Piping and wiring embedding system! Avoid obstacles with vertical and horizontal curves! Reduce total costs! "Challenging the creation of lifelines that run through the Earth and underground!"
With the acceleration and advancement of urban functions, the development of various lifelines such as water supply and drainage, electricity, gas, and communication is becoming increasingly important. The HDD method (Horizontal Directional Drilling) / TerraJet is a construction method that allows for the installation of pipes and cables without excavation, reducing traffic disruption and soil disposal issues. It enables clean and highly safe construction by detecting the construction position from the surface and advancing in an arc direction both horizontally and vertically. Additionally, it eliminates the need for traditional shaft construction, allowing for a simplified shaft, which shortens the construction period and reduces total costs. In recent years, disasters have become more severe, and as lifelines age, the renewal and seismic retrofitting of aging pipes are being promoted from the perspective of improving disaster resilience. The HDD method (Horizontal Directional Drilling) / TerraJet is gaining attention as a method for burying water supply and drainage pipes, gas pipes, electric cables, and communication lines underground. 【Features】 - Flexibility and adaptability - Shortened construction period - Economically low cost - Harmony with the natural environment - Safety For more details, please contact us or download the catalog.
Inquire About This Product
basic information
【Construction Method Overview】 〇 Applicable buried pipes: Water supply and drainage, agricultural water, industrial water, power and communication, gas 〇 Applicable buried pipe materials: Polyethylene pipes, steel pipes, PVC pipes, E-flex pipes 〇 Standard applicable pipe diameter (nominal diameter): Up to Φ500mm ○ Standard construction length: Up to 250m ○ Burial depth (detection depth): Maximum 12m ○ Curvature radius: 12m to 50m ○ Applicable soil types: Clay to bedrock 【Drill Machines】 〇 TERRA 5515 (4015) Standard type 〇 TERRA Mini Jet Mini type (installed in vertical shafts) 〇 TERRA 8522 Large type ● For more details, please contact us or download the catalog.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
For more details, please contact us or download the catalog.
catalog(2)
Download All CatalogsCompany information
Expansion of development targets. Consideration for the environment. Increased awareness of safety. Development has always presented new concepts to our company. Each time, we have made every effort to introduce new technologies and equipment, realizing the provision of required services. We possess all the know-how related to civil engineering and respond flexibly to needs. This "strength" of Toyo Construction is an invaluable asset woven from the history shared between us and society.