Construction method Product List and Ranking from 1597 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 日本海洋サービス 大阪支店 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 Temporary bridge temporary pier cable-stayed construction method "LIBRA Method" 横山基礎工事

Construction method Product List

1711~1725 item / All 4237 items

Displayed results

BRICS construction method

A truly zero construction method that does not require external scaffolding by stacking units from the inside.

The "BRICKS Method" involves hand-making bricks while laying rebar, and pouring concrete inside, resulting in the simultaneous completion of the exterior and interior wall finishes, just like in reinforced concrete buildings. Surrounded by walls made of reinforced concrete natural stone bricks, it features a very sturdy structure. Additionally, units that have natural stone pre-embedded allow for the construction of high-end buildings (as the interior and exterior finishes are completed during the brick laying process). 【Features】 - A wide variety of finishes that enhance the building's design - Natural stone bricks that are resistant to dirt and remain clean for a long time - Good workability and high precision - Short construction period with simultaneous completion of finishes - Seismic strength equal to or greater than that of RC structures, etc. *For more details, please download the PDF or feel free to contact us.

  • Housing structure technology/long-term superior housing technology

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Underground Injection Construction "Set Form Method"

Filling gaps with rigid polyurethane foam! It excels in stability, water-stopping effect, and workability.

The "Set Form Method" is a technique used in the repair work of existing tunnels, where voids behind the lining concrete are filled with rigid polyurethane foam. Rigid polyurethane foam hardens in about one minute after injection and reaches its final strength in 30 minutes, providing excellent early stability. Additionally, if using rigid polyurethane foam that expands 40 times, the amount of materials transported and the injection volume are only one-fortieth of the actual void volume. 【Features】 - Minimal penetration and escape into the surrounding ground, reducing the injection volume - Construction possible within a budget based on actual void volume - The weight on the lining concrete is lightweight at 30 kg/m3 - Excellent water-stopping effect as it expands and hardens even underwater - Can be constructed without time constraints, among others *For more details, please feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Hollow Slab Method"

When you want a wide space without columns and high sound insulation performance!

We are proposing the hollow slab construction method as an agent for Kurimoto Iron Works Co., Ltd. This method allows for a free plan that meets the client's requirements, as there are no beams to restrict the layout. Additionally, due to the flat slab, the installation of equipment and piping within the ceiling becomes easier, facilitating carpentry, rebar work, and interior construction. 【Features】 ■ Enables wide spaces without columns ■ Flat ceiling surface ■ Average thickness of the floor slab increases ■ Improved sound insulation performance *For more details, please download the PDF or feel free to contact us.

  • Concrete construction
  • Wood panel and frame wall construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Soil improvement method "HSS Method"

Environmental conservation and recycling solutions that contribute to soil improvement and contaminated soil purification!

The "HSS Method" is a soil improvement technique that uses the soil conditioner "Doctor" to improve construction-generated soil and sediment on-site into high-quality safe soil, actively contributing to recycling and cost reduction. We propose soil improvement systems tailored to the type of soil, its intended use, location, and scale. Please feel free to contact us for more information. 【Features】 ■ High mixing ratio to accommodate a wide range of soil types ■ Reliable mixing ratio with a paddle mixer ■ Suitable for high-viscosity soil to sandy soil ■ Quality stability through a vibrating screen ■ High-precision solidifying agent supply system *For more details, please download the PDF or feel free to contact us.

  • Company:HSS
  • Price:Other
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Coating peeling method for steel structures: "Pantre Method"

Measures for the work environment and surrounding environment during coating removal! Achieving a reduction in industrial waste disposal costs.

"Pantore" is an environmentally friendly water-based paint stripper that reliably removes harmful substances such as lead, chromium, and PCBs contained in old coatings on steel structures (such as steel road bridges). It does not contain chlorine-based solvents, has minimal impact on human health, can be peeled off in a wet sheet form without scattering the old coating, and is easy to collect. By improving work efficiency compared to conventional paint removal methods, it enables significant reductions in processing costs and industrial waste. 【Features】 ■ Registered with NETIS ■ Low environmental impact and minimal effects on human health. ■ Low odor and low irritation ■ No flash point (non-hazardous material) ■ Easily biodegradable and low toxicity ■ Significant reduction of industrial waste *For more details, please refer to the PDF document or feel free to contact us.

  • Bridge Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

High wall construction method for an 8-story reinforced concrete building with wall-type structure.

Next-generation wall construction method

Features of the High Wall Construction Method <8 Highs> 1. Enables construction of high-rise buildings up to 8 stories 2. High constructability 3. High seismic resistance 4. High space efficiency 5. High yield 6. High sound insulation 7. High fire resistance 8. High livability What is the High Wall Construction Method? Wall-type reinforced concrete construction has become possible for designs up to 8 stories due to legal revisions and the establishment of design guidelines. However, widespread adoption has not progressed due to the need for complex analysis. Recently, through extensive research at Sakura Structural Engineering, we obtained the first approved certificate for WRC 8-story buildings in Japan. The "High Wall Construction Method" is a next-generation wall-type reinforced concrete construction that combines high seismic resistance with low cost.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Fine Frame 80 Method "Zero Cost High Seismic High Durability RC Construction"

This is a zero-cost, high seismic resistance, and high durability construction method that achieves a standard rebar quantity of 80 kg/m² for RC structural bodies.

This is a unique zero-cost, high seismic resistance, and high durability construction method by Sakura Structure, which achieves a standard rebar quantity of 80 kg/m² for RC structural frames by meeting certain conditions such as "building shape" and "number of floors" in high-demand mid- to high-rise RC construction.

  • Special Construction Method
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Space Wall Method "Large Space Wall Structure"

Reduce RC walls to the limit to enhance the flexibility of the layout and make large spaces possible!

The Space Wall method is a wall-type reinforced concrete construction that improves the flexibility of room layouts, which is a disadvantage of conventional wall-type concrete, by minimizing the use of RC walls to allow for large open spaces, while also providing high seismic resistance, durability, and low cost.

  • Special Construction Method
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

All casing is entrusted to Ryo Construction Foundation! "All Casing Method"

There is little impact on the surrounding ground, and it is possible to excavate bedrock and boulders as well as cut reinforced concrete! We also have many application methods available.

The "All Casing Method" is a technique that involves excavating the interior while protecting the drilling hole with a casing tube. At Hishiken Kiso Co., Ltd., we offer various application methods, including not only obstacle removal but also low-noise and low-vibration excavation using hydraulic hammer grabs, and reinforcement of the ground at the tip using concrete rings. 【Advantages of the "All Casing Method"】 ■ Minimal impact on surrounding ground ■ Capable of excavating bedrock, boulders, cobblestones, and cutting reinforced concrete ■ Beneficial for environmental conservation measures, such as wastewater treatment and consideration for groundwater ■ Low moisture content in excavated soil, making residual soil disposal relatively easy ■ The side friction force is comparable to driven piles due to the absence of stabilizing fluids or mud water *For more details, please refer to the PDF materials or feel free to contact us.

  • TOP.png
  • s1.png
  • s2.png
  • s3.png
  • IPROS99319526122999904887.png
  • IPROS65357177214851006840.png
  • Ground foundation construction method
  • Civil Engineering Method
  • Foundation construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

All Casing Application Method: Enlarged Base Pile Method

Shortening construction time and reducing costs! This is a method that allows for the removal of obstacles and the creation of piles in one process.

The "Expanded Base Pile Method" is a construction technique that allows for the removal of existing underground structures and pile foundations of previous buildings while simultaneously installing new piles for a new building. During the pile construction of the new building, the removal of existing underground structures and piles can also be carried out at the same time. Additionally, when used in conjunction with the Earth Drill Expanded Base Pile Method, it meets a wide range of needs for the piles of new buildings. 【Features】 ■ Shortened construction period ■ Cost reduction ■ Avoidance of issues related to the remaining underground structures ■ Removal of obstacles and pile construction can be done in one process ■ Pile installation can be performed without being affected by the backfill condition after obstacle removal *For more details, please refer to the PDF materials or feel free to contact us.

  • image_03.png
  • Ground foundation construction method
  • Civil Engineering Method
  • Foundation construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Earth Drill Method (Bell Earth Method)

Large-diameter and deep drilling is possible! The four-wing excavation pit allows for the construction of an excellent bell-bottom shape.

The "Earth Drill Method (Bell Earth Method)" protects the hole walls using a standpipe and stabilizing fluid, while excavation is performed by rotating a drilling bucket to cut the ground and discharge the soil contained in the bucket to the surface. For shaft excavation, a construction method suitable for the ground (full casing, reverse, earth drill) can be selected. The highly sealed bucket ensures the reliable removal of slime from the bottom of the hole, and the powerful rotational torque allows for large-diameter and deep excavation. 【Features】 ■ Shaft excavation allows for the selection of a construction method suitable for the ground ■ The four-wing excavation pit enables the construction of an excellent bell shape ■ The highly sealed bucket reliably removes slime from the bottom of the hole ■ Powerful rotational torque allows for large-diameter and deep excavation *For more details, please refer to the PDF document or feel free to contact us.

  • image_02.png
  • Ground foundation construction method
  • Civil Engineering Method
  • Foundation construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Vibratory Tremie Method for Cast-in-Place Concrete Piles

Apply vibration during driving to promote filling. Suppress insufficient filling at the pile head and enlarged base. Patent obtained.

The "Vibrator Tremie Method" is a construction technique that prevents issues such as poor pile head quality due to insufficient concrete filling, and enables the creation of high-quality cast-in-place concrete. By equipping the tip of the tremie pipe with a vibration device, it is possible to effectively ensure fluidity by directly applying vibrations to the concrete being extruded from the pipe. Additionally, since the vibration device is inserted into the concrete from the start of the pouring process, it also prevents the inflow of impurities and water from within the hole (stabilizing fluid). 【Features】 ■ Simultaneous compaction of concrete during pouring ■ Reduced interference with half-round or sharp hooks of rebar due to a small diameter of 250mm inner diameter and 420mm outer diameter ■ Fewer excess wires to prevent issues such as disconnection or leakage ■ Ability to adjust the amount of vibration while checking pressure with a digital gauge *For more details, please refer to the materials. Feel free to contact us with any inquiries.

  • s1.png
  • s2.png
  • s3.png
  • Ground foundation construction method
  • Civil Engineering Method
  • Foundation construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

TBH construction method

Large-diameter drilling is possible! It demonstrates its capabilities under narrow conditions with low working headroom, such as beneath existing structures!

The "TBH Method" is a construction method applied in cast-in-place pile work, utilizing a specialized drilling machine equipped with a reverse circulation mechanism and a top drive system. Compared to the BH method, which employs a positive circulation mechanism and spindle system, this method facilitates large-diameter drilling as a permanent pile. In addition to the conventional reverse method, this technique can also be executed under narrow and low-space construction conditions. Due to the reverse circulation drilling method, issues related to the settling and sedimentation of slime generated during drilling have been resolved, allowing for reliable management and construction. 【Features】 - The construction machinery is compact, enabling work in confined spaces. - It can be executed even in low working heights, such as under elevated structures or indoors. - It is lightweight and small, making transportation easy even on narrow access roads. - Heavy machinery is not required for the assembly and disassembly of the machine. - Noise and vibration levels during construction are extremely low. *For more details, please refer to the PDF materials or feel free to contact us.

  • image_02.png
  • image_03.png
  • Ground foundation construction method
  • Civil Engineering Method
  • Foundation construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

H-type PC pile

Wall materials for retaining structures using precast PC components that do not require temporary earth retention.

The "H-type PC pile" is a prestressed concrete member with an H-shaped cross-section manufactured in a factory, and it is a construction method for building retaining walls by continuous driving using a three-point pile driver. During construction, it is used as a temporary retaining wall, and during the permanent phase, it is used as the completed structure. The cross-sectional dimensions are available in three types: width 1070(mm) × height 540, 640, 740(mm), and the design standard strength of the concrete is 70(N/mm²). 【Features】 ■ No need for temporary retaining walls ■ Self-supporting wall heights of up to approximately 8.5(m) are possible ■ Rigid connection with base and top slabs is possible ■ Leakage suppression effect for groundwater and other water ■ Drainage effect for rainwater and other sources ■ Low noise and low vibration construction method ■ Shortened construction period on site *For more details, please refer to the PDF materials or feel free to contact us.

  • スライド9.JPG
  • スライド11.JPG
  • スライド12.JPG
  • スライド13.JPG
  • スライド14.JPG
  • スライド15.JPG
  • 施工方法.jpg
  • DSCF0652.JPG
  • Retaining wall
  • Civil Engineering Method
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Earth Drill Expansion Pile (newACE) Method

new ACE method

This is a method of pile foundation construction known as the expansion resistance pile method, which improves the vertical load-bearing capacity of piles by excavating the expansion resistance section in a frustum shape using a newACE bucket. An earth drill machine is used for the excavation. 【Features】 ● The excavation method for the shaft section can be selected based on the ground conditions (earth drill, all-casing, reverse). ● Expansion of up to 4.8 meters is possible, with a maximum effective expansion ratio of 4.62. ● Concrete with a maximum design strength of Fc 80 N/mm² can be used. ● Two scrapers ensure accurate measurement of the hole wall. ● The inclination angle of the expansion resistance section is consistently maintained at 12°. *For more details, please refer to the PDF document or feel free to contact us.

  • アースドリル2.jpg
  • アースドリル3.jpg
  • Foundation construction machinery

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration