Construction method Product List and Ranking from 1591 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Jan 28, 2026~Feb 24, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jan 28, 2026~Feb 24, 2026
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. エルニード協会 Kagawa//Other construction industries
  3. 丸八土建 Mie//General contractors and subcontractors
  4. 4 HOKOKU ENGINEERING CO.,LTD. Osaka//Other construction industries
  5. 5 シーカ・ジャパン Tokyo//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Jan 28, 2026~Feb 24, 2026
This ranking is based on the number of page views on our site.

  1. Soil Coating Method "PoliSoil Greening" <NETIS Registered> 丸八土建
  2. 地下水・軟弱地盤対応の基礎工法『スーパーラップルエルニード工法』 エルニード協会
  3. Foundation Omega Method HOKOKU ENGINEERING CO.,LTD.
  4. 4 Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  5. 5 Hybrid Concrete Reinforcement Method "Solid Remain Alpha"

Construction method Product List

3451~3480 item / All 4287 items

Displayed results

Minister of Land, Infrastructure, Transport and Tourism Certified Construction Method "Ultra Pile/Gaia Pile Method"

Proven support strength and confirmation of the supporting ground. We promise invisible peace of mind.

This construction method is a highly precise foundation pile technology that achieves consistent results without variation due to construction machinery or workers, thanks to its unique stop management system, resulting in increased bearing capacity. The rotary penetration method enables pile construction without residual soil. By not using any industrial waste (such as ground improvement materials or cement milk), it generates no leftover soil at all. Additionally, the unique shape of the pile tip provides significant bearing capacity, allowing for economical pile design. 【Features】 ■ Environmental conservation ■ High bearing capacity ■ Low noise and low vibration ■ Low cost ■ Space-saving ■ Wide range of support layers ■ High-performance construction machinery *For more details, please refer to the PDF materials or feel free to contact us.

  • Pile and foundation work
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

High-quality ground improvement method with minimal variation in strength【3S G Method】

Achieving high quality and high strength without being limited by the construction site! A new construction system established with unique technology.

Miho Technos Co., Ltd. is based in Yonago City, Tottori Prefecture, and we grasp the condition of the land through ground surveys, which can be considered a health check for the ground, and propose ground improvement methods suitable for the conditions. Ground improvement, in essence, refers to the artificial enhancement of the ground to maintain stability when constructing buildings, bridges, and other structures on it. The "Three S G Method," a type of ground improvement method, is a technique that achieves safer and more stable foundation construction. Depending on the purpose, various improvement forms can be selected, including pile types (pile arrangement, circular arrangement, lap arrangement), block types, and wall types. By utilizing a specialized mixing blade, we achieve high mixing efficiency, allowing for the construction of stable quality columns, making it applicable to sandy soil, clayey soil, and loamy ground. 【Features】 ■ Applicable to various improvement forms ■ Suitable for diverse soil types ■ Reliable construction management ■ Capable of adapting to various sites ■ Minimal generation of residual soil ■ Minimal impact on the surrounding environment *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Ground improvement
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to the DO-Jet Method

Solving underground obstacle issues in shield and propulsion methods with ultra-high-pressure jet application technology!

Our company employs the 'DO-Jet method,' which allows all operations to be conducted from the tunneling machine without using the surface at all. By injecting ultra-high-pressure jets from the tunneling machine, we perform cement-based ground improvement and cut and remove underground obstacles that have been left in the ground. 【Features】 ■ Since ground improvement is carried out from the tunneling machine without using the surface, it does not impact the surrounding environment. ■ Cutting underground obstacles from the tunneling machine enables safe and highly efficient construction. ■ Received the Excellence Award at the 14th (2012) National Land Technology Development Award. *For more details, please download the PDF or contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sinking Correction Method: Steel Pipe Pile Driving Method

The tip of the steel pipe pile is driven into the supporting layer! It is suitable when there is a layer of weak ground more than 1.5m under the building.

The "Steel Pipe Pile Driving Method" is a settlement correction method used when there is a layer of weak ground beneath a building that is more than 1.5 meters deep. The tip of the steel pipe pile is driven into the supporting layer. By correcting the building to a stable foundation, it is possible to reduce earthquake damage. The building's tilt is jacked up and leveled, restoring a comfortable and safe living environment. 【Features】 ■ 10-year warranty ■ Suitable when there is a layer of weak ground beneath the building that is more than 1.5 meters deep ■ The tip of the steel pipe pile is driven into the supporting layer ■ Reduces earthquake damage by correcting the building to a stable foundation ■ Restores a comfortable and safe living environment by jacking up and leveling the building's tilt *For more details, please refer to the PDF document or feel free to contact us.

  • Ground improvement
  • Residential foundations
  • Earthquake-resistant construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Foundation Reinforcement Method: Stubborn Old Man

Seven strong layers protect the foundation of your home! Even unreinforced foundations can be strengthened to 2 to 4 times their conventional strength.

If you leave cracks and fissures in the foundation unattended, the foundation will not be able to bear the load of the building during an earthquake. "Ganko Oyaji" is a subsidence correction method that achieves high-strength reinforcement exceeding that of new construction with seven robust layers, including carbon fiber. It can reinforce even unreinforced foundations to 2 to 4 times stronger than conventional methods. It possesses features such as high strength, high durability, shear strength, improved toughness, short construction periods, and low cost. 【Features】 ■ High strength, high durability, shear strength, improved toughness, short construction periods, low cost ■ Can reinforce even unreinforced foundations to 2 to 4 times stronger than conventional methods ■ Results of full-scale strength performance tests - Achieves 10 times the strength of steel plates and 1.5 times the strength of aramid fibers ■ Seven robust layers protect the foundation of your home *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground improvement
  • Residential foundations
  • Earthquake-resistant construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Small curved mirror option - dedicated mounting hardware for pole SK-30

Easy installation of garage mirrors.

The garage mirror option SK-30 is a mounting bracket specifically designed for poles with a diameter of 25 to 60mm. It has a wide effective range (25 to 60mm) and can be securely installed with just one wrench (for 13mm). 【Features】 - Can be mounted on poles ranging from 25mm to 60mm *For more details, please download the PDF or feel free to contact us.

  • Car and bicycle parking facilities
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to the "Advancement Construction Method"

We will respond with various methods suitable for different situations and ground conditions with a diverse range of variations.

Our company conducts various "advancement methods," including the Cobra method and pipe return method. In particular, regarding advancement construction, we have made various efforts and continuous pursuits, accumulating a track record of achievements. Please feel free to contact us if you have any requests. 【Lineup】 ■ Cobra Method ■ Pipe Return ■ Uncle Mall ■ Envi Liner *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pipe return method

Wide compatibility with construction conditions, soil types, and underground obstacles! Can be connected to existing pipes and existing manholes, etc.

This technology is a method that can extensively accommodate construction that is impossible with conventional methods, such as bit replacement during excavation in response to changes in soil conditions and direct connection to existing pipes. Bits, steel pipes, and excavation methods suitable for the soil type can be selected. Ground improvement can be performed from within the leading body. Additionally, the advancement of electronic devices has enabled a high-precision surveying management system. Direction correction and accuracy management can be performed in real-time. 【Features】 - The thrust pipe remains in place while the excavator can retract and be reinserted after shrinking. - No restrictions on the launch base or access shaft in small spaces. - A wide variety of excavation and soil removal methods can be selected. - All-direction excavation is possible. - Long-distance excavation of up to 300 meters is achievable. *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Envi-liner method

The construction extension has reached a total of 4,930 km, boasting a high track record with the same type of advancement method.

This technology is a non-excavation small-diameter pipe jacking method that can construct various types of pipes ranging from φ150 to φ1000. Using a jacking machine installed in the launch shaft, the buried pipes are sequentially laid towards the receiving shaft, eliminating the need to excavate the road surface. Additionally, the jacking device is designed to be compact, allowing for launching from small shafts. Since it uses an excavation and soil removal method, there is no need for large surface facilities like those required for slurry methods, and the equipment associated with the work, such as cranes and generators, can be kept small, contributing to overall cost reduction. 【Features】 ■ Capable of constructing various types of pipes from φ150 to φ1000 ■ Non-excavation construction ■ Suitable for difficult ground conditions ■ Small space and low cost ■ No need to excavate the road surface *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ace Mall Method

Clearing a wide range of soil conditions! Introducing pipe jacking technology that takes the Earth's environment into consideration.

This technology employs a mud pressure-type excavation and discharge mechanism along with a unique position measurement system, achieving high-precision long-distance and curved advancement across a wide range of soil conditions from soft ground to bedrock. Additives are injected into the excavated soil, turning it into a slurry that is pumped up to the standing piles. By controlling the amount of mud taken in, some is left in the ground to prevent the collapse of the face and pit walls, while the lubricating effect of the mud (slurry) reduces the driving force. 【Features】 ■ Clears a wide range of soil conditions ■ Achieves long-distance and curved advancement *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ramsas method

The soil removal method is vacuum suction! A diverse lineup of cutter heads tailored to the soil type.

The technology creates a method that forms a mud film on all excavation surfaces and constructs a highly stable tail void through approximately 25mm of overcut and the action of high-concentration mud water. The gravel is crushed within the chamber using a cone crusher and cutters driven by the outer circumference. Bit replacement can be done from inside the machine, allowing for long-distance advancement. 【Features】 ■ A diverse lineup of cutter heads tailored to soil types (φ700 to 3,000) ■ The excavation method uses vacuum suction ■ Crushing capacity is 1-axis compressive strength of 350MN/m² (RMS-GX type) ■ Bit replacement can be done from inside the machine, enabling long-distance advancement ■ The action of approximately 25mm of overcut and high-concentration mud water forms a mud film on all excavation surfaces and constructs a highly stable tail void *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ramsas-S Method

The advanced curve construction is possible with the internal measurement system! The launch and arrival shafts are very small.

The technology is a construction method that allows for long-distance propulsion using a vacuum excavation method. For diameters of φ250 to 500, it can be divided into four parts (maximum dimension 925mm), and for φ600, it can be divided into three parts (maximum 1,325mm). Each nominal diameter is equipped with a compact jack for improved workability. Additionally, it allows for the construction of shafts in favorable locations, taking into account the surrounding environment. 【Features】 ■ A diverse lineup of cutter heads tailored to soil types (φ250 to 600) ■ Very small launch and arrival shafts ■ Capable of long-distance launches ■ Advanced curved construction possible with an in-pipe measurement system ■ Advanced curved construction possible with an electromagnetic wave measurement system *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ito Group Co., Ltd. Business Introduction

Leave the specialized civil engineering work such as slope stabilization and landslide countermeasures to us.

Our company is dedicated to cultivating technology and human resources solely in specialized civil engineering works such as slope stabilization and landslide countermeasures, as well as slope protection construction. We handle techniques like the slope protection method "Wood Slope Method" and the environmentally friendly road widening method "Cantilever Method," so please feel free to consult us if you have any requests. 【Business Items】 ■ Slope stabilization and landslide countermeasures ■ Slope protection construction ■ Rockfall countermeasures ■ Road widening construction ■ Environmental conservation promotion construction, etc. *For more details, please download the PDF or feel free to contact us.

  • Road construction
  • Other civil engineering works
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Plug Method for Small Tube Stopper

For the maintenance of the heater and condenser's small tubes! It is possible to investigate leaks in fine holes.

At Yamaguchi Machinery Co., Ltd., we offer the "Small Pipe Stopper Plug Method," which is recommended for companies that regularly conduct maintenance. This method does not affect the area around small holes, preventing cracks in small pipes and tube plates. By maintaining small holes while leaks are still minor, it helps avoid sudden troubles and leads to cost savings. 【Features】 ■ The durability of small holes after construction is permanent ■ Construction time is significantly shorter ■ There is no impact on the area around small holes *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Dry Ice Blasting Method

A cleaning technology that does not damage the base material and leaves no cleaning media or wastewater behind!

We offer "Dry Ice Blasting," which does not damage the base material and leaves no cleaning media or wastewater behind. Dry ice particles (dry ice pellets) with a diameter of 3mm are propelled by compressed air to remove contaminants. This method utilizes the physical properties of dry ice, providing high cleaning power. It is a very common technique in EU countries. 【Features】 ■ No water or detergents used ■ No damage ■ No residual media left behind ■ Excellent cleaning power ■ No secondary processing costs *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP lining waterproofing and corrosion prevention method "Airtight"

Introducing composite and multifunctional construction methods! For deterioration prevention, longevity, leakage prevention, waterproofing, and corrosion protection.

"Air Tight" is a composite design waterproofing and anti-corrosion method that combines adhesion, waterproofing, and corrosion resistance in FRP lining. It is a multifunctional type that demonstrates the required performance under various environmental conditions. It is not affected by the alkaline properties of concrete. Additionally, the coating of concrete requires crack-following ability, and this method enhances crack-following ability through high strength and flexibility. 【Features】 ■ Suppresses the occurrence of pinholes ■ Long-term durability ■ A surface degradation type that can be assessed visually for peace of mind ■ Ease of maintenance management ■ Capable of reducing life cycle costs *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP lining waterproofing method [Sewerage facilities]

The design emphasizes corrosion resistance, crack-following ability, and measures to suppress pinholes!

The concrete corrosion phenomenon in sewer facilities is known to occur due to the generation of sulfides by sulfate-reducing bacteria in sewage sludge. Hydrogen sulfide gas, which is released from the liquid phase to the gas phase, dissolves in condensate water and progresses due to sulfuric acid produced by sulfur-oxidizing bacteria. Even when coated with anti-corrosion materials, corrosion progresses from areas where pinholes or cracks have developed in the anti-corrosion material, leading to breakage or cracks that cannot follow the cracks. The "Airtight Construction Method" is designed with a focus on corrosion resistance, crack-following capability, and measures to suppress pinholes. In sewer facilities, we propose measures for reducing life cycle costs and extending service life based on the functions and performance that meet the required specifications and long-term durability records. 【Features】 ■ Maintains performance over a long period ■ Deterioration can be visually assessed, making repairs easy ■ Enhanced crack-following capability due to high strength and flexibility ■ High corrosion and chemical resistance, capable of handling special wastewater inflow *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP lining waterproofing method 【Water Treatment Facility】

Maintains performance over a long period! The deterioration can be visually assessed, making repairs easy.

The concrete structures of water treatment facilities are subject to deterioration and corrosion due to erosion from wastewater and the intrusion of generated gases. Even when coated with anti-corrosion materials, deterioration progresses from areas where pinholes or cracks have formed that cannot follow the anti-corrosion material. The "Airtight Method" is designed with a focus on corrosion resistance, crack-following capability, and measures to suppress pinholes. In water treatment facilities, we propose corrosion prevention and long-life measures that can respond to the required performance and functionality, and reduce lifecycle costs based on long-term durability records. 【Features】 ■ Excellent acid and alkali resistance ■ Excellent chemical resistance ■ Prevents the occurrence of pinholes due to the characteristics of the countermeasure process and materials ■ Prevents contamination of groundwater and soil due to wastewater leakage ■ Good curing properties with no concerns about poor curing *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP waterproofing IRM method for self-driving parking lots

Impact resistance and wear resistance dramatically improved with FRP + resin mortar!

The "IRM Method" is a waterproofing technique for self-supporting parking lots that combines an FRP waterproof layer with a resin mortar protective layer, offering a lightweight and highly durable solution. By using resin mortar for the protective layer, it achieves excellent water resistance and abrasion resistance with a thickness of just a few millimeters, and it is designed to withstand tire chains and de-icing agents typical in cold regions. There are numerous construction achievements in Hokkaido. This technology is registered with NETIS (Registration Number: KK-230013-A).

  • Coating film waterproofing material/permeable waterproofing material
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Deck construction material "Fixplus leveling system"

Ideal for various exterior decks! Achieving speed in deck construction and high weather resistance.

The "Fixplus Leveling System" is a decking construction component made of weather-resistant resin plastic. Height adjustments when installing wood decks or ceramic tiles can be done quickly and accurately by simply rotating the product itself. It is suitable for various exterior decks such as rooftops, balconies, terraces, and pools. In addition, we offer "BSW60" for wood decks and "BS60" for thick ceramic tiles. 【Features】 ■ Infinite height adjustment ■ High weather resistance ■ Lightweight and easy to install ■ Adjust height by rotating the product itself *For more details, please refer to the PDF document or feel free to contact us.

  • tile
  • Tile/Indoor
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Special acrylic resin transparent coating waterproof method "JK Coat"

A transparent coating that provides waterproofing and protection without compromising appearance! It protects buildings from deterioration!

"JK Coat" is a transparent coating that waterproofs and protects exterior wall tiles, glass blocks, and exposed concrete surfaces without compromising their appearance. It protects buildings from various deterioration phenomena such as cracking, peeling, and the spread of neutralization in joints caused by long-term exposure to ultraviolet rays, rainwater, dust, acidic gases, wind, and vibrations. 【Features】 ■ Waterproofs and protects without compromising appearance ■ Protects buildings from various deterioration phenomena * Available in Tokyo, Saitama, Chiba, and Kanagawa Prefectures * For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Transparent resin tile fixing and detachment prevention method "JK Cerider Method"

Up to 10 years warranty! A tile falling prevention method that reinforces tiled exterior walls on a surface level!

The "JK Serider Method" is a tile fall prevention technique that reinforces tiled exterior walls using a special acrylic resin called "JK Serider," which becomes transparent after curing and is mixed with short fibers, along with special anchor pins. This method not only excels in seismic resistance but also offers excellent waterproofing, and its transparent finish ensures that the texture of the exterior wall is not compromised, making it a groundbreaking technique. Additionally, it protects the exterior wall from rainwater with long-lasting waterproofing. It also blocks carbon dioxide in the atmosphere, contributing to the longevity of the building. 【Features】 ■ Outstanding seismic resistance ■ Warranty of up to 10 years ■ High performance of special anchor pins ■ Reinforcement of joint materials ■ Excellent waterproofing and blocking properties *Available in Tokyo, Saitama, Chiba, and Kanagawa Prefectures *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete repair and reinforcement method "CFRP Laminate Method"

Streamlining of work is achievable! Repair and reinforcement methods for reinforced concrete structures using CFRP.

The "CFRP Laminate Method" is a reinforcement technique that involves arranging carbon fibers in one direction, impregnating them with epoxy resin, and shaping and curing them into a plate-like form. This CFRP is then adhered to the concrete surface using a paste-like epoxy adhesive (Sika Dur 30), making the process simple. Since the surface preparation is only required for the area to be adhered, it also takes into account the preservation of the working environment and the reduction of waste. 【Features】 - Easy to work with, requiring no large machinery or equipment - Can be performed in areas where pipes intersect beneath the slab or in confined spaces - Reduces safety risks for workers and minimizes protective measures around the work area - There is almost no change in the shape or weight of the reinforced members - Provides reinforcement equivalent to 4 to 8 layers of carbon fiber sheets, allowing for labor-saving in the work process *Available in Tokyo, Saitama, Chiba, and Kanagawa Prefectures *For more details, please refer to the PDF materials or feel free to contact us.

  • Reinforcement and repair materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Crack Repair Method "JK Rubbing Method"

Repair marks are inconspicuous! Environmentally friendly acrylic resin-based non-cut crack repair method.

The "JK Loving Method" uses a special acrylic resin mixed with short fibers, making it a new crack repair method that excels in durability, aesthetics, and crack-following performance. Compared to U-cut methods, the repair marks are less noticeable, and there is no noise or dust generated during work. It offers excellent workability and can shorten construction time. Additionally, it becomes transparent after curing and can be used on tile surfaces. 【Features】 ■ Excellent workability, allowing for shortened construction time ■ Prevents the intrusion of rainwater and other elements from the repair area ■ Excellent crack-following performance (approximately 5mm in crack-following performance tests) ■ Environmentally friendly water-based materials ■ Transparent after curing and can be used on tile surfaces *Available in Tokyo, Saitama, Chiba, and Kanagawa Prefectures *For more details, please refer to the PDF materials or feel free to contact us.

  • Reinforcement and repair materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Composite Anti-Corrosion Method "Slagreed SR Method"

Developed as a repair material for steel structures damaged by various factors! Introduction of a composite corrosion protection method.

The "Slagreed SR Method" is a composite (self-repairing) corrosion protection method that utilizes blast furnace slag and employs the environmentally friendly water-based paint "Slagreed SR," which has a very high rust prevention effect. The rust prevention capability on poor soil surfaces and low-cleaning surfaces is achieved by combining alkaline corrosion protection with special rust inhibitors, allowing for self-repair functionality even when the paint film is damaged, thereby suppressing rust. Additionally, it does not require advanced substrate treatment, and due to the high alkalinity of the paint film, it passivates the steel surface and suppresses corrosion. 【Features】 ■ High alkalinity of the paint film ■ Suppression of corrosion ■ No need for advanced substrate treatment ■ Reconstruction of passive film (Fe3O4) ■ Suppression of rust *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

From full-thread to wire - Achieving CO2 emission reduction and lightweight components simultaneously.

By switching from full-threaded screws to Gripple wire, approximately 1.6 kg of CO2 emissions can be reduced per meter. This also reduces processing effort on-site and allows for waste material reduction.

Traditionally, the "Type B seismic vibration restraint," which often uses full-threaded bolts, can reduce CO2 emissions by about 90% by using our BCJ-certified wire method. Switching from full-threaded bolts to Gripple wire leads to a reduction of approximately 1.6 kg of CO2 emissions per meter. Furthermore, it eliminates the need for on-site processing and reduces waste materials. • Gripple has obtained ISO 14001 (Environmental Management System) certification.

  • Air conditioning equipment
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BCJ evaluation acquisition Vertical self-weight support wire method_ All threads to wire!

Replace the vertical self-weight support with a fully threaded one, allowing for construction with wire. With overwhelming workability and weight reduction, the efficiency of the entire process is improved, enhancing productivity.

Traditionally, it has been common to use fully threaded rods for vertical load-bearing supports; however, in this method, by selecting an appropriate wire diameter according to the weight of the supported material, you can use wire as a vertical load-bearing support instead of fully threaded rods. This method has obtained a general evaluation from the Building Center of Japan (hereinafter referred to as "BCJ") as the "Gripple Wire System - Vertical Load Support Method" (BCJ Evaluation - SS0062-1). Additionally, if seismic support is required, conventional seismic support construction must be carried out in accordance with the seismic design and construction guidelines for building equipment.

  • Electrical Equipment Testing
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

General civil engineering and paving work

A professional group specializing not only in general civil engineering and paving work but also in specialized construction.

Our company specializes not only in general civil engineering and paving work but also in specialized construction (such as slope treatment work). In June 2000, we simultaneously acquired ISO 9001 and ISO 14001. All public works are carried out using environmentally friendly methods as "ECO construction." For water collection boring, well drilling, and hole cleaning, please leave it to us. 【Features】 ■ High-quality construction by our own developed machinery and directly managed teams ■ Cost reduction is possible because the construction is carried out by our directly managed teams *For more details, please download the PDF or contact us.

  • Civil Engineering Company
  • Construction company
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

World's highest peak Husqvarna floor grinding machine

The world's one and only Dual Drive Technology! It features a twin motor structure.

- The PG830RC and PG690RC can be operated remotely via a remote control. - The twin motor system is a unique technology from Husqvarna that allows for independent reverse rotation of the planetary plate and satellite plate. - There is a wide range of models available, from single-disc grinders to medium-sized planetary grinders and large planetary grinders. - There is a rich variety of dust collectors compatible with each grinder. - There is a certification course for polished concrete (floor mirror polishing), and technical guidance training is available after purchase (limited to the purchase of large planetary grinders). - There are headquarters and branches in Saitama Prefecture and Osaka Prefecture that can perform maintenance inspections. ★ Maintenance during asbestos removal cannot be handled by the manufacturer, but can be addressed by our designated contractors (Kanto region). Please contact us for more details. ★ For inquiries regarding our products, please use the contact form on our website. This site's contact form cannot be used. Website: https://www.ebisu-tool.org

  • Concrete Machinery
  • Renovation and repair methods
  • Artificial stone coating/Terrazzo on-site coating
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Husqvarna Large Floor Grinder PG690RC/PG690

The floor grinding machine with a twin motor structure offers high efficiency productivity that only Husqvarna owners can achieve.

1. Dual Drive Technology: The twin motor structure allows for individual changes to the planetary disk and satellite disk. This technology enables diverse polishing options and significantly improves production efficiency. 2. Three-Head Disk: Increases the polishing pressure applied to each disk (satellite disk), ensuring that the polishing tool consistently acts on the polishing surface. 3. Slide Change System: Utilizes centrifugal force to secure diamond tools. Attachment and detachment can be done with just a hammer. 4. Remote Control: A model that allows for remote operation via a remote control. It is self-propelled, reducing the physical burden on the operator and improving overall production efficiency. 5. Others: The design is based on ergonomics, promoting long-term use with a total structure and high efficiency. ★ For inquiries regarding our products, please contact us through our company website. This site's inquiry function cannot be used. Website: https://www.ebisu-tool.org

  • Artificial stone coating/Terrazzo on-site coating
  • Renovation and repair methods
  • Concrete construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration