iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      36703items
    • Facilities
      Facilities
      57491items
    • Lighting and Interior
      Lighting and Interior
      17484items
    • Common materials
      Common materials
      37167items
    • Civil Engineering Materials
      Civil Engineering Materials
      10046items
    • Construction, work and methods
      Construction, work and methods
      28697items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29725items
    • IT/Software
      IT/Software
      33267items
    • others
      others
      81065items
    • Store and facility supplies
      Store and facility supplies
      4581items
    • Office and commercial supplies
      Office and commercial supplies
      11685items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      1025items
    • Logistics Equipment
      Logistics Equipment
      7300items
    • Energy and Resources
      Energy and Resources
      12089items
  • Search for companies by industry

    • Information and Communications
      7309
    • others
      7204
    • Building materials, supplies and fixtures manufacturers
      6581
    • Service Industry
      4708
    • Trading company/Wholesale
      3032
    • Other construction industries
      2428
    • Electrical equipment construction business
      660
    • Interior Design
      520
    • Construction Consultant
      502
    • Facility Design Office
      491
    • retail
      361
    • Architectural design office
      357
    • General contractors and subcontractors
      343
    • Warehousing and transport related industries
      324
    • Electricity, Gas and Water Industry
      287
    • Interior construction business
      279
    • Medical and Welfare
      275
    • Building Management
      264
    • Educational and Research Institutions
      253
    • Renovation and home construction industry
      221
    • Housing manufacturers and construction companies
      211
    • Water supply and drainage construction business
      202
    • Transportation
      166
    • Real Estate Developers
      158
    • Fisheries, Agriculture and Forestry
      128
    • Structural Design Office
      65
    • Finance, securities and insurance
      41
    • self-employed
      31
    • Restaurants and accommodations
      30
    • Mining
      26
    • Public interest/special/independent administrative agency
      20
    • Police, Fire Department, Self-Defense Forces
      17
    • Store and building owners
      9
    • Government
      9
    • Individual
      9
    • Property Owner
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Construction Consultant
  • Facility Design Office
  • retail
  • Architectural design office
  • General contractors and subcontractors
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • Interior construction business
  • Medical and Welfare
  • Building Management
  • Educational and Research Institutions
  • Renovation and home construction industry
  • Housing manufacturers and construction companies
  • Water supply and drainage construction business
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • self-employed
  • Restaurants and accommodations
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Government
  • Individual
  • Property Owner
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. ProductSearch
  3. Construction, work and methods
  4. Construction methods and technologies
  5. Special Construction Method
  6. Solving issues with construction methods! "Case Studies for Problem Solving Available"

Solving issues with construction methods! "Case Studies for Problem Solving Available"

  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

last updated:Apr 27, 2022

ヤスダエンジニアリング
ヤスダエンジニアリング
  • Official site

The advancement construction method often faces many challenges during the excavation process. Here are examples of how those problems were solved!

Have you ever faced any of these issues when performing construction using thrusting methods? ▶ Construction was halted due to encountering obstacles like wooden stakes or H-beams... ▶ The time and cost of construction increased, leading to delays or interruptions... ▶ Construction over difficult distances could not be managed with standard equipment and methods... The "Milling Mole Method" solves these problems associated with thrusting methods! 【Example of a resolved case】 ✔ Sewer construction in Osaka City Planned to push 127 meters in one span using a standard mud slurry method with a diameter of φ80mm. Immediately after starting, the machine encountered wooden stakes, making it impossible to proceed, and the excavation was halted. By changing the plan to adopt the Milling Mole Method, the presence of obstacles was confirmed by discharging wood chips, and the thrusting was completed. ✔ Sewer construction in Osaka Prefecture Planned to push 119 meters in one span using a standard mud slurry method with a diameter of φ1800mm. While excavating about 10 meters, the machine encountered support piles of a bridge pier, making it impossible to proceed, and both the excavation machine and thrusting pipe were left underground. By changing the plan to adopt the Milling Mole Method, re-excavation was carried out from the same launch shaft. The reinforced concrete pipe that became an obstacle was cut, and the discharge of metal fragments, thrusting pipe collars, and rebar was confirmed, allowing safe passage through the obstacle section, and the thrusting was completed. *We are currently providing materials such as "Case Studies of Problem Solving" and "Comparison of Methods for Dealing with Obstacles in Thrusting Methods" from the PDF!

    Sewerage facilitiesSpecial Construction Method
ya.jpg

Solving issues with construction methods! "Case Studies for Problem Solving Available"

ya.jpg
ya.jpg
  • Related Link - http://www.yasuda-eng.co.jp/

Inquire About This Product

  • Contact Us Online
  • Download catalog

basic information

Example of a resolved case, among others: ✔ Sewage construction in Osaka Prefecture A plan to advance 229 meters in one span using a standard mud slurry method with a diameter of 1000 mm. During pre-construction consultations, it was discovered that H-beams were present underground. The plan was changed to adopt the milling mole method, confirming the presence or absence of obstacles (H-300) at two locations through the discharge of metal fragments, and the advancement was completed. ✔ Sewage pipe installation work in Osaka Prefecture Encountered a steel sheet pile left underground during previous construction, rendering advancement impossible, and the tunneling machine was left underground for many years. It was discovered that steel sheet piles type III were also present in the re-planned pipeline section. The milling mole method was adopted, confirming the presence or absence of obstacles through the discharge of metal fragments, and the advancement was completed. ✔ Water supply pipe installation work in Osaka Prefecture A plan to advance 72 meters in one span using a small diameter of 500 mm was implemented. During approximately 20 meters of advancement, the machine encountered an old stone embankment, making advancement impossible, and the tunneling machine was pulled back, interrupting the work. The plan was changed to adopt the milling mole method, confirming the presence or absence of obstacles through the discharge of stone blocks, and the advancement was completed. *Please download the PDF or contact us for more information.

Price range

Please contact us for details

Delivery Time

Please contact us for details

Applications/Examples of results

Advancement construction method

catalog(3)

Download All Catalogs
[Presenting Construction Achievements] Milling Mold Method - Performance Collection by Obstacle Type

[Presenting Construction Achievements] Milling Mold Method - Performance Collection by Obstacle Type

TECHNICAL
  • E-book viewing
  • Catalog download

Contact this catalog

[Presenting Construction Achievements] Milling Mold Method - Collection of Achievements by Obstacle Type 2

[Presenting Construction Achievements] Milling Mold Method - Collection of Achievements by Obstacle Type 2

TECHNICAL
  • E-book viewing
  • Catalog download

Contact this catalog

Comparison of obstacle handling methods in advanced construction methods

Comparison of obstacle handling methods in advanced construction methods

TECHNICAL
  • E-book viewing
  • Catalog download

Contact this catalog

Company information

ヤスダエンジニアリング

ヤスダエンジニアリング

General contractors and subcontractors

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
  • Official site
Phone number/address

Yasuda Engineering Co., Ltd. has been a specialized company in public sewer construction, contributing to the environmental development of the local community since its establishment in 1975. We have pursued sound management and advanced technical capabilities, continuing to make steady progress. In 2001, we acquired the international standard "ISO9001" and expanded into the field of general civil engineering. We aim to be a corporate group capable of continuous innovation as a comprehensive construction company, including building construction. "Honing our technology with rich sensibility, we evaluate from a fair perspective to enhance the vitality of the company in order to meet our customers' needs." This is the management policy of Yasuda Engineering Co., Ltd. We, Yasuda Engineering Co., Ltd., are committed to uniting all employees to refine our technical skills and create a new future.

Product/Service List (51)

Popular products in related categories

Non-excavation method "Advancement method"
Construction, work and methods
Non-excavation method "Advancement method"
機動建設工業
What is the thrust construction method?
Construction, work and methods
What is the thrust construction method?
アサヒエンジニアリング
Solving issues with construction methods! "Case Studies for Problem Solving Available"
Construction, work and methods
Solving issues with construction methods! "Case Studies for Problem Solving Available"
ヤスダエンジニアリング
Introduction to the "Advancement Construction Method"
Construction, work and methods
Introduction to the "Advancement Construction Method"
近藤建設
FCR Promotion Method (Steel Pipe Type) [FCR Method Association]
Construction, work and methods
FCR Promotion Method (Steel Pipe Type) [FCR Method Association]
FCR

Related New Products

Install the valve without stopping the water! 'EM Continuous Water Valve Method'
Construction, work and methods
Install the valve without stopping the water! 'EM Continuous Water Valve Method'
SUIKEN Co., LTD
Low-temperature welding and casting welding method "Arc Meister"
Construction, work and methods
Low-temperature welding and casting welding method "Arc Meister"
カナエ
Kuzu (Japanese arrowroot) countermeasure "Tsuru Guard Method" NETIS registered
Construction, work and methods
Kuzu (Japanese arrowroot) countermeasure "Tsuru Guard Method" NETIS registered
白崎コーポレーション グリーンナップ事業
Kuzu (Japanese arrowroot) countermeasure "High Durability Vine Guard Method" NETIS registered
Construction, work and methods
Kuzu (Japanese arrowroot) countermeasure "High Durability Vine Guard Method" NETIS registered
白崎コーポレーション グリーンナップ事業
CAS-C method [Chimney Asbestos Countermeasures]
Construction, work and methods
CAS-C method [Chimney Asbestos Countermeasures]
エコ・24 本社

The related categories of Sewerage facilities

  • Construction, work and methods
  • Construction methods and technologies
  • Special Construction Method
  • Civil Engineering
  • Sewerage facilities
Find products and companies by related keywords
  • #Construction method
  • #Jacking method
          

Inquire About This Product

  • Contact Us Online
  • Download catalog

Products

  • Search for Products

Company

  • Search for Companies

Special Features

  • Special Features

Ranking

  • Overall Products Ranking
  • Overall Company Ranking

support

  • site map
IPROS
  • privacy policy Regarding external transmission of information
  • terms of service
  • About Us
  • Careers
  • Advertising
IPROS Services
  • >IPROS GMS | Search site for the manufacturing industry
  • >IPROS | Search site for the B2B industry
COPYRIGHT © 2001-2026 IPROS CORPORATION ALL RIGHTS RESERVED.
Please note that the English text on this page is automatically translated and may contain inaccuracies.