iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      36424items
    • Facilities
      Facilities
      58086items
    • Lighting and Interior
      Lighting and Interior
      17661items
    • Common materials
      Common materials
      37179items
    • Civil Engineering Materials
      Civil Engineering Materials
      10187items
    • Construction, work and methods
      Construction, work and methods
      29261items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29651items
    • IT/Software
      IT/Software
      33666items
    • others
      others
      96116items
    • Store and facility supplies
      Store and facility supplies
      4654items
    • Office and commercial supplies
      Office and commercial supplies
      11768items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      1067items
    • Logistics Equipment
      Logistics Equipment
      7382items
    • Energy and Resources
      Energy and Resources
      11960items
  • Search for companies by industry

    • Information and Communications
      7296
    • others
      7237
    • Building materials, supplies and fixtures manufacturers
      6677
    • Service Industry
      4794
    • Trading company/Wholesale
      3103
    • Other construction industries
      2460
    • Electrical equipment construction business
      766
    • Construction Consultant
      656
    • General contractors and subcontractors
      593
    • Interior Design
      520
    • Facility Design Office
      487
    • Housing manufacturers and construction companies
      450
    • Architectural design office
      368
    • retail
      364
    • Warehousing and transport related industries
      333
    • Building Management
      303
    • Electricity, Gas and Water Industry
      286
    • Interior construction business
      283
    • Medical and Welfare
      277
    • Educational and Research Institutions
      256
    • Renovation and home construction industry
      226
    • Water supply and drainage construction business
      203
    • Transportation
      179
    • Real Estate Developers
      170
    • Fisheries, Agriculture and Forestry
      136
    • Structural Design Office
      65
    • Finance, securities and insurance
      41
    • Restaurants and accommodations
      33
    • self-employed
      30
    • Mining
      26
    • Public interest/special/independent administrative agency
      20
    • Police, Fire Department, Self-Defense Forces
      17
    • Property Owner
      9
    • Store and building owners
      9
    • Government
      9
    • Individual
      9
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Construction Consultant
  • General contractors and subcontractors
  • Interior Design
  • Facility Design Office
  • Housing manufacturers and construction companies
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Building Management
  • Electricity, Gas and Water Industry
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Property Owner
  • Store and building owners
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. ProductSearch
  3. Construction, work and methods
  4. Construction methods and technologies
  5. Special Construction Method
  6. Factory Reconstruction Method "Separate Method" [Achieving Reconstruction Without Stopping the Line]

Factory Reconstruction Method "Separate Method" [Achieving Reconstruction Without Stopping the Line]

  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

last updated:May 29, 2019

ヨシザワ建築構造設計
ヨシザワ建築構造設計
  • Official site

Are you giving up on rebuilding a factory because there is no space around the existing building? It is possible to rebuild in two phases without stopping the production line!

The "Separate Construction Method" is a technique where instead of completely demolishing an existing building and then constructing a new one, the construction period is divided into two phases, allowing for the rebuilding to take place while maintaining operations. First, machinery is moved to the second phase side, and construction begins on the first phase side. After the first phase is completed, the machinery is moved back from the second phase side to the first phase side. By completing the second phase afterward, the factory can operate at full capacity without disruption. [Recommended for such factories!] ■ There is relocation space in the adjacent area ■ There is no room around the existing building ■ It is possible to plan the production line across different floors *For more details, please refer to the PDF document or feel free to contact us.

    Special Construction Methodothers
image_01.jpg

Factory Reconstruction Method "Separate Method" [Achieving Reconstruction Without Stopping the Line]

image_01.jpg
image_01.jpg
  • Related Link - http://www.yoshizawa-arch.co.jp/business/02.html

Inquire About This Product

  • Contact Us Online

basic information

【Construction Case Study】 Inside the single-story factory that occupied the entire site, there were machine installations that made long-distance movement difficult. Therefore, a three-story building was planned to effectively utilize the space above for the first phase of construction. To ensure that operations could commence with just the completed portion of the first phase, the first and second floors were designed to be used as factory space. The parts that had minimal impact on operations were rebuilt in the first phase, allowing the second phase to be constructed without disrupting operations. In addition to implementing a highly insulated roof to prevent temperature rise and a seismic structure capable of withstanding major earthquakes, the second floor was designed to support a load of 700 kg/m2, resulting in a building with approximately three times the existing area. *For more details, please refer to the PDF document or feel free to contact us.

Price range

Please contact us for details

Delivery Time

Please contact us for details

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Company information

ヨシザワ建築構造設計

ヨシザワ建築構造設計

Other construction industries

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
  • Official site
Phone number/address

Yoshizawa Architectural Structural Design Co., Ltd. is a comprehensive design office that consistently handles everything from planning and design to construction and after-sales service for factory rebuilding and renewal in-house. There are various reasons for wanting to renew an aging factory or introduce new equipment, but the current situation is that production cannot be halted, and moving to a temporary factory incurs costs, leading to a decrease in productivity, among other challenges. Our company avoids a decline in operational rates associated with rebuilding by using methods such as "Cover Build," which involves constructing steel frames over the existing factory while keeping the production equipment in place, and "Separate," which divides the construction period into phases like Phase 1 and Phase 2. Additionally, to understand the potential damage a building may suffer during an earthquake, we conduct various seismic surveys, including crack investigations, concrete strength assessments, and rebar layout measurements. Based on the survey results, we propose seismic reinforcement plans. We support the preservation of a company's assets, including buildings, machinery, materials, and products. Furthermore, we ensure the prompt recovery and continuity of operations. Our goal at "Yoshizawa" is to provide total support from seismic diagnosis to reinforcement.

Product/Service List (28)

Popular products in related categories

[Construction Example] Converting a single-story factory into a two-story factory while maintaining the equipment.
Construction, work and methods
[Construction Example] Converting a single-story factory into a two-story factory while maintaining the equipment.
ヨシザワ建築構造設計
[Construction Case] Rebuilding the factory without extinguishing the "big pot" fire.
Construction, work and methods
[Construction Case] Rebuilding the factory without extinguishing the "big pot" fire.
ヨシザワ建築構造設計
Factory reconstruction method "Cover Build Method" allows for rebuilding while maintaining factory operations!
Construction, work and methods
Factory reconstruction method "Cover Build Method" allows for rebuilding while maintaining factory operations!
ヨシザワ建築構造設計
Factory Reconstruction Method "Connection Method"
Construction, work and methods
Factory Reconstruction Method "Connection Method"
ヨシザワ建築構造設計
Factory Reconstruction Method "Separate Method" [Achieving Reconstruction Without Stopping the Line]
Construction, work and methods
Factory Reconstruction Method "Separate Method" [Achieving Reconstruction Without Stopping the Line]
ヨシザワ建築構造設計

Related New Products

Support and fixation rail for machinery and equipment "Rail Ace"
others
Support and fixation rail for machinery and equipment "Rail Ace"
八州電工

The related categories of Special Construction Method

  • Construction, work and methods
  • Construction methods and technologies
  • Special Construction Method
  • others
Find products and companies by related keywords
  • #Construction method
  • #Replacement method
          

Inquire About This Product

  • Contact Us Online

Products

  • Search for Products

Company

  • Search for Companies

Special Features

  • Special Features

Ranking

  • Overall Products Ranking
  • Overall Company Ranking

support

  • site map
IPROS
  • privacy policy Regarding external transmission of information
  • terms of service
  • About Us
  • Careers
  • Advertising
IPROS Services
  • >IPROS GMS | Search site for the manufacturing industry
  • >IPROS | Search site for the B2B industry
COPYRIGHT © 2001-2026 IPROS CORPORATION ALL RIGHTS RESERVED.
Please note that the English text on this page is automatically translated and may contain inaccuracies.