Construction method Product List and Ranking from 29 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Jul 23, 2025~Aug 19, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jul 23, 2025~Aug 19, 2025
This ranking is based on the number of page views on our site.

  1. null/null
  2. null/null
  3. null/null
  4. 4 null/null
  5. 5 null/null

Construction method Product ranking

Last Updated: Aggregation Period:Jul 23, 2025~Aug 19, 2025
This ranking is based on the number of page views on our site.

  1. Off-site construction method for air conditioning equipment "Vispaire Frame"
  2. Reinforcement of existing beam after hole cutting: "Redouble Method"
  3. Leave the drainage repair work to us! "Neplus Method Construction Achievement Case Collection" 高橋土建
  4. 4 Rigid urethane coating waterproofing HU-B method 化研マテリアル
  5. 5 Special foundation roller painting method for interior and exterior finishes "Fine FR Method" エスケー化研

Construction method Product List

2236~2250 item / All 3137 items

Displayed results

Pipeline Renewal Insertion Method 'SDF Method'

Can be inserted without selecting the bending angle of existing pipes! Long pipes can be manufactured, reducing construction time!

The "SDF Method" is a new technique for renewing pipelines by inserting stainless steel flexible pipes into existing aged pipes of small to medium diameter, including those with bends, which cannot be constructed using conventional insertion methods. Since it can be inserted regardless of the bend angle of the existing pipe, fewer construction piles, such as vertical piles, are needed compared to other methods. Additionally, the ability to manufacture long pipes allows for reduced construction time, and both the starting and reaching piles can be made smaller than with other methods, resulting in less road surface restoration area, less construction-generated soil, and reduced generation of industrial waste. 【Features】 ■ Can be inserted regardless of the bend angle of the existing pipe ■ Shortened construction time due to the ability to manufacture long pipes ■ Reduction in road surface restoration area, construction-generated soil, and industrial waste ■ Excellent long-term corrosion resistance and durability ■ No occurrence of rust lumps or other issues due to corrosion, with no impact on water quality *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic-resistant and vibration control construction method "Magellan"

Introducing reinforcement technologies for disaster-resistant buildings that excel in property preservation and business continuity plans, preventing collapse and ensuring seismic safety!

"Magellan" has been developed not only to protect steel and wooden structures from earthquake damage (such as severe destruction or collapse) but also to minimize damage to non-structural components, serving as a multifunctional disaster mitigation reinforcement material that excels in property preservation and corporate business planning. We offer two installation methods: the "brace type" for use at column-beam joints and the "strut type" for openings and walls. It enhances structural strength, absorbs energy, suppresses interlayer displacement, and reduces the anxiety of shaking. [Features] ■ Effective for seismic resistance and vibration control ■ Installation methods include brace type and strut type ■ Maintenance-free ■ Applicable to over 90% of the floor area of steel buildings ■ Lightweight and cost-effective *For more details, please refer to the PDF materials or feel free to contact us.

  • Earthquake-resistant construction method
  • Earthquake-proof and vibration-damping equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground Replacement Method "Light Drain Columbus"

Introducing ground improvement that replaces weak ground and narrow sites with lightweight ground materials!

"Light Drain Columbus" is a ground replacement method that was born from a shift in thinking to replace the surface ground with lightweight materials, thereby reducing the burden on the ground. Please consider this method in cases where the depth of the soft layer is deep, making piling costs excessively high, or in "soft ground" where cement-based improvements are difficult, as well as in "narrow sites" where the entry of large machinery such as pile drivers is challenging. 【Consider this method in the following situations (partial list)】 ■ Soft ground ■ Transition from pile foundations to direct foundations ■ Liquefaction ■ Archaeological designated areas ■ Earthquakes *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground improvement
  • Ground foundation construction method
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground Replacement Method "Light Drain Columbus Method"

To ensure that buildings continue to stand safely for a long time! Protecting buildings from the ground during frequent earthquakes.

The "Light Drain Columbus Method" uses EPS in a shape developed by our company, laid under the foundation and floor slab. By placing a thick layer of EPS (air layer) between the foundation concrete and the ground, it cuts off the edges and reduces vibrations (horizontal and vertical) from the ground. This prevents resonance in vibrating buildings and minimizes the energy of the vibrations. Additionally, during disasters or prolonged power outages without heating or cooling, it effectively utilizes natural energy, allowing for comfortable living without strain. 【Features】 ■ Utilizes natural energy ■ Enhances the durability of the foundation (floor slab) ■ Protects buildings from the ground during frequent earthquakes ■ Minimal temperature difference between the underfloor and indoor spaces ■ Allows for integrated use of underfloor and indoor spaces *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method
  • Heat insulation and heat shielding methods
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Technology Examination Certification (Building Technology) Report

We would like to introduce the construction technology examination certification report for the "Light Drain Columbus Method" (Building Technology).

This document is the construction technology review certification report for the ground replacement method "Light Drain Columbus Method." It includes the technology subject to review certification, development goals, review certification results, the history of the review certification, and details of the review certification. Please take a moment to read it. [Contents] ■ Overview ■ Details of the review certification ■ Materials *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method
  • Heat insulation and heat shielding methods
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Disaster recovery and disaster prevention construction method "Expanded Polystyrene Particle Lightweight Concrete"

Packaging improves workability and shortens construction time! It is possible to design to reduce slip failure stress.

"Expanded Polystyrene Particle Lightweight Concrete" has moderate fluidity and can be poured into free shapes. It is possible to design a mix that has underwater non-segregation properties. Unlike lightweight mixed soil, EPS lightweight materials, concrete materials, and natural ground materials, it is a uniform ground material that can be adjusted to appropriate unit weight and strength, making it effective in reducing ground consolidation settlement. [Features] ■ It is possible to design a mix with underwater non-segregation properties. ■ It has moderate fluidity and can be poured into free shapes. ■ It is possible to design to reduce slip failure stress. ■ Bagging improves workability and shortens construction time. *For more details, please refer to the PDF document or feel free to contact us.

  • Ground improvement
  • Civil Engineering Method
  • Ground improvement materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Fine Sheet Method

Can be used as a non-slip surface on sidewalks and stairs! A freezing prevention method using flexible adhesive sheets.

The "Fine Sheet Method" is a freeze prevention technology developed with the concept of simply "sticking" a soft, sheet-like elastic paving material called "Fine Sheet" onto existing pavement. The use of rubber chips allows for brightening, which can enhance the alertness effect. The ice on the road surface can crack under the weight of ordinary vehicles, demonstrating freeze prevention effects even on residential roads. 【Features】 ■ Easily prevents freezing by simply applying it ■ Has an alertness effect ■ Provides freeze prevention effects even with small-scale construction without using large machinery ■ Brightening is possible with the rubber chips used ■ Can be applied on existing pavement *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP lining method "SST2-Spray Up"

Achieve cost reduction and short-term construction. In addition to a 10-year warranty, you can also enroll in oil leak insurance.

"SST2-Spray Up" is an FRP lining method that can be completed in as little as 3 days. It can be applied to a wide range of tank types, including above-ground tanks (large and extra-large) and underground tanks. Additionally, the glass fibers form a uniform 3D structure, achieving high strength. Furthermore, there are no unpleasant odors typically associated with conventional FRP lining sites. 【Features】 ■ Safe and secure ■ Completed in just 3 days ■ Strong high corrosion resistance ■ High strength and durability ■ Low cost *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Pipeline Construction
  • Waste treatment facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Roof Shade"

Patent obtained! Heat insulation method for corrugated roofs!

This construction method is a heat insulation technique for corrugated roofs that achieves an astonishing heat insulation effect. By covering the upper surface of the corrugated roof with a shade sheet that provides heat insulation, it suppresses the rapid rise in indoor temperatures during the summer. It dramatically reduces the power consumption of factories, offices, warehouses, stores, and various facilities. Furthermore, due to the reduction in annual air conditioning load, it helps to lower carbon dioxide emissions, contributing to environmental conservation. 【Features】 ■ Achieves astonishing heat insulation effect with zero running costs ■ Reduction in power consumption ■ Realization of low costs ■ Short construction time possible ■ Excellent durability *For more details, please contact us or download the catalog.

  • Heat insulation and heat shielding methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Two-by-four construction method 'Union Frame'

Energy-saving and durability! The simple structure allows for a beamless design, enhancing the flexibility of the layout.

"Union Frame" is a two-by-four construction method (frame wall construction) that achieves a reduction in the number of days for floor processes due to its simple structure. By using domestic materials, it contributes to society. It excels in earthquake resistance and fireproof performance. In addition to reducing delivery burdens by approximately 20% due to reduced material volume, it allows for construction on narrow sites without the need for a crane. 【Features】 ■ Earthquake resistance and fireproof performance ■ Mid-rise and high-rise structures ■ Energy-saving and durability performance ■ Contribution to society through the use of domestic materials ■ Increased floor strength *For more details, please refer to the PDF materials or feel free to contact us.

  • Wood panel and frame wall construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Advanced metalworking method "Presetter" [Achieving strong structures and low costs!]

An advanced hardware method that realizes diverse needs required for modern wooden houses at a high level!

"Presetter" is an advanced hardware construction method that meets the diverse needs required for modern wooden houses at a high level. Structural materials processed through computer management at a precut factory are delivered with hardware attached. This allows for accurate and smooth construction according to the design plans, eliminating mistakes and waste while building a strong structure, and contributing to cost reduction and improved work efficiency unique to "Presetter." Additionally, a comprehensive system based on the perspective of the construction site enables speedy construction of high-quality and strong homes. 【Features】 ■ Speedy on-site work ■ High-precision processing and assembly ■ Sturdy assembly with strong joint strength ■ Convenient compact packaging for storage and transport ■ Beautiful finish *For more details, please request materials or view the downloadable PDF data.

  • Special Construction Method
  • Support hardware/opening hardware

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Insulation Material Pre-Cutting Method "Raku-Pure"

Shortening construction time due to a shortage of carpenters! A method that reduces the average construction time from 1 day to about 1 hour.

"Raku-Pure" is a construction method that solves various issues on site, such as the increase of waste materials and decreased workability. According to energy-saving housing guidelines, the thickness of insulation materials is on the rise, leading to an increase in the number of materials used. However, with this method, there is no waste generated, eliminating disposal costs. [Features] ■ Reduced construction time ■ No waste generated ■ No disposal costs for waste materials ■ Improved yield ■ Prevention of losses due to mistakes on site *For more details, please refer to the catalog or feel free to contact us.

  • Urethane foam
  • Heat insulation and heat shielding methods
  • Hard urethane foam

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Jakago Method "RIO Planter, Bench, Wall"

Strong and elegant! Jakago method using the highest quality zinc-coated iron wire with aluminum.

The "RIO Planter Bench Wall" uses top-class zinc-coated iron wire with 10% aluminum, employing the Jakago method. It offers rust prevention for 20 to 30 years, boasts exceptional strength, and structural calculations are possible. We provide design and estimation proposals tailored to your location. Please feel free to consult us when needed. 【Features】 ■ Uses top-class zinc-coated iron wire with 10% aluminum ■ 20 to 30 years of rust prevention ■ Exceptional strength and structural calculations possible ■ Design and estimation proposals tailored to your location *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Direct Tile Adhesive Method "HI-CAT Method"

Stable adhesion! It has an average strength of over 1.0 N/mm³ with failure from the substrate surface.

The "HI-CAT Method" is a direct tile installation method for tunnel interiors, conducted under consistent construction management from substrate treatment to adhesive application, tile installation, and cleaning, ensuring safety and reliability. Compared to traditional mortar tile installation methods, this method uses epoxy resin-based adhesives, demonstrating superior performance in terms of construction speed (shortened construction period) and tile adhesion strength (prevention of detachment). 【Features】 ■ Low incidence of detachment accidents and tile scattering ■ Average strength of over 1.0 N/mm³ from structural damage ■ Stable adhesion ■ Usable year-round (no freezing) *For more details, please refer to the PDF document or feel free to contact us.

  • Tunnel Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration