Construction method Product List and Ranking from 1588 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Jan 28, 2026~Feb 24, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jan 28, 2026~Feb 24, 2026
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. エルニード協会 Kagawa//Other construction industries
  3. 丸八土建 Mie//General contractors and subcontractors
  4. 4 HOKOKU ENGINEERING CO.,LTD. Osaka//Other construction industries
  5. 5 シーカ・ジャパン Tokyo//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Jan 28, 2026~Feb 24, 2026
This ranking is based on the number of page views on our site.

  1. Soil Coating Method "PoliSoil Greening" <NETIS Registered> 丸八土建
  2. 地下水・軟弱地盤対応の基礎工法『スーパーラップルエルニード工法』 エルニード協会
  3. Foundation Omega Method HOKOKU ENGINEERING CO.,LTD.
  4. 4 Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  5. 5 Hybrid Concrete Reinforcement Method "Solid Remain Alpha"

Construction method Product List

3331~3360 item / All 4275 items

Displayed results

Multi-type screw-fixed anchor 'Bolt Screw BS/SBS'

Speedy construction, high strength, smart features! It demonstrates excellent screw-in capability and holding power.

The "Bolt Screw BS/SBS" is a multi-type screw-fixed anchor that can be directly installed on ALC, plywood, and wood without pre-drilling. It can also be used on extruded cement boards/asphalt (requires pre-drilling). With its thick shaft diameter, it demonstrates strong tensile holding power, allowing for quick installation of bolts in various building materials. 【Features】 - Quickly install bolts in various building materials - Direct installation on ALC, plywood, and wood without pre-drilling - Usable on extruded cement boards/asphalt (requires pre-drilling) - Strong tensile holding power with a thick shaft diameter - Special screw design that exhibits excellent screw-in capability and holding power *For more details, please refer to the PDF document or feel free to contact us.

  • Subsidiary materials
  • Work tools
  • Joints between components
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

ALC screw-fixed anchor "Turbo Anchor K"

Speedy construction, reliable strength, and smart features with ALC screw anchors! They grip firmly into ALC and demonstrate great strength!

The "Turbo Anchor K" is a screw-fixed anchor for ALC that is resistant to cracking at the ALC ends. It bites firmly into the ALC, demonstrating great strength, and allows for drilling and fixing with just one impact driver. Additionally, the use of the high-speed bit "Turbo Booster" significantly increases construction speed. 【Features】 ■ Screw-fixed anchor for ALC that is resistant to cracking at the ALC ends ■ Bites firmly into ALC, demonstrating great strength ■ Allows for drilling and fixing with just one impact driver ■ Significantly increases construction speed with the high-speed bit "Turbo Booster" ■ Usable for various fixings such as lighting equipment, air conditioning systems, piping, and handrails *For more details, please download the PDF or contact us.

  • Subsidiary materials
  • Work tools
  • Joints between components
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Screw-fixed anchor "Tap Star" [Other anchors available separately]

No hammering required, speedy and reliable installation with an impact driver. Removable "male thread" screw-fixed anchor!

The "Tap Star" is a concrete screw anchor with a "male thread shape" that allows for easy and reliable installation using an impact driver without the need for hammering, with just a few seconds of screwing. It is less likely to crack corner and finishing materials, and after installation, it allows for height adjustments and removal of the anchor, avoiding fire hazards when cutting the anchor if it is no longer needed. It is suitable for situations where installation of expansion anchors (hammering or tightening) is difficult. This anchor is useful in various scenarios, such as renovation work, electrical equipment installation, and other equipment setups. **Features of Tap Star:** - Fast and reliable installation with an impact driver - Less likely to crack at edges and finishing materials - Height adjustments possible after installation (unevenness adjustment function) - Easy installation in corners and ceilings - Removable anchor Additionally, we also offer the "Beans Anchor," a metal expansion type post-installed anchor that requires no hammering and allows for reliable installation with an impact driver (tightening type). It features a completely new expansion structure (patented) that enables silent installation without impact noise or shock, while also increasing installation speed. *For more details, please refer to the related links or feel free to contact us.*

  • Subsidiary materials
  • Work tools
  • Joints between components
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Demolition method "Mini Blasting Method"

Efforts in Demolition Technology Utilizing High Energy from Explosives - Design and Construction Based on "Safety, Reliability, and Speed" -

Sagamiko Industries Co., Ltd. provides a highly efficient and environmentally friendly demolition service by combining the "Mini Blasting Method," which uses small-diameter and small-quantity explosives, with mechanical demolition. This method enables safe, low-noise, low-vibration operations with minimal dust generation and allows for quick execution of projects. **Effects of the Mini Blasting Method** - It allows for the demolition of structures in areas where heavy machinery cannot be brought in, such as underground. - It reduces the amount of heavy machinery operation, thereby decreasing CO₂ emissions. - It minimizes sustained noise and vibration, limiting the occurrence of blasting noise and vibrations to specific times. - It reduces the physical and environmental burden on workers, enhancing safety. - It shortens the construction period. - It decreases the amount of dust generated. - It allows for efficient demolition work, leading to cost reductions. *For more details, please download the PDF or contact us.*

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Non-explosive demolition method

Applicable to sites where it is difficult to obtain permission for the consumption of explosives.

Introducing the "Non-explosive Fragmentation Agent Method." Non-explosive fragmentation agents, unlike explosives, break rock and concrete using the expansion pressure from a thermite reaction. They are not subject to the Explosives Control Law, allowing for easier handling in terms of storage and usage compared to explosives. Additionally, the "Non-explosive Fragmentation Agent Method" is applied in locations where obtaining a consumption permit for explosives is difficult, such as near urban areas or security-sensitive sites, or in situations where there is no time to obtain such a permit. 【Features】 ■ Breaks rock and concrete using expansion pressure from a thermite reaction ■ Easier handling for storage and usage compared to explosives ■ Applicable in sites where obtaining a consumption permit for explosives is difficult or where there is no time to obtain such a permit *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Non-explosive demolition method for pile head treatment

Aiming to eliminate excessive labor accompanied by noise and vibration, non-explosive demolition agents are applied to pile head treatment.

The non-explosive demolition agent method for pile head treatment involves loading a non-explosive demolition agent into holes drilled from the outer surface of the pile towards its center, and igniting it to instantaneously crush the concrete, forming a horizontal fracture surface, thereby separating the main body of the pile from the excess portion. The excess portion can be removed as consolidated fragments using a crane or similar equipment. The chipping work involved in pile head treatment is an extremely demanding task for workers, as they are subjected to strong noise, vibration, and dust at close range. In the construction sector, where there is a shortage of workers, the non-explosive demolition agent method for pile head treatment is a technology that contributes to the preservation of the surrounding environment as well as the improvement of the working conditions. The non-explosive demolition agent undergoes a redox reaction known as the thermite reaction, which crushes the material through instantaneous steam expansion pressure. The reaction rate is about 1/25 that of explosives, and since it does not generate shock waves, it can separate the excess portion without damaging the main body of the pile. Tests on the concrete compressive strength of the main body of the pile and tensile tests on the rebar have confirmed that there is no reduction in strength, and that both the concrete and rebar are intact.

  • Pile and foundation work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Blasting method

By adjusting the type of explosives used, the amount of charge, and the blasting pattern, it is possible to fragment according to the scale suited to the site conditions.

■The technology that utilizes the explosive energy of explosives has been widely used in mining and civil engineering for a long time, and can be considered an economical and efficient method. By effectively utilizing the powerful explosive energy of explosives, significant effects can be achieved. ■Since it is possible to eliminate the use of breakers, the noise and vibration burden on the surrounding area can be reduced. ■When applying blasting methods as an auxiliary to breakers and crushers, it is possible to select the type of explosives used and adjust the blasting pattern, allowing for a reduction in the workload of breakers and crushers by any desired ratio. ■Compared to traditional demolition work using heavy machinery, it becomes possible to reduce the operating time of heavy machinery, thereby decreasing fuel consumption. This makes it possible to reduce CO2 emissions generated during construction.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Information on the "Core Drilling Method"

Flexible drilling operations such as vertical, horizontal, and diagonal, as well as high-precision perforation depending on the machine used.

The "core drilling method" is a highly precise drilling technique using engine machines. The drill used has a hollow metal tube with a blade made by sintering selected diamond powder along with metal powder at its tip. This drill is rotated at high speed to accurately create holes in reinforced concrete structures in a short amount of time. It can drill holes ranging from 1 cm for small objects to over 1 meter for larger ones, with high precision tailored to the purpose. There is no concern about dust or noise pollution. 【Features】 ■ High-precision drilling depending on the machine used ■ Flexible drilling operations in vertical, horizontal, and diagonal directions ■ Accurate drilling operations in a short time ■ Low noise and low vibration operations ■ Drilling in reinforced concrete with a high reinforcement ratio is possible without issues *For more details, please download the PDF or feel free to contact us.

  • Concrete construction
  • Reinforced concrete construction
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete Cutter Method

Complete soundproofing! Cutter method that absorbs sludge water generated during cutting with a vacuum device.

The "Concrete Cutter Method" is a technique that uses a blade (circular saw) equipped with a diamond powder and metal sintered blade attached to the circumference of a base plate, which rotates at high speed to cut reinforced concrete. It is highly effective for the removal of floor slabs on highways and for cutting reinforced concrete structures. The maximum cutting depth can reach up to 80 cm. The cooling water used in the cutting machine is suctioned simultaneously during cutting by a vacuum blower attached to the cutter body. The noise generated during cutting is eliminated by the use of ultra-low noise cutters and soundproof blades. 【Features】 ■ Absorbs sludge water generated during cutting with a vacuum device ■ Completely soundproof ■ Allows for accurate work to be done quickly ■ Enables work with no vibrations, low noise, and minimal dust ■ Reduces the likelihood of cracks occurring at the cutting site *For more details, please refer to the PDF document or feel free to contact us.

  • Concrete construction
  • Reinforced concrete construction
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Speed Earth Retention Prefabricated Method "SP Block"

Highly economical and capable of short-term construction! Retaining wall using large box-shaped concrete!

The "SP Block" is known as the speed soil retention prefabricated method, where concrete is formed into large box-shaped retaining walls that are stacked to a specified height one layer at a time. It is used for soil retention in road construction, land development, and river or waterway bank protection. Compared to conventional methods, it can be constructed in a shorter period and demonstrates effectiveness as a strong and economical retaining wall. 【Features】 ■ Used as a retaining wall for general civil engineering works ■ High stability, with increased strength through stacking ■ No need for core concrete or backfill gravel ■ Easy to construct, reducing construction time ■ Clearer guarantee of wall quality *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Speed Soil Retention Prefabricated Method "SP Block Type III"

Improved SP block developed with a 5-degree slope! Retaining wall using large box-shaped concrete.

The "SP Block III Type" is known as the speed soil retention prefabricated method, which involves creating large box-shaped retaining walls from concrete and stacking them up to a specified height one layer at a time. This block is an improved version of the conventional "SP Block," developed with a 5-degree slope for better workability. Compared to traditional methods, it can be constructed in a shorter period and demonstrates effectiveness as a strong and economical retaining wall. 【Features】 ■ Used as a retaining wall for general civil engineering work ■ Utilizes blocks developed with a 5-degree slope by improving the "SP Block" ■ High stability, with increased strength through stacking ■ No masonry required ■ Easy to install, reducing construction time *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Modified asphalt sheet waterproofing method "Custom EE Method"

Build a highly reliable waterproof layer! Modified asphalt sheet waterproofing, using a combination of adhesive and torch methods.

The "Custom EE Method" is a construction method that adheres the base layer with an adhesive layer and uses a torch burner to weld the roofing material at joint areas, creating a unified structure. Compared to asphalt waterproofing thermal methods, this method involves less high-temperature work on-site, and it primarily uses water-based primers, resulting in minimal impact from solvents on workers. Additionally, it has specifications that require little to no use of open flames and can accommodate various base materials, making it very suitable for renovation work. 【Features】 ■ Less high-temperature work on-site ■ Generates less carbon dioxide, which contributes to global warming, making it environmentally friendly ■ The use of the torch burner is limited to joint areas, resulting in minimal impact from odors, smoke, and noise on the surrounding environment during construction ■ Significantly improves construction efficiency compared to conventional methods ■ Creates a highly reliable waterproof layer by using a torch burner for melting and integration *For more details, please refer to the PDF document or feel free to contact us.

  • Coating film waterproofing material/permeable waterproofing material
  • Coating film waterproofing material/permeable waterproofing material
  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Vinyl Sheet Waterproofing Method "Mecafine"

A PVC sheet waterproofing method that exceeds performance requirements for water tightness, wind pressure resistance, and environmental sustainability!

"Mecha Fine" is an environmentally friendly PVC sheet waterproofing method. By adopting a heat-insulating waterproof specification (compliant with the Green Purchasing Law), it suppresses the rise in roof surface temperature. During renovations, it reduces waste generated from the removal of existing waterproof layers, leading to shorter construction periods and cost savings. Additionally, it is less susceptible to physical property changes caused by pollutants in industrial areas, is resistant to salt damage in coastal regions, and has minimal damage from bird pecking. 【Features】 ■ Environmentally friendly waterproof specification achieved by using F☆☆☆☆ compliant adhesives ■ Reduces waste generated during renovations through mechanical fastening methods ■ A system that can also be used when adopting solar power generation systems ■ Saves heating and cooling costs through the adoption of insulation methods and heat-insulating specifications ■ Strong against salt damage in coastal areas *For more details, please refer to the PDF materials or feel free to contact us.

  • Waterproof sheet
  • Waterproof tape, adhesive, drain, protective panel
  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Modified asphalt waterproofing torch method "Melton 21 waterproofing method"

Low odor and smoke emissions reduce environmental impact! Modified asphalt waterproofing torch method.

The "Melton 21 Waterproofing Method" is a torch application using modified asphalt roofing developed based on highly reliable modified asphalt. Compared to conventional asphalt waterproofing thermal methods, it requires fewer materials and tools for installation, and significantly reduces smoke and odors, providing a major advantage for waterproofing work in urban areas. Additionally, since the overlapping parts of the roofing are thermally fused with a torch burner, a highly watertight integrated waterproof layer can be created. 【Features】 ■ Highly watertight waterproof layer ■ Excellent abrasion resistance ■ Excellent tear resistance ■ Excellent durability ■ Reduced environmental impact *For more details, please refer to the PDF document or feel free to contact us.

  • Coating film waterproofing material/permeable waterproofing material
  • Coating film waterproofing material/permeable waterproofing material
  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Dry Floating Bed Finishing Method "PF System"

Pursuing ultimate functional beauty! A system that can be relocated and recycled, with minimal environmental impact.

The "PF System" is a dry floating floor finishing method consisting of functional support legs PF stands and a variety of finishing materials. It can be installed not only on raised floors such as rooftops, roof balconies, and entrances but also on complex substrates with height differences. Partial removal is also possible, making maintenance of the waterproof layer and drainage pipes beneath the finishing materials easy. 【Features】 ■ A wide variety of options available to suit different applications and aesthetics ■ Excellent workability and durability ■ Reduced burden on buildings and the environment ■ Easy maintenance management *For more details, please refer to the PDF materials or feel free to contact us.

  • panel
  • others
  • Other flooring materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Waterproof Vertical Protection Method "F-Good"

Excellent effects in heat insulation, condensation prevention, and soundproofing! Waterproof vertical protection construction method.

"EFGOOD" is a waterproof vertical protection construction method using T-panel Lambda. By adopting a porous hollow structure parallel to the board material, it achieves lightness and strength, while the air layer provides excellent effects in insulation, condensation prevention, and soundproofing. Additionally, since it is composed of inorganic materials, there is no deterioration from ultraviolet rays and salt damage in coastal areas, or from sulfur dioxide and nitrogen oxides in urban and industrial areas. 【Features】 ■ Lightweight and high strength ■ Excellent effects in insulation, condensation prevention, and soundproofing ■ No deterioration from ultraviolet rays, salt damage, or nitrogen oxides ■ Uses products certified by the Public Building Association *For more details, please refer to the PDF materials or feel free to contact us.

  • Waterproof tape, adhesive, drain, protective panel
  • Waterproofing work
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Greening Method "Plasma Green Method"

We promote resource circulation by utilizing locally sourced materials and recycled resources.

The "Plasma Green Method" is an innovative new spraying technique that utilizes plant waste and excavated soil from dam sediment to create a strong slope formation, taking into consideration harmony with the environment and landscape. Once the sprayed material intertwines with the ground surface, it does not create structural gaps with the underlying soil, allowing for a foundation that experiences minimal expansion, contraction, and degradation, and it is possible to propose the absence of a wire mesh depending on the local conditions. By forming a strong foundation, it enables the establishment of communities where native large tree plants, which have slow germination and growth, are less suppressed by invasive herbaceous plants and legumes. [Features] ■ Advanced afforestation is possible ■ Strong foundation formation is possible ■ Cost reduction is possible ■ Design considerate of the landscape is possible *For more details, please feel free to contact us.

  • Civil Engineering Method
  • Renovation and repair methods
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Water Storage Tank System "Multi Aqua" [120-Liter Large Capacity Storage]

A water storage tank system that can secure drinking water and water for toilet flushing for a family of four for three days during disasters or water outages! It protects your life in times of disaster!

The "Multi Aqua" is a water storage tank system that alleviates concerns about securing "drinking water and water for daily use" during disasters or water outages, solving both quality and quantity issues. It is directly connected to the water supply, constantly storing fresh water, and its double structure of a stainless steel tank and tube prevents water from coming into contact with air, maintaining drinking quality for up to seven days. One unit can secure enough drinking water and water for toilet flushing for a family of four for three days. Installation utilizes dead space such as under floors or outdoors that is not used as living space, and it requires no maintenance. 【Features】 ■ Reliable storage capacity ■ Maintains safe water ■ Space-saving design ■ Can be used during power outages *For more details, please refer to the PDF materials or feel free to contact us.

  • Water and sewerage pipe fittings
  • Water supply facilities
  • Other store equipment and supplies
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Multi Aqua Introduction Case Study] Company A, Aichi Prefecture

As BCP and CSR measures! Examples of installations aimed at infrastructure development for business continuity!

"Multi Aqua" is a large-capacity water storage tank system with a capacity of 120 liters per unit. After a disaster, the issue of water becomes immediately pressing. We would like to introduce examples of Multi Aqua installations aimed at improving infrastructure for business continuity. Company A in Aichi Prefecture installed three 360L Multi Aqua units as part of their BCP and CSR measures. In addition to their own measures, they implemented this system to raise disaster awareness among employees. They plan to install faucets at the piping outlets, allowing water to be drawn only from the tanks. By making the installation visible from outside, they also expect to raise disaster awareness among neighboring residents and business partners. [Case Overview] - 3-unit package in a 3-row configuration - Faucets planned to be installed at the piping outlets - Water can only be drawn from the tanks *For more details, please refer to the PDF materials or feel free to contact us.

  • Water supply facilities
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Multi Aqua Introduction Case Study] K Company, Chiba Prefecture

For exhibitions where visitors can experience guided tours and assistance during their visit! It can be used for employees' drinking water during emergencies.

"Multi Aqua" is a large-capacity water storage tank system with a capacity of 120 liters per unit. After a disaster, the issue of water becomes immediately pressing. We would like to introduce examples of Multi Aqua installations aimed at infrastructure development for business continuity. Company K in Chiba Prefecture has a display where visitors can observe and experience water extraction during their visits, in collaboration with the Multi Aqua sales partner. In the event of a disaster, it is planned to be used for employee drinking water. [Case Overview] - Two units in parallel - Observation and water extraction experience available during visits - Planned for use as drinking water for employees during disasters *For more details, please refer to the PDF materials or feel free to contact us.

  • Water supply facilities
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ultra-thin high thermal insulation material "Reflectix"

Environmentally friendly ultra-thin high thermal insulation material achieving a 63% energy-saving rate!

"Reflectix" is an ultra-thin high thermal insulation material that can cut radiant heat by 99% and also prevent electromagnetic waves. It can be used not only for temperature control in buildings, factories, and stores, but also for condensation prevention inside factories and heat management from internal heat sources. 【Features】 ■ Contributes to energy savings, crude oil reduction, and CO2 reduction ■ Excellent durability, reusable even after 100 years *For more details, please download the PDF or feel free to contact us.

  • Heat shielding sheet
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

HEP & JES Method (Non-excavation Underpass Method)

Safe, fast, and precise construction of road and railway undercrossings!

The "HEP & JES method" is a non-excavation underpass construction method that allows for simultaneous execution of pavement protection work and main structure construction. Currently, there are over 130 construction achievements. <Construction Features> Due to continuous pulling towards a fixed position on the arrival side, the construction accuracy of element excavation is high, ensuring sufficient construction speed. Additionally, by selecting the appropriate excavation machine, it can adapt to various soil types. <Structural Features> Since the JES element serves as both the pavement protection work and the main structure, there is no need for separate installation of protective work, simplifying the process and minimizing the impact on the pavement. *For more details, please download the PDF or contact us.

  • Civil Engineering Method
  • Tunnel construction
  • Bridge Construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Eco Recharge: Circular Groundwater Control Method

Safe, reliable, and cost-effective groundwater measures!!

Eco Recharge (circular groundwater level control method) is a technique aimed at preventing the decline of groundwater levels by efficiently recharging aquifers. This is achieved by pumping groundwater from extraction wells and pressurizing it to inject into the ground through injection wells. Groundwater extracted from wells such as deep wells is sent to a sand separator, where impurities like sand contained in the water are removed. The treated water is then sent to a receiving tank, and through a system that integrates measurement and control, it is recharged into the ground via injection wells to control the groundwater level.

  • Water Supply Facilities
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

COMPASS method (small-diameter non-excavation underpass construction method)

Safe and fast construction of small cross-section structures under roads and railways!!

The "COMPASS method" is a construction technique developed to safely and quickly build small cross-sectional structures. 【Construction Features】 By inserting protective steel plates into the ground in advance, excavation occurs within the area enclosed by the protective steel plates, which reduces the risk of collapse and allows for safe construction. *For more details, please download the PDF or contact us.

  • Tunnel construction
  • Paving of sidewalks, roads, parking lots and stadiums
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to the Vegetation Substrate Injection Method "Green Green Mat Method"

A groundbreaking new method for creating a stable vegetation substrate layer on slopes.

Nishinippon Green Maintenance offers a vegetation substrate injection method that involves injecting a slurry-like vegetation substrate, fertilizer, and seeds into a bag-shaped mat (Green Green Mat) that is deployed and anchored on slopes, creating a vegetation foundation. The growth foundation retained by the Green Green Mat experiences almost no material flow, making it effective for greening steep slopes, rocky and soil-less slopes, slopes with abundant spring water, and cold regions prone to frost heave, which have traditionally been difficult. It also demonstrates excellent effects for greening primarily woody plants that germinate and grow extremely slowly. 【Features】 ■ Greening is possible even in harsh natural environments ■ High foundation retention capability ■ Reduction of herbaceous seed sowing amounts is possible ■ Each greening target can be achieved ■ Measures against animal damage ■ Greening of flooded slopes *For more details, please download the PDF or feel free to contact us.

  • Wall and rooftop greenery
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Mew Method

We promise construction with ample flexibility! We respond with excellent workability to meet various needs.

The "Mew Method" is a construction technique that utilizes the differentiation between tie bolts and shear bolts, employing the versatile "Mew" for both double-sided and single-sided formwork applications. The fixation requires only two bolts per set, resulting in fewer consumable parts, and the formwork assembly can be done on the ground. This significantly improves work efficiency. It can be used on any inclined surface, providing excellent constructability and meeting various needs. 【Features】 ■ Fewer consumable parts ■ Formwork assembly can be done on the ground ■ Significantly improved work efficiency ■ Usable on any inclined surface ■ Excellent constructability *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

NOP clamp / NOP method

It is possible to manufacture a variety of large formwork with reduced components and high strength using the original NOP clamp and 60 square steel pipes!

Introducing Japan Nop's "NOP Clamp / NOP Method." The "NOP Clamp 1A" is suitable for the production of various shaped formwork, such as R-shaped processing, beam under frames, and trusses, using a single tightening of 60 square steel pipes. If the separator interferes with the main reinforcement or its couplers and joints, it allows for easy movement up, down, left, and right. The use of "NOP Clamp" enhances the performance of 60 square steel pipes. 【Features】 ■ The "NOP Clamp 1A" is ideal for producing various shaped formwork, such as R-shaped processing, beam under frames, and trusses, using a single tightening of 60 square steel pipes. ■ If the separator interferes with the main reinforcement or its couplers and joints, it allows for easy movement up, down, left, and right. ■ The use of NOP Clamp enhances the performance of 60 square steel pipes. *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Wood panel and frame wall construction
  • Formwork material
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Safety plate / Simple large formwork method

It is possible to safely and easily create large formwork with fewer materials and high strength using safety plates and 60 square steel pipes!

Introducing Japan Nop's "Safety Plate / Simple Large Formwork Method." The plate with nuts and washers allows for the safe and easy fixation of 60mm square steel pipes. The Safety Plate can accommodate the replacement of bolts and washers without being limited by materials or manufacturers, and it can also be used as a mounting hardware for various components such as shuttering and wide panel beams. 【Features】 ■ Enables the safe and easy construction of large formwork with reduced materials and high strength. ■ Allows for the safe and easy fixation of 60mm square steel pipes with plates and washers. ■ Safety Plate - Allows for the replacement of bolts and washers without being limited by materials or manufacturers. - Can also be used as mounting hardware for various components such as shuttering and wide panel beams. *For more details, please refer to the PDF document or feel free to contact us.

  • Wood panel and frame wall construction
  • Formwork material
  • Support hardware/opening hardware
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pile fabric "Taenaka No Nuno"

A brand used in high-end apparel fabrics from both domestic and international brands, as well as in chairs for the National Diet Building and seats on the Shinkansen.

"Taenaka No Nuno" is a brand that uses the highest quality pile fabric woven at the foot of Mount Koya. We propose items that fulfill your desire to use truly good things in your daily life. [Features] - Dyeing using the abundant groundwater of the Kinokawa River - All processes from printing to finishing are produced in-house *For more details, please download the PDF or contact us.

  • Fabric
  • Cloth
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Inorganic Adhesive 'FJ523 General Purpose Type'

Prevents cracking, enhances adhesion, and prevents detachment! 100% inorganic water-based one-component adhesive.

The "FJ523 General Purpose Type" is an easy-to-handle inorganic adhesive that is 100% inorganic and water-based. By adjusting the direction of shrinkage during drying, it prevents cracking and enhances adhesion, preventing detachment. It improves the fire resistance of high-humidity areas such as automotive engines, mufflers, and dryers, as well as construction materials. Additionally, unlike organic adhesives, there is no concern about sick house syndrome. 【Features】 ■ Rapid curing due to the evaporation of moisture (dehydration condensation reaction) ■ High adhesion with minimal cracking or peeling during drying ■ The liquid itself is odorless, and no volatile substances or harmful gases are generated during drying ■ Non-combustible, highly heat-resistant, and does not degrade under ultraviolet light ■ Viscosity can be adjusted as desired by adding water or hot water *For more details, please refer to the PDF document or feel free to contact us.

  • glue
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration