improvement and steel pipe pile methods require a supporting layer or stable layer, but this method can be applied at the depth of soft ground. Additionally, it can be implemented up to a maximum of 4.5 meters, specifically addressing soft ground, so there is no need for large, high-power machinery; compact machines like pile drivers can be used. Due to these characteristics, it is adopted in cases such as: "I was told by a ground reinforcement construction company that 'reinforcement work cannot be designed because there is no supporting layer.'" "I was told that the cost of reinforcement work with steel pipe piles is high because the supporting layer is deep." "I was told that I need to implement column improvement for 8 meters in the intermediate layer of the ground." 【Features】 ■ Can be designed for soft ground ■ Construction with small machinery ■ Low raw material costs ■ Reliable because it is a construction method with certified building technology performance *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A booklet titled "Ground Handbook" that clearly explains various ground reinforcement methods.

Attention those troubled by ground improvement work! We have a wealth of information on selection methods for surface improvement work, friction piles, columnar improvement methods, and the characteristics of each method. *Materials are currently being distributed.

The "Ground Handbook" is a booklet that introduces methods for ground surveys and ground reinforcement work conducted when constructing new buildings. It provides clear explanations of two commonly used ground survey methods and the ground reinforcement techniques that our company can implement. This can serve as a reference when selecting ground reinforcement methods and can be used as explanatory material for clients. 【Featured Methods】 ■ Surface Improvement Work: Rising W/D Method ■ Friction Piles: Ultra Wood Column Method, Economic Base Method ■ Columnar Improvement Methods: Ultra Column Method, Ultra Pile Method, Ultra Pillar Method *For more details, please refer to the materials. Feel free to contact us with any inquiries.

  • Ground foundation construction method
  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

液状化対策・軟弱地盤対策スーパージオ工法 【免震・地盤改良】

杭不要!敷き詰めるだけの低コスト免震・地盤改良工法 【免震保証付き】【特許取得済み】

建物の重量と同等の地盤を取り除き、かわりにスーパージオ材を敷き詰めて地盤を軽くし、建物の支持力を確保する置換工法です。 地震時に発生した過剰間隙水を一時的に保水でき、液状化対策としても効果を発揮します。 土地の鑑定時には「土壌汚染」や「埋設物」の有無もチェックされます。 柱状改良や鋼管杭は産業廃棄物なので費用がかさみ不動産価格を下げてしまいます。 スーパージオ工法は、杭を打たない工法のため、原状回復には部材を取り除くだけで多大なコストをかけず簡単にできます。 【特徴】 ○従来の改良工法と比較して大幅なCO2削減が可能 ○耐酸性・耐アルカリ性に優れ、微生物による劣化もない ○重機や特殊技術、機器が不要 ○メンテナンスフリー ○雨水利用・地熱利用も可能 ★同工法が2015年2月1日、テレビ朝日系「大改造!!劇的ビフォーアフター」で紹介されました。大反響につき現在、販売代理店も募集中です。 詳しくはお問い合わせ、またはカタログをダウンロードしてください。

  • Ground improvement materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Replacement construction method "Super Geo Method"

Protect buildings from earthquakes, liquefaction, and weak ground!

The Super Geo Method reduces load by using Super Geo material as a replacement material, thereby alleviating consolidation settlement of the underlying ground. Additionally, during an earthquake, it incorporates pore water within the Super Geo material to prevent sand boiling due to water pressure and stabilizes the ground during liquefaction. 【Features】 ○ Provides seismic mitigation ○ Offers liquefaction countermeasures ○ Can be installed on any type of land For more details, please contact us or download the catalog.

  • Earthworks
  • Pile and foundation work
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Construction report fraud is a fatal injury" - A solution! Visually detectable ground reinforcement SG method.

The "Super Geo Method" is a seismic isolation and ground improvement technique that allows the construction process to be visually understood.

Due to the bearing capacity of the ground, we remove the amount of soil that can support the weight of the building and lay down "Super Geo Material" made from recycled plastic, which prevents settlement through its load reduction effect. * *A strong guarantee backed by confidence* * ❍ "Ground Guarantee" up to 300 million yen; "Seismic Isolation Guarantee" up to 100 million yen Since Super Geo Material acts as a cushioning material, it becomes a seismic reduction method and is covered by major insurance companies! ❍ "Liquefaction Guarantee" up to 100 million yen! During liquefaction, only water is absorbed into the Super Geo Material to prevent it from gushing to the surface. When the earthquake subsides, the water returns to the soil, maintaining stability during liquefaction. ■====【Features】====================■ ■ The construction process can be visually confirmed because it is done manually. ■ Can be installed on any land or soil type, including soft ground. ■ Can be assembled without special technology or equipment (reassurance through an inspector system). ■ Only the components need to be removed during dismantling! Does not lower the land's asset value. ■ Comes with a 10-year seismic isolation and liquefaction guarantee (renewable every 10 years, up to a maximum of 30 years). ■============================■

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pillars made of wood: New wooden hybrid construction method "M-HR Method"

The first floor features a large space constructed using the Summit HR method, while the second and third floors utilize the "2x4 method," achieving a cost-balanced architectural proposal!

We would like to introduce the "M-HR method," a combination of the wooden two-directional frame structure "Summit HR method" and the "Two-by-Four method," which is a combination that has not existed until now. 【Are you giving up on planning like this?】 ◆ You want to create a large open space on the first floor with wooden construction, but you want to keep overall costs down. (Catalog name: M-HR method) ◆ You want to differentiate between wooden frame structures and wall structures in a planar layout. (Catalog name: G frame) By using the Summit HR method to create a large open space on the first floor and employing the "Two-by-Four method" for the second and third floors, we can achieve a balanced architectural proposal in terms of cost! For example, the first floor can be effectively used for stores such as restaurants or parking, while the second and third floors can be proposed for rental offices or multi-family housing. *For more details, please download the PDF. Feel free to contact us for more information.

  • DJI_0023.jpg
  • M-HR工法.jpg
  • Renovation and repair methods
  • Structural Materials
  • Wood panel and frame wall construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Spacious! Free space design! 'Solid Wood Hybrid Construction Method M-HR Method'

The first floor features a large space constructed using the Summit HR method, while the second and third floors utilize the "2x4 method," achieving a cost-balanced architectural proposal!

This is a hybrid construction method that creates large spaces using a pure wooden structure, combining a two-directional wooden frame structure "Summit HR Method" on the first floor and "Two-by-Four Method" on the second and third floors. For example, the first floor is effective for proposals such as restaurants or parking lots, while the second and third floors can be used for rental offices or multi-family housing. We encourage you to consider its application for roadside stores and similar establishments. *For more details, please download the PDF and take a look. Feel free to contact us for further information.*

  • 1.jpg
  • 2.jpg
  • 3.jpg
  • Special Construction Method
  • Wood panel and frame wall construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement work - Wet method of columnar improvement.

Reinforcing weak or unbalanced ground with ground improvement work! It will also become more resilient to disasters!

The wet column improvement method involves mixing soil and cement milk to create columnar bodies with a diameter of 400mm to 800mm within the soil. These thick and large columns support the house due to their friction resistance. If the soil and cement milk are mixed carelessly, a proper columnar body cannot be formed. Columnar improvement relies on careful mixing. ↓↓ For more details, please contact us. ↓↓

  • Ground improvement materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Environmentally friendly new ground reinforcement "GRR Sheet Method"

Can be used in cultural property buried sites! Ground reinforcement method that can be implemented at shallow construction depths.

The "GRR sheet method" is a ground reinforcement technique that involves laying "geotextiles" within a crushed stone base that has a specified thickness. By utilizing the "rigidity reinforcement effect near the surface due to the crushed stone base" and the "deformation constraint effect of the crushed stone layer provided by the sheet," it reduces differential settlement and enables stable support for structures over time. 【Features】 ◆ All processes are visually observable, ensuring reliable construction management ◆ No curing period required, allowing for reduced construction time ◆ Can be implemented in narrow spaces as it does not require the use of specialized construction machinery 【For more details, please feel free to contact us】

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement "Pure Pile Method" high strength, short construction period, no residual soil!

Presentation of Detailed Information: A new form of columnar improvement method that does not mix soil with cement! Ensuring safe and secure single-family homes! Pile foundation reinforcement method for single-family houses.

The Pure Pile Method is an advanced ground reinforcement technique that enhances traditional columnar improvement methods, providing a safe and high-quality pile foundation with three times the strength, even in humus soil. Since piles are constructed using only cement milk without soil contamination, it achieves uniform and stable high strength regardless of the type of ground. Furthermore, a special excavation rod expands the ground laterally while digging to the support depth, allowing for the construction of the pile body by replacing it with cement milk. 【Features】 - The strength of each pile is approximately three times that of columnar improvement. - Construction time is about half that of columnar improvement. - Minimal residual soil contributes to a cleaner site, demonstrating environmental consideration. For more details, please contact us or download the catalog.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ultra Column Method [Ground improvement with over 3,800 achievements in 6 years]

Quality inspection shortened from one week to same day! A new soil column method for constructing high-quality columns.

The "Ultra Column Method" is a mechanical mixing deep mixing treatment method that uses cement-based solidifying material slurry. By measuring the resistivity of the column with a mixing tester immediately after construction and confirming the mixing conditions, high-quality columns can be constructed quickly. This is a new soil column method that has achieved over 3,800 cases in just six years. 【Features】 ◆ Quality inspection that usually takes about a week can be done on the same day ◆ Improved mixing efficiency with proprietary technology ◆ Suitable for small-scale buildings ◆ Low noise and low vibration 【For more details, please download the catalog or feel free to contact us】

  • Ground improvement materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hanging bundle hardware "Kamoisage hardware T"

Smooth movement of sliding doors! A hanging support bracket for the second-floor beam that lowers due to natural load.

The "Kamoigai Raising Bracket T" is a bracket used to support the second-floor beam that sags due to natural loads and to prevent the kamoi from sagging. It consists of two brackets: Bracket A is installed on the lower side of the beam, and Bracket B is attached to the hanging post. The spring in Bracket B fixes the bracket again with the force of the spring when adjusting the sag of the second-floor beam with the bracket. Additionally, we offer "nails" that can be used for joining wood together. 【Features】 ■ Supports the second-floor beam that sags due to natural loads ■ Prevents the kamoi from sagging ■ Ensures smooth movement of sliding doors and similar items *For more details, please refer to the PDF document or feel free to contact us.

  • Work tools
  • Woodworking machines, instruments, and tools

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration