Construction method Product List and Ranking from 1584 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:May 27, 2026~Jun 23, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:May 27, 2026~Jun 23, 2026
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. SUIKEN Co., LTD Shiga//Building materials, supplies and fixtures manufacturers
  3. 徳和工業 Miyagi//Other construction industries
  4. 4 AP工法協会 Tokyo//Interior construction business
  5. 5 シーカ・ジャパン Tokyo//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:May 27, 2026~Jun 23, 2026
This ranking is based on the number of page views on our site.

  1. Vacuum concrete construction method 徳和工業
  2. Wet-type spray seismic reinforcement method "AP Method" AP工法協会
  3. APLAS Sheet Method for Shortening Construction Periods of Aging Infrastructure Reinforcement アウロステクノロジーズ
  4. 4 Continuous Water Valve for Polyethylene Pipes "KATANA Valve" SUIKEN Co., LTD
  5. 5 Solar installation on flat roofs! Waterproof integrated mounting base "Connection Disk ADC". アーキヤマデ

Construction method Product List

3211~3240 item / All 4307 items

Displayed results

Sodium Bicarbonate Blast Method (SBS Method)

Baking soda is water-soluble and harmless! The combination of shot material and pressure allows for adjustable cleaning power.

Introducing the "Sodium Bicarbonate Blast Method (SBS Method)." Sodium bicarbonate, commonly known as baking soda, is widely used as a food baking powder. It is also effective as a cleaning agent, releasing carbon dioxide at 270 degrees and forming a colorless solid that exhibits mild alkalinity in its aqueous solution. This technology allows for the suppression of impact force at low pressure. The effect of baking soda enables the removal of oily substances. 【Features】 ■ Baking soda is water-soluble and non-toxic ■ Cleaning power can be adjusted by combining shot materials and pressure ■ Impact force can be suppressed at low pressure ■ The effect of baking soda allows for the removal of oily substances *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP grid reinforcement method

Compliant with RC design standards! It is effective in countering frost damage in cold regions and salt damage in coastal areas.

The "FRP Grid Reinforcement Method" is an FRP lattice reinforcement made by integrally molding high-performance continuous reinforcement fibers such as carbon aramid and glass that are impregnated with resin. It has a very low specific gravity, and since the lattice intersections are on the same plane, its cross-section is thinner compared to rebar. Additionally, it is easy to transport, does not require heavy machinery, and is not restricted by construction space. 【Features】 ■ Thin and light ■ High reinforcement effect ■ No corrosion ■ Complies with RC design methods ■ Thinner cross-section compared to rebar *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP mesh sheet peeling prevention method

The mesh net on the back prevents the fall of small pieces less than a few centimeters. It is suitable for short-term work at night.

The technology is a method for preventing spalling of concrete using continuous fiber FRP lattice reinforcement. The high-strength FRP lattice reinforcement supports the weight of detached concrete chunks, while the mesh net on the back prevents the fall of small pieces measuring less than a few centimeters. Additionally, since it does not integrate with the structure using resin-based adhesives or mortar, surface preparation and waterproofing or drainage treatment are unnecessary, allowing for installation even on wet surfaces with leaks or condensation. 【Features】 ■ Installation is quick as it only requires anchoring to the structure. ■ No curing or drying time is needed, allowing for a shorter construction period. ■ Suitable for short-duration work at night. ■ Can be installed across joints. ■ Visual inspection of the substrate is possible through the mesh net. *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Protective Lining Method (Lifetex Method)

A surface coating system with long-term durability that is effective for anti-corrosion measures and salt damage prevention, while maintaining performance.

We would like to introduce the "Protective Lining Method (Lifetex Method)." We offer various methods, including the "Lifetex LH Method," which combines the ability to prevent the intrusion of chloride ions, water, oxygen, and carbon dioxide—causes of concrete deterioration—with crack-following properties that can accommodate hairline cracks, as well as the "Lifetex LA Method," which maintains the performance of concrete spalling. You can choose according to your needs. 【Lineup】 ■ Lifetex LH Method ■ Lifetex LA Method ■ Lifetex V-FRP Method *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Exposed Type Elastic Fixed Column Base Method "IS Base" Comprehensive Catalog

The ever-evolving IS base is paving the way for new construction methods in a new era.

This is an introduction to the comprehensive catalog of the IS base column footing method. The IS base is a column footing method that constantly researches and pursues the strength and rigidity required for seismic design, utilizing unique materials and shapes for anchor bolts and adopting BOP method base plates. It flexibly responds to changes in architectural needs due to the flow of the times. We continue to take on challenges in any era. 【Contents】 ■ About IS base ■ Construction methods ■ Lineup by type ■ Examples of construction ■ Company overview, etc. *For more details, please download the PDF or feel free to contact us.

  • Earthquake-resistant construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Tile Fix: A Flaking Prevention System That Does Not Detract from Aesthetics

Safety and security on tiled walls enhance the health of the building and increase its asset value!

The Tile Fix method is a direct fixing technique for floating tiles to the underlying structure using a special stainless steel anchor (Tile Fix) and dedicated epoxy resin. There is no need to remove or dispose of the floating tiles. It is a resource-saving and environmentally friendly method. **Seven Features of the Tile Fix Method** - Integrates floating tiles with the concrete structure. - Safe and possesses sufficient strength. - Reliable effects can be expected. - Accommodates the thickness of the adhesive mortar layer. - Does not compromise aesthetics. - No need for tile removal or disposal. - Reduces repair costs. *For more details, please download the PDF or contact us.*

  • Company:Toho
  • Price:Other
  • Exterior tiles
  • Tile work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Tile peeling prevention method "Tile Fix" that does not compromise aesthetics.

Repair for floating exterior wall tiles! Many achievements in public facilities. Excellent cost-effectiveness!

"Tile Fix" is a repair method that integrates floating tile fragments with the concrete substrate to prevent detachment. It does not damage the tile fragments and does not compromise the aesthetic of the building by applying it to the grout areas. By using a dedicated epoxy resin and fixing it directly to the substrate, it reduces the hassle of removing and disposing of waste materials, allowing for cost-effective repairs. [Features] ■ By adhering the product inserted into the concrete substrate with dedicated epoxy resin, it strongly fixes and integrates the tile fragments. ■ Numerous construction achievements in public facilities. *For more details, please refer to the materials. Feel free to contact us as well.

  • Company:Toho
  • Price:Other
  • Special Construction Method
  • Tile work
  • Exterior tiles
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Eco base (Eco cute tank unit, foundation exclusively for electric water heater installation)

Significant reduction in construction period and specialized in seismic performance!!

"Eco Base" is a concrete foundation specifically designed for the installation of eco-cute tank units and electric water heaters, developed in collaboration with Chubu Electric Power Co., Inc. It is completed simply by combining concrete blocks and tightening them with bolts, allowing for a significant reduction in construction time compared to traditional on-site methods. An aluminum rail is embedded in the top surface of the blocks, enabling the fixation of anchor bolts for almost all eco-cute tank units, regardless of manufacturer or model. 【Features】 ■ Achieves excellent seismic resistance (proven through seismic strength tests at Tohoku University’s Faculty of Engineering) ■ Can fix anchor bolts for almost all tank units without regard to manufacturer or model. ■ No formwork required, significantly shortening construction time!! ■ Contributes to environmental issues by not generating formwork waste. ■ Can be constructed regardless of season or weather, as it only requires assembling blocks. *For more details, please download the PDF catalog or feel free to contact us.

  • Earthquake-resistant construction method
  • Residential foundations
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Joint repair method "Mejimoru/Mejimoru underwater type"

It's very easy since you only need to add water! A joint repair method using high-strength mortar with a compressive strength of over 40 N/mm².

We would like to introduce our joint repair method, "Mejimoru/Mejimoru Underwater Type." "Mejimoru" is a method that uses a high-performance mortar with a compressive strength of 40N/mm² or more, combined with a formulation of resin and fibers that provides stable adhesion and crack resistance. The "Mejimoru Underwater Type" can be applied simply by mixing it with water, allowing for the repair of damaged areas in concrete structures that are constantly submerged in water. 【Features of Mejimoru】 ■ Can be applied by one person at a rate of 20m to 30m per day ■ Very easy to use, as it only requires the addition of water ■ Uses high-strength mortar with a compressive strength of 40N/mm² or more ■ Stable adhesion due to the formulation of resin and fibers ■ High-performance mortar with crack resistance *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Cement mortar coating
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Non-excavation method "Advancement method"

It can be utilized not only in sewers but also in gas, water supply, agriculture and water resources, electricity, communications, etc.

The "pushing construction method" involves attaching a tunneling machine to the tip of a push pipe (mainly reinforced concrete pipes) and excavating underground while literally pushing the pipe forward with hydraulic jacks from the rear to install it. This method can accommodate a wide range of pipe diameters, from large-diameter to small-diameter pipes, and can handle various soil conditions, from soft ground to gravel and bedrock layers. [Types of Pushing Construction Methods] ■ Large and medium diameter pipe pushing method (open type / closed type) ■ Small diameter pipe pushing method (high load-bearing method / low load-bearing method / steel casing pipe method) ■ Special pushing methods (box culvert pushing method / de-slipping curtain method) *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Avoiding Obstacles with Vertical Curves (Arc Advancement)

The construction period associated with the shaft can be shortened, and costs for the structures of both shafts or piping, etc., can be reduced.

We would like to introduce a construction case of avoiding obstacles using the "arc propulsion" vertical curve, requested from Ishikawa Prefecture. This construction was planned as a river crossing project. To cross the river, the bank sheet piles posed an obstacle, so it was planned with "steep slope start → vertical curve → steep slope reach" to ensure the separation of the pipeline. 【Project Overview】 ■ Project Name: Seismic Reinforcement Project for Prefectural Water Supply Pipeline - Pipeline Burial Work (Kanazawa-1-53) ■ Location: Akatsuchi-cho to Kannon-do-cho, Kanazawa City, Ishikawa Prefecture ■ Method: Ultimate mud-water pressure propulsion method ■ Propulsion Pipe Diameter: Ф1350mm Hume pipe (Main pipe Ф900mm DIP-NS) ■ Propulsion Length: L=259m (Vertical/R550m, R380m Horizontal/R2000m) ■ Cover Depth: 3.9m to 16.8m ■ Soil Conditions: Sandy silt to clay to sandy silt ■ Pipeline Gradient: Start -11.3° Reach +16.8° *For more details, please feel free to contact us.

  • Other civil engineering works
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Composite Coating Waterproofing Method 'AXSP'

The waterproofing layer plays an important role in the lifespan of a building!!

The "AXSP" construction method is a bonding cushioning technique that combines the excellent elongation properties of "Asdox" with the toughness of "Super Paleo." This method prevents any impact on the main waterproof layer even if structural cracks occur. 【Features】 ■ Cushioning effect ■ Protects the main waterproof layer ■ Complete adhesion ■ Does not create water paths ■ Seamless finish *For more details, please feel free to contact us.

  • Housing structure technology/long-term superior housing technology
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "W2R Method"

We will achieve a drainage ditch renovation that excels in walkability and durability!

The "W2R method" is a drainage channel renovation technique that has very little impact on existing sidewalks, private land, and surrounding residents, making it very environmentally friendly. After cutting with the W2R cutter, the installation of the Pca cover allows for excellent workability and the possibility of shortening the construction period. Additionally, this method can cut from the inside without damaging the drainage channel, improving the three major issues of conventional methods. 【Features】 ■ Excellent workability ■ Very gentle on the surrounding environment ■ The W2R cutter can cut from the inner surface of the drainage channel ■ Excellent drainage capability ■ Excellent drivability *For more details, please contact us.

  • Gutters and U-shaped gutters
  • Renovation and repair methods
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Gradient Construction Method for Residential Exterior Walls "KF Gradient Method"

The design of deteriorated siding can be easily restored. Using high weather-resistant paint reduces maintenance frequency!

The "KF Gradient Method" can restore the aesthetic appeal of ceramic siding boards that have faded due to aging. By using a special roller, it is possible to achieve a design rich in aesthetics even for siding boards that previously could only be painted flat. Using a highly weather-resistant paint that has been proven in outdoor exposure tests on Miyako Island, Okinawa, the work can be completed in a minimum of three processes. 【Features】 ■ Achieves a colorful aesthetic that looks just like new ■ Easy application using the dedicated "KF Gradient Roller" ■ Environmentally friendly, odorless all-water-based specifications are also available ■ Contributes to reduced maintenance frequency due to the use of highly weather-resistant paint *For more details, please refer to the PDF document. Feel free to contact us with any inquiries.

  • Heat-insulating paint for exterior walls (roofs, rooftops, etc.)
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Multicolored pattern paint for residential exterior walls / Gradient method <Video now available>

Ensure high design quality even during siding repainting. Excellent weather resistance maintains the beauty of the appearance for a long time.

Our company offers a lineup of finishing paints and repainting methods for residential exterior walls that excel in weather resistance and achieve a high level of design with ease. 'KF Super Jewel Coat II' is a decorative patterned paint that adds design to the weather resistance of inorganic paints. It can be applied with a standard medium-nap roller, achieving a natural stone-like appearance that cannot be expressed with single-color paints. 'KF Gradation Method' is a repainting technique that revives the design of faded ceramic siding. Using a special roller, it can express patterns and shades that utilize the texture of the siding in a minimum of three steps. 【Common Features and Benefits】 ■ Based on paints that have been confirmed to have extremely high weather resistance in outdoor exposure tests conducted in the harsh natural environment of Miyako Island, Okinawa Prefecture. ■ Contributes to maintaining aesthetic appeal and asset value with high design quality. ■ Contributes to reducing maintenance frequency with high weather resistance. *For more details, please refer to the PDF materials or feel free to contact us.

  • paint
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Repair Method "KM Rivet Method"

A new method for riveting using high-frequency induction heating.

Our company is currently conducting mechanical research, construction research, and diagnostic technology research related to rivet joints in collaboration with multiple universities. In particular, in the construction research, we have successfully developed a construction system that improves the compactness of a series of materials and equipment related to rivet installation, as well as construction efficiency and safety, by adopting an electromagnetic induction heating method, which differs from the conventional rivet heating method. We obtained a patent for this in 2021. 【Features】 ■ Speedy construction Rivets are instantaneously heated by high-frequency induction heating, allowing them to reach a temperature suitable for installation in just a few seconds. ■ Excellent safety No need for a fire bed. No need to pass high-temperature rivets. The risk of fire is extremely low. ■ Standardized work No special skills from skilled workers are required. ■ Modular construction equipment Generator, high-frequency power supply, and heating coils are modularized. *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

High Concentration Thin Layer Dredging Method "Submarine Cleaner (SMC) Method"

Won the "Excellence Award" at the 13th National Land Technology Development Award! It is a patented underwater vacuum cleaner.

The "Submarine Cleaner (SMC) Method" is a device that can remove organic matter or floating mud deposited on the seabed without causing turbidity, up to a depth of 10 cm. It has a removal efficiency of 82% for plankton cysts (dormant cells) and 88% for cesium. 【Features】 ■ Capable of dredging at a thickness of 10 cm to 15 cm ■ Thin-layer dredging without turbidity even near aquaculture sites ■ Efficiently raises bottom sediment ■ Reduces the amount of sediment to be disposed of ■ Smooth continuous operation without sinking ■ Cultivates the seabed sediment ■ Does not create depressions on the seabed *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Foam construction method

Renovation method for installing window frames and door frames that can be carried out without scaffolding even at the top of a 10-story apartment building!

This technology is a revolutionary construction method that can achieve a reduction in construction types, shorten construction periods, lower costs, and reduce environmental stress. It can be installed regardless of the material of the window and door frames or the structure of the building. Since it does not use welding (fire), it can be implemented in facilities where open flames are prohibited. Additionally, because it is an indoor construction method, it eliminates the need for temporary scaffolding, allowing for cost reduction and shortened delivery times. Furthermore, due to the surface connection, it can be applied to openings in finishing materials that do not have a substrate. 【Features】 ■ Shortened construction time (urethane curing time is only 2 to 5 minutes) ■ No welding required (can be used in fire-prohibited areas as there are no sparks) ■ No mortar needed (less curing and dirt) ■ No screws required (temporary fixing level, easy to move) ■ No scaffolding needed (can be installed even at the top of a 10-story apartment building) *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Branch Shield Method (Underground Stem Method)

Constructing two tunnels that intersect in a T-shape with underground branching from the main line shield!

The "Branch Shield Method" is a shield construction technique that simultaneously constructs two intersecting tunnels in a T-shape using a main line shield and a branch shield that launches laterally from within the main line shield. By launching the branch shield directly from within the main line shield, the need for an intermediate shaft is eliminated, and the setting of the branching position is not affected by surface conditions or the presence of buried objects above the pipeline. 【Features】 ■ The main tunnel and branch tunnel can be constructed simultaneously. ■ The branching position is not affected by conditions near the surface. ■ Ground improvement at the branch shield launch point is not required. ■ Shortened construction period and reduced costs. ■ The ratio of the outer diameter of the main tunnel to the outer diameter of the branch tunnel (approximately 60-65% of the outer diameter of the main shield is a guideline). *For more details, please download the PDF or contact us.

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Soil pressure type parent-child shield method

Continuously construct two types of tunnels with different cross-sectional diameters within the excavation extension.

The "Soil Pressure Type Parent-Child Shield Method" is a construction method that allows for the continuous construction of tunnels with varying cross-sectional diameters using a single shield within the shield excavation extension. A smaller child shield is incorporated within the parent shield to excavate the parent cross-section tunnel. At a designated position, the child shield is separated and launched underground from the parent shield to construct the child cross-section tunnel. By sliding the rear body of the child shield forward to incorporate it and adopting a method where the rear body is pushed out by the shield jack during assembly, the separation and launch can be completed in a short period. 【Features】 ■ The underground separation method eliminates the need for the installation costs of shafts and securing land at the position of cross-section changes. ■ The rear body push-out method significantly simplifies the assembly work of the child shield. ■ During the separation and launch operations, the front body remains fixed to the parent shield with a reaction pin, maintaining the stability of the face. *For more details, please download the PDF or contact us.

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

NS Beam Method

A precast method for simultaneously pouring the upper part of the beam and the slab with slab concrete strength.

The "NS Beam Method" is a construction technique that consists of placing concrete with the same strength as the floor slab on the upper part of the beam. This method reduces the materials needed for the stop formwork and the labor required to install the stop formwork, thereby streamlining and saving labor in the construction process. Beams manufactured according to the design and construction guidelines of this method do not experience any impairments during the service limit state or damage that compromises repairability during the damage limit state. Additionally, it has been confirmed and proven through structural performance testing that this method possesses the ultimate strength and deformation performance defined by the guidelines at the safety limit state. This method has obtained a building technology performance certification from the Japan Building Disaster Prevention Association. *For more details, please download the PDF or contact us.*

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

We present the comprehensive catalog of Renotech Co., Ltd.'s "Net Barrier Method"!

What is the renewal method that simultaneously achieves the prevention of exterior wall peeling and the enhancement of the building's asset value using the "Exterior Wall Composite Renovation Method (NB Method)"?

At Rino Tech Co., Ltd., we offer the "Net Barrier Method (Composite Exterior Wall Renovation Construction Method)" aimed at preventing the peeling of deteriorated mortar-finished exterior walls and tiled exterior walls. ☆ Ministry of Construction (now the Ministry of Land, Infrastructure, Transport and Tourism) Technical Evaluation Certified Method [Technical Evaluation No. 96102]☆ 【Contents】 ■ What is the Net Barrier Method (Composite Exterior Wall Renovation Construction Method)? ■ Issues with Conventional Methods ■ Mechanism of the Net Barrier Method ■ Differentiation of the Net Barrier Method ■ Case Studies ■ Demand Examples ■ Expansion of the Net Barrier Method (Benefits) ■ Inquiries *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Special Construction Method
  • Unit and other construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A must-see for those struggling with the renovation of asbestos-containing coatings! Achieve prevention of peeling at the same time!

A new proposal to prevent the dispersion of asbestos! What is the 'Net Barrier Method' that can renew the building's finish without the need for coating removal and prevent exterior wall peeling?

Are you facing any of these issues with asbestos removal work? - Unable to start construction due to a lack of manpower... - Even while progressing with the removal, problems arise during surprise audits, making it difficult to advance the work... - Buildings like schools and public facilities bear risks as they cannot extend the construction period... and more. Renotech's self-developed 'Net Barrier Method (Composite Exterior Renovation Construction Method)' will solve these problems! - The 'Net Barrier Method' is a responsible construction method that applies existing techniques, requiring minimal training for managers and workers. - Developed as a pin-net method, it reduces the risk of asbestos dispersion by covering rather than removing it. - With minimal substrate treatment, new paint finishes or tile finishes are possible! - Asbestos-related work only requires the removal of the coating by drilling a Φ10.5mm hole before pinning! - In some regions, it may be considered "small-scale work" and exempt from asbestos regulations. - A dispersion confirmation test conducted by a third-party organization has been completed! No asbestos detected. - With the legal amendments enacted in April 2021, regulations regarding work on asbestos-containing coatings have been relaxed, making work easier. *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Special Construction Method
  • Plastering and painting work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Exterior Wall Composite Renovation Construction Method "Net Barrier Method"

Asbestos measures! Compatible with asbestos-containing finishing materials! Prevents the peeling of finishing materials!

The "Net Barrier Method" is a technique aimed at preventing the peeling of deteriorated mortar-finished exterior walls and tiled exterior walls. Before pinning, simply remove the coating using a φ10.5mm recessed drill. *Repair of weak areas (such as chipping) should be done while using a vacuum cleaner with a HEPA filter to suction debris. It has a peeling prevention effect for the finishing material and enhances the design quality with new finishes. 【Features】 ■ Excellent dust collection using a water-circulating vibration-free drill ■ Peeling prevention effect ■ No detection of asbestos fibers *For more details, please refer to the PDF document or feel free to contact us.

  • Civil Engineering Method
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

老朽化した学校施設の長寿命化に『ネットバリヤー工法P1』

文科省が推進する建物の長寿命化に!外壁の剥落防止と新規塗装仕上げを同時かつ高次元で実現!安心の10年保証対応。カタログ進呈中。

現在、文科省により、学校施設の長寿命化改修が推進されています。 建物の深刻な老朽化と厳しい財政状況の中、従来のような建て替えではなく コストを抑えながら建て替え同等の教育環境の確保が求められています。 「ネット上バリヤー工法P1」は外壁のモルタルやタイルの剥落を長期にわたって防止しつつ 新規塗装仕上げによって新築時に近い美観を確保します。 【学校長寿命化改修に選ばれる理由】 ■責任施工体制で確実な施工 ■使用粉体「プレミックスライトフィラー」は混和液不要  (下地調整、ネット張り、上塗り、全てに使用可能) ■「P1ネット」には防弾チョッキにも使われるアラミド繊維を採用 ■アンカーピン「ノックスアンカーKNA」は樹脂注入、打込棒不要 ■作業の簡素化、短い工期で施工効率がUP ■技術審査証明取得工法(BCJ-審査証明-189) ■都市再生機構認定工法 ネットバリヤー工法は、「全国エアロ会」会員による責任施工体制で運営しています。 全国の有資格者による施工及び管理で品質を確保しています。 ※詳しくはPDF資料をご覧いただくか、お気軽にお問い合わせ下さい。

  • Subsidiary materials
  • Reinforcement and repair materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Soil Pressure Support Method "Multi Board (Retaining Wall) Method"

We will support the soil pressure on the PCa version using commonly available piles!

The "Multi-board (Retaining Wall) Method" is composed of piles and PCa panels (precast panels), and it is a method designed to support the earth pressure acting on the PCa panels with the piles. The standard spacing for pile installation is 4 meters, and to transfer the earth pressure from the PCa panels to the piles, the PCa panels are fixed to the front face of the piles using connecting fittings. This allows for a retaining structure that does not expose the piles, resulting in an aesthetically pleasing appearance. 【Effects】 ■ By combining H-shaped steel as the parent pile with PCa panels, the structure does not require a base slab, which reduces the excavation width, making it possible to construct in sites where securing excavation width is difficult. ■ Since a base slab is not required, this structure reduces the number of pile foundations, the amount of foundation concrete, and the volume of excavation, enabling cost reduction and shortening of construction time. *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Concrete Retaining Wall
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Polyethylene mat "Purashiki"

1220×2440mm, with a load capacity of 60t and weighing only 39kg. No crane lifting is required, improving safety and efficiency.

"Plashiki" is a large, lightweight, and durable polyethylene sheet. Measuring 1220×2440mm and weighing only 39kg, it can be transported without the use of a crane, contributing to reduced work time and improved safety. It is used in various locations such as residential sites, development sites, and golf courses, and has a wealth of usage records with the U.S. military. 【Features】 ■ Resistant to cracking and has shape memory properties that allow it to return to its original shape even when bent ■ Slip-resistant treatment applied to both sides, ensuring safety in rain, snow, and on slopes ■ Stronger than typical rubber mats and plywood, while being lighter than steel plates *For more details, please refer to the materials. Feel free to contact us with any inquiries.

  • Paving Materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SCBR method for replacing hollow slab bridges using upper and lower precast methods.

A new connection structure for pretensioned PC girders! Ideal for replacing cast-in-place hollow slabs. Updating while utilizing existing piers. Of course, it's also suitable for new bridge construction!

The SCBR method (Smart Connected Bridge) is a construction technology for concrete bridges that offers benefits such as alleviating labor shortages, reducing on-site work, and ensuring high quality through factory production. By using this method, it is possible to replace deteriorated RC hollow slab bridges in a short period while utilizing existing bridge piers, such as two-column types. It is also adopted to reduce noise through jointless bridge construction and simplify maintenance management. 【Features】 ■ Shortened construction period ■ Reduced regulations and costs ■ Easier maintenance management ■ Preservation and consideration of landscape, etc. *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Bridge Construction
  • Bridge Materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pre-stressed Concrete Method

Overcoming the weaknesses of concrete! Copper material, which has 5 to 6 times the strength of rebar, secures the concrete.

"Prestressed Concrete (PC)" literally means "concrete that has been pre-stressed." PC structures are composed of concrete members reinforced by applying compressive stress with high-strength steel, resulting in lightweight, high-quality, and durable structures. Our company is committed to the development of construction techniques for the "Prestressed Concrete Method." We have a wide range of expertise in various structures, including bridges, buildings, containers, port structures, and underground structures, and we have constructed many PC structures. [Our Achievements] - We have handled over 20,000 PC structures. - We have constructed a wide range of projects, from small to large scale. - We have built many PC structures, including bridges, buildings, containers, port structures, and underground structures. - In addition to construction, we have developed various technologies for investigating, repairing, and reinforcing PC structures to protect and utilize them. *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Oriental Shiraishi Technology Introduction

Repair, reinforcement, and renewal! We contribute to society through a diverse range of technological development and practice.

At Oriental Shiraishi, we are further strengthening our efforts in the diversifying fields of repair and reinforcement by advancing our technical expertise based on extensive knowledge, experience, and a wide range of comprehensive engineering and technology. As we enter the era of renewal, we are developing new technologies and methods to meet your needs, focusing on our areas of expertise in repair and reinforcement of PC technology and foundation technology. 【New Technologies and Methods (Excerpt)】 ■ Seismic reinforcement of column-type foundations - Kui Taishin-SSP method - PC Well-Refre method ■ Seismic reinforcement of bridge piers - Pier-Refre method - Pier-Refre method (bending reinforcement specification) - RSP Lift-Up method, etc. *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration