Construction method Product List and Ranking from 1598 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 エスケー化研 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Gradient Construction Method for Residential Exterior Walls "KF Gradient Method" KFケミカル
  5. 5 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック

Construction method Product List

286~300 item / All 4238 items

Displayed results

Rockfall prevention combined type slope collapse countermeasure work "Eagle Hold"

It minimizes the felling of standing trees on slopes and excels in protecting natural landscapes!

We offer the "Rockfall Prevention Combined Slope Failure Countermeasure Construction." This method prevents slope failure by using rock bolts inserted into the ground, while also enabling rockfall prevention through a grid-like wire rope secured to a specially designed support plate, addressing both sources of slope failure and rockfall prevention. The main components remain unchanged from conventional slope failure countermeasure methods and rockfall prevention methods, and the design can be carried out according to each respective standard as before. 【Features】 ■ Rockfall Prevention ■ Slope Failure Countermeasure *For more details, please download the PDF or feel free to contact us.

  • 落石予防併用型 斜面崩壊対策工2.PNG
  • 落石予防併用型 斜面崩壊対策工3.PNG
  • 落石予防併用型 斜面崩壊対策工4.PNG
  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Rockfall Countermeasures and Prevention Work for Important Infrastructure (Slope near Railway Crossing)

The soil type is gravelly soil, and it is an example of rockfall countermeasures and preventive construction within a range of 1,500 m²!

We would like to introduce a case where our "Tezak Super Lock (contact type)" was implemented in slope maintenance work near a railroad crossing. This project was commissioned by a private entity and carried out in Hyogo Prefecture. The soil type was gravelly soil, and it involved rockfall countermeasures and preventive work over an area of 1,500 m2. The contact type method involves installing thick wire mesh as auxiliary material to prevent erosion from gravel and other materials while preventing floating and rolling rockfalls. [Case Overview] ■ Project Name: Slope Maintenance Work Near Railroad Crossing ■ Location: Hyogo Prefecture ■ Construction Date: February 2021 (Reiwa 3) ■ Area: 1,500 m2 ■ Soil Type: Gravelly Soil *For more details, please refer to the related links or feel free to contact us.

  • 19a.PNG
  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Greening of the asphalt (pavement) factory employee parking lot.

Standard equipped with automatic irrigation system! A case study of thin-layer parking greening method installed on pavement.

In the fiscal year 2018 (H30), we would like to introduce a case where the "Tafutafu Park 55," a type of green parking method installed on pavement, was implemented in the greening project of a private factory employee parking lot. The existing asphalt was excavated by 55mm, and our product was embedded. Due to the limited number of parking spaces for employees, the project was divided into sections to ensure that employee parking could be maintained during construction. Please feel free to contact us if you have any inquiries. [Case Overview] ■ Project Name: 2018 (H30) Fiscal Year Private Factory Employee Parking Lot Greening Project ■ Location: Hyogo Prefecture ■ Construction Date: March 2019 (R1) ■ Area: 400m2 ■ Purpose: Parking Lot *For more details, please refer to the related links or feel free to contact us.

  • 12-2.jpg
  • 12-3.jpg
  • 12-4.jpg
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Example】Greening of a parking lot that can be completed in a short period and with minimal yard space.

The construction period can be shortened, and even if there are no operating factories or alternative parking spaces available, it is possible to carry out the work with minimal yard space!

In the fiscal year 2022 (R4), we would like to introduce a case where the "Tafutafu Park 55" green parking method was implemented in the greening construction of a private factory employee parking lot. This method was adopted because it minimizes the removal of existing asphalt and can be constructed without affecting the operational factory. We excavated 55mm of the existing asphalt and installed our product. This method does not require the stripping of existing pavement such as asphalt or earthworks, allowing for a reduction in removal and disposal costs. 【Case Overview】 ■ Project Name: 2022 (R4) Fiscal Year Private Factory Employee Parking Lot Greening Construction ■ Location: Osaka Prefecture ■ Construction Date: October 2022 (R4) ■ Area: 1330m2 ■ Purpose: Parking Lot *For more details, please refer to the related links or feel free to contact us.

  • 13-2.jpg
  • 13-3.jpg
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] A grassy area in a dog run where the grass tends to wither easily due to feces and urine.

Case from December 2019 (R1)! Implemented using a construction method that secures the root growth layer.

We would like to introduce a case study of the pressure-resistant green space construction method "Grass Strong" implemented at the Chiba Park Interaction Square. This project was commissioned by the Mito City Hall and carried out in Ibaraki Prefecture. The area covered was 2110 m², aimed at creating a grass square. This method features a structure that secures the root growth layer, preventing compaction due to foot traffic, and allows for a grass square that is free of protrusions, making it accessible for both people and vehicles. 【Case Overview】 ■ Project Name: 2019 (R1) Year Chiba Park Interaction Square ■ Location: Ibaraki Prefecture ■ Construction Date: December 2019 (R1) ■ Area: 2110 m² ■ Purpose: Grass Square *For more details, please refer to the related links or feel free to contact us.

  • 1-2.PNG
  • 1-3.PNG
  • Other park materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] A grassy area accessible to people and vehicles. Temporary parking during events.

A structure that ensures the growth layer of roots, preventing compaction due to foot traffic! An example of being used as a parking lot.

We would like to introduce a case of the pressure-resistant green space greening method "Grass Strong" implemented at the Tondabayashi Park lawn area, which also serves as a temporary parking lot. This project was commissioned by the Kishiwada Civil Engineering Office and carried out in Osaka Prefecture. During events, white lines are drawn to designate parking spaces. This method allows the lawn area to be used as a space accessible to people and vehicles, with no protrusions on the surface. 【Case Overview】 ■ Project Name: 2018 (H30) Tondabayashi Park Lawn Area and Temporary Parking Lot ■ Location: Osaka Prefecture ■ Construction Date: March 2018 (H30) ■ Area: 5,100 m² ■ Purpose: Lawn Area *For more details, please refer to the related links or feel free to contact us.

  • 2-2.PNG
  • Other park materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Slope collapse countermeasure construction method "Eagle Hold" <Rockfall prevention combined type>

The maximum pull-out force of the reinforcement material can be applied up to 90 kN per unit based on field tests!

The design of the "Eagle Hold" divides the ground into areas requiring ground reinforcement and areas requiring rockfall prevention, and conducts structural calculations for each division according to conventional standards. In the "Slope Failure Countermeasure Ground Reinforcement Method," rock bolts are inserted into the ground in large numbers to reinforce the slope primarily through tensile strength. In the "Rockfall Disaster Countermeasure Rockfall Prevention Method," the initial movement of loose and rolling stones is suppressed by the restraining and supporting forces of a grid-like wire rope and anchors. 【Features】 ■ Addresses both slope failure and rockfall disasters ■ Design remains as before ■ Adapts to various terrains ■ Does not compromise natural scenery *For more details, please download the PDF or feel free to contact us.

  • ?イーグルホールド 画像2.png
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Roof tile WAVE AM-2

Roof tile WAVE AM-2

We have recreated the simple Southern European-style colors on the roof tiles, allowing you to feel the warm sunlight. 【Features】 ○ After being molded and dried, the tiles are coated with glaze and fired. ○ They are characterized by rich colors, good luster, and minimal discoloration and fading. ○ These tiles express the individuality of the owner, regardless of architectural style, whether Japanese, Western, or modern. ○ Available in seven colors: Euro Yellow, Euro Red, Euro Brown, Black, Metallic Black, Brown, and Moss Green. ● For more functions and details, please download the catalog.

  • Japanese roofing tiles
  • Tile and slate roofs
  • Roof and gutter construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Japanese Roof Tile Series

Introducing flat tiles used in general residences, made from traditional Japanese temple tiles!

At Nippon Ceramics Co., Ltd., we handle the "Japanese Roof Tile Series." We offer traditional Japanese building materials, specifically tiles. We have traditional styles, reproductions, and modern tiles available. Our company deals not only with Japanese tiles and imported tiles but also a wide variety of products such as natural slate and resin roofing materials. 【Product Lineup】 ■ Honbuki tiles ■ Honbuki integrated tiles ■ Wagata 53A ■ S-type ■ Spanish tiles ■ F-type flat tiles ■ M-type: commonly used in residential buildings *For more details, please refer to the related links or feel free to contact us.

  • Japanese roofing tiles

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Anti-fall prevention method "Hybrid Sheet Method"

NEXCO Structural Construction Management Guidelines: Obtaining Proof of Spalling Prevention Performance! Introducing an excellent construction method that also leads to shortened construction periods.

The "Hybrid Sheet Method" is a construction technique that involves adhering a weather-resistant "HB Sheet (Hybrid Sheet)" to the surface of concrete using adhesive. Similar to concrete protective coatings, it possesses the ability to suppress salt damage and carbonation, providing measures against deterioration (salt damage and carbonation). Since it can be reinforced by simply overlapping without removal, the initial construction will not be wasted when reinforcing with steel plates or CFRP in the future. Additionally, compared to conventional methods, the number of traffic regulation days is reduced by about half, leading to a shortened construction period. 【Features】 ■ Excellent peeling prevention performance ■ Contributes to shortening the construction period ■ Measures against deterioration (salt damage and carbonation) are also possible ■ Can be reinforced by overlapping without removal ■ Obtained certification for peeling prevention performance according to NEXCO structure construction management guidelines *For more details, please refer to the PDF document or feel free to contact us.

  • Other civil engineering works
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic reinforcement method "Steel brace adhesive method"

Due to the low amount of work, a shorter construction period is possible! A seismic reinforcement method that generates little noise, vibration, and dust.

The "Steel Brace Adhesive Method" is a construction method that does not require the installation of anchor bolts, allowing for construction without compromising the living environment. In conventional methods, the construction period takes about 13 days for one steel brace, but with this method, the process is simplified, reducing the time to about 9 days, enabling a shorter construction period. It has received a technical evaluation from the Japan Building Disaster Prevention Association, and if designed according to this evaluation, sufficient seismic resistance is recognized. Additionally, no substances that could cause sick house syndrome are used, and a construction management system is in place, allowing for safe adoption. [Features] ■ Minimal noise, vibration, and dust generation ■ Shorter construction period due to fewer processes ■ Larger openings possible ■ Applicable to various types of buildings ■ Safe design and construction methods *For more details, please refer to the PDF materials or feel free to contact us.

  • Other civil engineering works
  • Steel construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Electric corrosion prevention method "e-Sheet・NP method"

Excellent quality stability! Cathodic protection method using adhesive-type sheet anodes.

The "e-Sheet・NP Method" is an external power supply method for electrochemical corrosion protection that involves directly adhering a sheet-shaped anode (e-Sheet・NP), which is made by laminating adhesive-type anode material and a fluororesin film with excellent weather resistance, to a concrete surface. It is also applicable as a countermeasure against salt damage in reinforced concrete structures. Due to its thin and lightweight nature, it does not impose a burden on the structure, and its ease of installation contributes to excellent cost-effectiveness. 【Features】 ■ Installation is simply by adhering it ■ Since the anode material is adhered with an adhesive, short circuits and electrolysis are less likely to occur, reducing the need for pre-treatment such as removal of metal fragments, and it does not damage the structure ■ Being planar, it has stable corrosion protection performance ■ The surface uses a fluororesin film, which excels in weather resistance and aesthetics *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods
  • Reinforcement and repair materials
  • Earth retaining wall/foundation reinforcement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete Deterioration Prevention Method "RAC Sheet Method"

You can achieve a high-quality and uniform finished surface! A high-performance deterioration prevention sheet that is completed just by sticking it on.

The "RAC Sheet Method" is a high-durability and high-functionality deterioration prevention method for concrete that uses a special adhesive sheet. It excels in crack-following performance and can be applied in locations like railway viaducts, where cracks open and close due to vibrations. This method is suitable for work under harsh construction conditions, such as short construction times and low-temperature environments, which are difficult for paint-based deterioration prevention methods. 【Features】 ■ Easy to install ■ Excellent crack-following performance ■ Superior weather resistance, resulting in high-quality and uniform finishes *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Peeling prevention construction method "Clear Guard One Method"

You can apply the required film thickness in one go! Being transparent, it also makes post-construction inspection and maintenance easy.

The "Clear Guard One Method" is a concrete spalling prevention method for tunnels that can prevent spalling with just one layer. Being transparent makes post-construction inspections easy. Since continuous fibers are not required, it can also be easily applied to complex structures. 【Features】 ■ Prevents spalling with just one layer ■ Easy application to complex structures since continuous fibers are not required ■ Allows for the necessary film thickness to be applied at once ■ Becomes a transparent film after curing, making maintenance and management after construction easy *For more details, please refer to the PDF document or feel free to contact us.

  • Reinforcement and repair materials
  • Renovation and repair methods
  • Tunnel Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic reinforcement method "Wooden seismic wall adhesive method"

Minimal noise, vibration, and dust generation! An attractive seismic reinforcement method utilizing domestic timber.

The "Wooden Seismic Wall Adhesive Method" is a seismic reinforcement technology that fixes wooden panels to existing structures and to each other using epoxy resin. Wooden seismic walls can achieve a load-bearing capacity comparable to that of reinforced concrete seismic walls. This method has been developed and put into practical use as a new way to utilize wood, contributing to the expansion of the "forest cycle" of sustainable forest resources. Additionally, it has received a building technology performance certification from the Japan Architectural Institute, and if designed according to this evaluation, sufficient seismic resistance is recognized. 【Features】 ■ Minimal noise, vibration, and dust generation ■ Possible reduction in construction time ■ Environmentally friendly ■ Safe design and construction methods *For more details, please refer to the PDF materials or feel free to contact us.

  • Earthquake-resistant construction method
  • Vibration isolation, vibration control, and earthquake resistance construction
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration