Construction method Product List and Ranking from 1597 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 日本海洋サービス 大阪支店 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 Temporary bridge temporary pier cable-stayed construction method "LIBRA Method" 横山基礎工事

Construction method Product List

2056~2070 item / All 4237 items

Displayed results

[Construction Case] Fukushima Prefecture, Soma Port Port Maintenance Management Work (Quay Restoration)

Due to ground subsidence at the harbor's quay, there are steps and depressions in the concrete pavement, resulting in the loss of water gradient and the formation of puddles. This issue is resolved using the Upcon method.

The Upcon method, which allows for modifications without breaking existing concrete pavement slabs and within a short construction period, has been widely adopted in public works such as roads and airports as a maintenance and repair method. This time, we will introduce a construction site for correcting the sinking of concrete pavement slabs and filling voids at a quay in a port. The quay at Soma Port in Fukushima Prefecture, where cargo loading and unloading occurs frequently, has experienced issues due to ground subsidence, resulting in steps and sinking in the concrete pavement slabs, eliminating the water slope and causing puddles. This has hindered cargo operations. The Upcon method was chosen because it has no environmental impact compared to other methods and can correct the existing slabs without removal in a short period. [Site Information] Soma Port Port Maintenance Management Work (Quay Restoration) Construction Area: Approximately 285 square meters Maximum Subsidence: 97mm Construction Period: 4 days For detailed information on the construction process, please refer to the PDF download below.

  • Harbor Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Correction Work for Subsidence of Logistics Warehouse - Leveling Adjustment

"A slope was installed due to the formation of a step in the floor." "The floor has sunk, causing cracks." Resolved with the up-construction method.

This time, we will introduce a construction case of a logistics warehouse in Niigata Prefecture. In this logistics warehouse, ground subsidence caused unevenness and cracks in the concrete floor, which hindered the movement of carts and work operations. The Upcon method allows for construction to be carried out without stopping operations and within a short construction period. Additionally, during the injection of polyurethane resin, a surveyor is always present to manage the floor level to the millimeter, ensuring a high-quality finish. 【Site Information】 Niigata Prefecture / Logistics Warehouse Construction Area: 1,148 square meters Maximum Subsidence: 71mm Construction Period: 8 days

  • Foundation construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Filling Work for Void Under Concrete Pavement Slabs of Kanmon Tunnel

Fiscal Year 2013 Shimonoseki Area Preservation Work (Kanmon Tunnel Concrete Pavement Slab Void Filling Work)

The Kanmon Tunnel connecting Fukuoka Prefecture and Yamaguchi Prefecture. When large vehicles pass through the toll booth near the tunnel entrance and exit, vibrations were occurring in the nearby residential area. An investigation conducted by FWD revealed the presence of voids believed to be the cause of the vibrations directly beneath the concrete pavement slabs. The Upcon method is a technique that involves injecting rigid polyurethane resin beneath the concrete pavement slabs. The filling and compaction effects of the polyurethane can resolve the loosening and voids in the subgrade that cause vibrations. The Upcon method was adopted with the aim of suppressing slab vibrations by improving the environment of the upper subgrade. 【Site Information】 Fukuoka Prefecture - Yamaguchi Prefecture / Kanmon Tunnel Total construction area: Approximately 200 square meters Construction period: 2 nights

  • Road construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Emergency restoration method "Dantan": A new technique by the sinking correction expert Upcon.

Quickly restore road unevenness and depressions during an earthquake with polyurethane resin, enabling swift vehicle passage. Contributing to the establishment of emergency transportation routes!

The new method "Emergency Restoration Method Dantan" developed by Upcon involves spraying high-strength polyurethane resin onto road unevenness caused by disasters during earthquakes to create a slope, enabling temporary vehicle passage for the early establishment of emergency transportation routes. A truck equipped with all necessary materials rushes to the site and sprays a two-component polyurethane resin onto the created unevenness. The high-strength polyurethane resin has the property of hardening immediately after spraying, allowing for vehicle passage within 15 minutes after the slope is created. Additionally, it can be used to repair not only unevenness but also depressions and subsidence. Features of the Emergency Restoration Method Dantan: - Ability to create slopes tailored to the shape of the disaster-affected site - Resolution of unevenness in about one hour, allowing immediate vehicle passage Furthermore, it has a proven track record in correcting tilts and unevenness of concrete floors and pavement slabs caused by earthquakes or ground subsidence, as well as filling voids. [Exhibiting at EE Tohoku '23] We will be exhibiting at the comprehensive exhibition of new technologies, EE Tohoku '23. At our booth, we will conduct demonstrations using polyurethane resin. Location: Yume Messe Miyagi Dates: June 7 (Wed) - 8 (Thu) Booth No: West Hall Exhibition B-708

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Highway Toll Booth Concrete Pavement Leveling

Quickly repair the unevenness of the concrete pavement slabs at the highway toll booth.

A step in the concrete pavement caused by sinking. It affected vehicle movement when passing through the toll booth on the highway. We injected polyurethane resin under the sunken concrete pavement slab and corrected the 30mm step in a short time. 【Site Information】 Ehime Prefecture Total construction area: Approximately 12 square meters Construction period: One night Maximum step height: 30mm Please watch the fast-motion video showing the concrete pavement slab being lifted by the foaming pressure of the polyurethane resin from below.

  • Road construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Concrete slab sinking correction method" contributes to the longevity of social infrastructure.

Using high-strength urethane resin, we will correct the deformations such as subsidence, steps, flapping, gaps, and cavities that have occurred in the concrete slab, without excavation and within a short construction period.

The Upcon concrete slab settlement correction method (KT-080008-A, NETIS registration period ended in October 2014) quickly resolves issues such as settlement, unevenness, flapping, gaps, and voids that occur in concrete pavement slabs commonly used in highways and other areas, using specially developed high-strength polyurethane resin. It achieves a short construction period by utilizing a highly mobile plant without breaking the existing pavement slabs or requiring excavation work. This minimizes the period of service suspension and has a proven track record as a planned and efficient method for maintaining social infrastructure. This technology is also adopted not only for highways but also for repair work in ports and airport aprons, as well as disaster recovery work. Upcon will exhibit at the "Highway Techno Fair 2023," where cutting-edge technologies supporting highways will be showcased. Date: November 9 (Thursday) and 10 (Friday), 2023, from 10:00 to 17:00 Location: Tokyo Big Sight, West Hall 3 Exhibition Booth No: A-04 On that day, there will also be a demonstration of settlement correction using polyurethane resin. We invite you to take this opportunity to see it. We look forward to your visit.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Short-term Correction: Certain Food Warehouse Void Filling Work

Upcon construction method using rigid polyurethane foam! Introducing a case where a cavity was corrected in three days.

We would like to introduce a case of "void filling work" conducted at a certain food warehouse in Kanagawa Prefecture. Using the Upcon method, which allows for the filling of voids that developed under the floor with polyurethane resin in a short period, we corrected a maximum void of 270mm (with a construction area of approximately 171m2) in just three days. After the resin filling, we checked the filling condition with a CCD camera and used non-shrink mortar to seal the injection holes. 【Case Overview】 ■ Construction Area: Approximately 171m2 ■ Maximum Void Size: 270mm ■ Location: A certain food warehouse in Kanagawa Prefecture ■ Construction Period: 3 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Construction without moving the rack: Warehouse subsidence correction (Fukushima Prefecture)

No need to remove heavy racks or machinery! Here is a case where modifications were completed in just 4 days.

We would like to introduce a case of settlement correction implemented at a warehouse in Fukushima Prefecture. Due to the effects of the Great East Japan Earthquake that occurred in 2011, gradual settlement progressed over the years. After a few years, floor sagging and tilting began to occur inside the warehouse, and inclinations also developed in the rack installation areas. This caused issues such as the forklift forks not fitting properly, leading to "longer loading and unloading times," which disrupted operations and caused difficulties. In this project, we adopted the Upcon method, which allows for construction without moving heavy racks in a short construction period. We were able to correct an area of approximately 1,250 m² in just four days (with a maximum settlement of about 78 mm). [Case Overview] - Construction Area: Approximately 1,250 m² - Maximum Settlement: 78 mm - Location: Warehouse in Fukushima Prefecture - Construction Period: 4 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Void Filling Work (Tokyo)

A gap or cavity of approximately 200mm at most occurred! A case where it was resolved in one day using the up-con method.

We would like to introduce a case of "void filling work" conducted on a slab foundation house located in Tokyo. Due to ground subsidence, the ground level has lowered, resulting in the formation of voids beneath the slab foundation of the house. The voids were resolved in a single day of construction. 【Case Overview】 ■ Maximum void: Approximately 200mm ■ Area: Tokyo ■ Construction period: 1 day *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Filling voids and correcting unevenness in CO pavement slabs inside highway tunnels.

Filling the voids and correcting the unevenness in the concrete pavement slabs inside the highway tunnel without excavation and within a short construction period.

【Customer Consultation and Issues】 A gap of up to 40mm has developed in the concrete pavement slabs within the highway tunnel, resulting in a height difference of up to 64mm due to fluttering. Patching materials were used to address the height differences, but to eliminate the discrepancies in the concrete pavement slabs, we adopted Upcon's concrete slab settlement correction method. This method allows for height correction within a short construction period without breaking the existing concrete pavement slabs. The gaps are filled with polyurethane resin, which expands on its own to fill the voids completely. The polyurethane resin injected beneath the concrete slabs flows into the crushed stone layer of the subbase, resolving any looseness in the surface layer and using the pressure from its foaming and expansion to lift the concrete pavement slabs and eliminate the height differences. 【Site Information】 Hiroshima Prefecture Total Construction Area: 653 square meters Construction Period: 10 nights

  • Road construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Fireproof box (for shared living spaces) box method

Ideal for intercom installation in shared living areas! A simple type that can be installed after cable wiring.

The "Fireproof Box (for Shared Living Spaces) Box Method" is a construction method that can be applied to hollow wall shared living spaces. It is a simple type that can be installed after cable wiring, allowing for visual confirmation of the filling even after installation. It is ideal for intercom installation areas in shared living spaces. 【Features】 ■ Installed in hollow wall shared living spaces ■ Simple type that can be installed after cable wiring ■ Allows for visual confirmation of the filling even after installation ■ Ideal for intercom installation areas in shared living spaces *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Water Treatment Conditioner "CALFA BAS"

No phosphates, no nitrogen, no polymers used at all! An environmentally friendly cooling tower water treatment conditioner!

Environmentally Friendly Water Treatment Conditioner for Cooling Towers ~ Phosphate-free / Nitrogen-free / No Polymers ~ 'CALFA BAS' Solving cooling tower issues (silica and calcium scale) and reducing heat exchange with amorphous solid water treatment technology recognized in the environmentally advanced EU! - This is a simple, safe, reliable, and economical water treatment conditioner made only from "natural inorganic components," which replaces the current management of circulating cooling water using organic compound chemicals. It efficiently removes silica scale that adheres to heat exchangers, maintaining optimal performance at all times, achieving significant energy savings and cost reductions. A different grade, 'CALFA BAS ~Free~', is also available, which contains no components subject to the Water Pollution Prevention Act, Sewerage Act, or total water quality regulation, making it 'discharge regulation-free'!! A 100% environmentally protective conditioner has arrived! Only CALFA BAS can safely "remove and prevent silica scale." * 'CALFA BAS' is a registered trademark of Calfa Chemical Co., Ltd. Please be cautious of "similar products" and "imitation products (counterfeit goods)."

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Floor Surface Grinding Machine "Grooving Cutter"

Compatible with "CT-250"! For resin mold removal, concrete leveling, and more!

Our company has accumulated various construction methods and machinery know-how, and we offer a lineup of high-quality substrate processing attachments. The "Grooving Cutter" is a floor grinding machine that can be used for resin mortar removal and concrete leveling. It is compatible with the "CT-250." 【Features】 ■ Applications: Resin mortar removal, concrete leveling, etc. ■ Compatible models: CT-250 *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Work tools

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Floor Surface Grinding Machine "T/C Cutter"

Compatible with "CT-200"! For grinding and removal of concrete surfaces and leveling down!

Our company has accumulated various construction methods and machine know-how, and we offer a lineup of high-quality substrate processing attachments. The "T/C Cutter" is a floor grinding machine that can be used for the grinding removal of coated flooring materials and concrete surfaces, as well as for concrete leveling. It is compatible with models such as "CT-200," "CT-250," and "Thunderbird 20." [Applications] ■ Grinding removal of coated flooring materials and concrete surfaces ■ Concrete leveling, among others *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Work tools

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Floor Grinding Machine 'HTC DURATIQ 6'

HTC's top-tier series 'DURATIQ' - for removing existing floor coatings and roughening concrete! A floor grinding machine with excellent workability.

We offer a wide range of sizes and grades of grinding and polishing machines, the "Diamond Floor Grinder Series," tailored to meet your needs. From edge work to thousands of square meters of construction, we accommodate substrate processing for natural stone, concrete, and wooden floors. The "HTC DURATIQ 6" can be used for existing floor coating removal, concrete roughening, epoxy and other floor surface polishing, adhesive removal, concrete smoothing, and wooden floor polishing. 【Features】 ■ Easy grinding operations and transportation with the remote control system ■ Enhanced grinding capability with the redesigned 4-head disc ■ Complete dust sealing with a flexible head cover ■ Increased tool durability with the new mist cooler system ■ Quick, easy, and safe tool exchange system ■ Low vibration, low noise, and dust-free operation *Some of the downloadable PDF materials are available in English. For more details, please feel free to contact us.

  • Concrete construction
  • Waterproofing work
  • Plastering and painting work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration