Construction method Product List and Ranking from 1597 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 日本海洋サービス 大阪支店 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 Temporary bridge temporary pier cable-stayed construction method "LIBRA Method" 横山基礎工事

Construction method Product List

1606~1620 item / All 4237 items

Displayed results

Slope Erosion Prevention Surface Soil Erosion Control Method "EPM"

Measures against frequent guerrilla rainstorms. Maintenance is easy because the materials can be replaced.

"EPM" is a surface soil erosion control method that can prevent erosion of ground layers up to approximately 1.0m thick. By using a tensile "EPM net (wire mesh)" to secure the entire slope, it is possible to prevent slope erosion and the outflow of seeds from the "EPM mat." Even if the ground surface subsides, the compressive effect from the rebound force of the support springs continuously applies pressure to the ground, maintaining the effectiveness of soil erosion control. 【Features】 ■ Prevents slope erosion and seed outflow ■ Suppresses surface soil outflow ■ Continuously controls soil outflow ■ Excellent workability and easy maintenance ■ Shortens construction time and reduces costs *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SUS (stainless steel) & SGP (steel pipe) prefabricated eco construction method

The idea of outsourcing "construction sites"! We will solve various challenges faced by the site.

The construction method responds effectively to the current needs for environmental protection, construction site conditions, working environments, safety, and cost awareness. By not bringing in materials and equipment, it reduces noise and smoke generated from on-site work. It also addresses the reduction of waste materials such as scrap and packaging. Additionally, it allows for management of work processes according to the construction schedule, enabling appropriate personnel allocation in line with product delivery dates. 【Features】 ■ Environmental conservation ■ Safety measures ■ Reduced number of entrants ■ Cost reduction ■ Shortened construction period ■ Improved quality *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Piping and insulation
  • Water and sewerage pipe fittings

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rope access technology

Safe, reliable, low-cost close visual inspection in high and difficult locations.

Our company offers a groundbreaking technology called "Rope Access Technology," which enables safe and low-cost work in difficult and high-altitude locations. This technology has been improved from SRT technology, which was developed for cave exploration, allowing qualified personnel to move to the desired location more safely, easily, quickly, and reliably, thereby ensuring safer on-site inspections. 【Features】 ■ Safe and reliable ■ Low cost ■ Full service from planning to execution ■ Diverse qualified personnel *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Excavation Shield Method "OSJ Method"

A groundbreaking advanced technology for underground conduit installation work.

The "OSJ Method" is a continuous excavation shield pipe (box) installation method that involves performing a series of operations from excavation to backfilling while conducting soil retention using an open shield machine (OSJ machine) during the underground construction of pipes (box culverts) and open channels in urban areas. With a wealth of construction achievements, continuous improvements to the machinery, and numerous patents obtained, this method has now established itself as a reliable and unique construction technique, enabling safer and faster construction. Additionally, this method is registered in ARIC (Agricultural and Rural Development Private Technology Database). 【Features】 ■ Reduction of impact on living environments and decrease in traffic disruptions ■ Improved safety ■ Wide applicability ■ Significant shortening of construction periods ■ Cost reduction *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

All Geological Adaptable Open-Cut Shield Method "OSJ-CONG Method"

Eliminates the need for auxiliary waterproofing methods such as liquid injection! It is also possible to reduce the impact on the surrounding area.

The "OSJ-CONG method" suppresses the outflow of groundwater from the face and the inflow of groundwater from the excavation bottom, eliminating the need for groundwater lowering methods such as well points and auxiliary waterproofing methods like chemical injection. By equipping the OSJ machine itself with collection and drainage functions, it eliminates the prior lowering of groundwater levels and allows for early recovery of water levels after passing through the OSJ machine. Furthermore, by minimizing the duration of groundwater level reduction, it prevents impacts on the surrounding area. 【Features】 ■ Prevents collapse of the face by suppressing the outflow of groundwater from the face. ■ Improves the constructability of the foundation by suppressing the inflow of groundwater from the excavation bottom. ■ Eliminates prior lowering of groundwater levels and enables early recovery of water levels after passing through the OSJ machine. ■ Minimizes the duration of groundwater level reduction, thereby preventing impacts on the surrounding area. *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Dissolving kettle "Pipe-type asphalt dissolving kettle"

Standard installation of a bimetal thermometer and an internally opening and closing special asphalt cock!

The "Pipe-type Asphalt Melting Kettle" is a melting kettle with internal heating that achieves high fuel efficiency and economic benefits. The main body of the melting section is insulated with glass wool (16kg/m3), providing excellent thermal insulation and preventing heat impact on the slab. Additionally, it is equipped with wide tires, making it easy to move. 【Features】 ■ Achieves high fuel efficiency and economic benefits ■ High thermal insulation performance with no heat impact on the slab ■ Easy to move with wide tires ■ Can be completely fixed using support legs and jacks during use ■ The melting kettle, burner, and fuel tank are integrated, minimizing damage and facilitating installation *For more details, please download the PDF or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Long-term corrosion protection system for steel materials "Puzzle(R) Method"

It is a long-term corrosion protection system for steel materials using room temperature metal thermal spraying!

The "Puzzle(R) Method" is a corrosion protection technique that dramatically enhances the corrosion resistance of sacrificial anode metal spraying (aluminum/zinc) and protective coatings by combining them, pursuing the principle of [1+1=4]. With the introduction of advanced sealing materials [Highbon AZ Sealer] and primer for metal spraying [Highbon Conductive Primer], it has become a groundbreaking long-term corrosion protection system for steel materials. 【Goals of the Puzzle(R) Method】 ■ Improvement of expected service life of corrosion resistance ■ Reduction of LCC (Life Cycle Cost) ■ Enhancement and generalization of maintenance technology ■ Gaining trust in steel materials *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Small Injection Gun for Waterproofing Work 'KG-330 I (for High Viscosity)'

Greasing and injection work for bearings! Introducing our manual high-pressure small injection gun.

We would like to introduce the "KG-330 I" handled by Takasho Sangyo Co., Ltd. It comes with an injection nozzle and replacement packing. It is suitable for high viscosity (cream-like to grease-like viscosity). Please feel free to contact us if you have any requests. 【Specifications】 ■ Capacity: 300ml ■ Cylinder diameter: φ60mm ■ Total length: 408mm ■ Discharge amount: 1.5ml ■ Maximum pressure: 25MPa ■ Weight: 1.41kg *For more details, please refer to the PDF document or feel free to contact us.

  • Waterproofing work
  • Work tools

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Basic Pile Installation Method: "Cement Milk Casing Method"

The vertical accuracy of the excavation hole is extremely good! A foundation pile installation method with increased rigidity that is strong against bending.

The "Cement Milk Casing Method" is a construction technique that adds a casing rotation mechanism to the outside of the auger screw, allowing the auger screw and casing to rotate relative to each other while excavating. This method is effective across a wide range of ground conditions, and can be applied to gravel ground, cobble layers, boulder layers, bedrock layers, sloped bedrock layers, and ancient cave layers in former coal mine sites. 【Features】 - The relative rotation of the auger screw and casing ensures excellent vertical accuracy of the excavation hole. - There is almost no high stopping of the piles. - The adhesion between the piles and the original ground is good. - There are no concerns regarding bearing capacity. *For more details, please feel free to contact us.

  • Pile and foundation work
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SMW Soil Continuous Wall Method

By using different mixing devices that match the soil conditions, a uniform and high-quality continuous wall can be constructed.

This technology involves using a multi-axis earth auger equipped on a three-point pile driver to drill into the original ground while mixing and stirring with a cement-based slurry to create a continuous wall and insert stress materials with appropriate strength. By utilizing mixing devices that are suitable for the soil conditions, it is possible to create a uniform and high-quality continuous wall. Additionally, it can be used for various applications such as retaining walls, water-stopping walls, underground collapse prevention walls, various ground improvements, and pre-drilling for sheet pile driving in hard ground, making it versatile across a wide range of uses. 【Features】 ■ Can be constructed if there is more than 400mm between adjacent structures and the soil core ■ By changing the drilling and mixing device, it is possible to increase the pile diameter ■ Usable across a wide range of applications *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Donut auger method

Introduction to the casing pile insertion method, which is extremely effective for groundwater pollution control.

This technology is a foundation pile embedding method that ensures reliable construction by inserting piles into a casing, preventing damage to the piles from impacts and other factors. It can be implemented even in ground conditions with groundwater flow and where excavation holes are prone to collapse. Additionally, after inserting the piles into the casing, surrounding sand is filled and the casing is pulled up, preventing groundwater contamination. Moreover, this method is particularly effective in a wide range of ground types, including gravel layers, cobble layers, and boulder layers. 【Features】 ■ Uses auger screws and donut auger machines ■ Enables reliable construction ■ Extremely effective for groundwater contamination prevention ■ Reduces the discharge of industrial waste ■ Effective in a wide range of ground types *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Double Bowling Method

We will introduce a foundation pile installation method that can be carried out with low noise and low vibration.

This technology is a foundation pile embedding method that demonstrates its effectiveness in unstable ground, such as gravel layers in the intermediate layer. First, a large auger screw is used for the first excavation based on the pile diameter, while simultaneously injecting cement milk and mixing it to solidify the excavation hole. After allowing some time for solidification, a second excavation is performed, and root-fixing milk and surrounding stabilizing liquid are injected to embed the pile. 【Features】 ■ Effective in unstable ground ■ Increased bearing capacity ■ Can be constructed with low noise and low vibration *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rock Auger Method

Low vibration and low noise! It enables reliable construction with high excavation efficiency and very good construction accuracy.

We would like to introduce the "Rock Auger Method." The technical capabilities of the "Rock Auger" have significantly improved in recent years, and as a result, the range of applicable construction methods has also expanded greatly. By using a casing that rotates in the opposite direction on the outside, our company can ensure reliable construction with high excavation efficiency and very good construction accuracy. There are a wide range of applicable construction examples, so please feel free to contact us for more details. 【Features】 ■ Can be constructed with high excavation efficiency and very good construction accuracy ■ Applicable to most ground conditions, including gravel layers, cobble layers, boulder layers, and bedrock layers ■ Low vibration ■ Low noise *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Enabling high precision and short construction time! Column and beam precast concrete component method.

Achieve a variety of expressions such as stone finish, tile finish, and paint finish! Complex shapes that are difficult with conventional formwork are possible with steel formwork!

The "Column and Beam PCa Construction Method" is a technique that involves assembling precast concrete (PCa) components manufactured in a factory at the construction site. This method utilizes high-quality and high-precision components, enabling construction periods that cannot be achieved with traditional methods. Steel formwork allows for complex shapes that are difficult to achieve with conventional formwork. It also enables a variety of finishes, such as stone, tile, and paint. 【Features】 - Enables short construction periods! - High quality, high precision, and high design capability - Only assembly is required on-site, addressing labor-saving and skilled labor shortages - Resource-saving through the elimination of plywood formwork and reduction of construction waste 【Example Plans】 - Beam panel zone joint type - Beam center joint type - Panel zone PCa type *For more details, please download the PDF or feel free to contact us.

  • Housing structure technology/long-term superior housing technology

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Aramid rod insertion joint replacement reinforcement method "B-Star Method"

Enhance the out-of-plane bending strength and toughness of brick walls without changing their appearance!

The "B-Star Method" is a patented technique that enhances the out-of-plane bending strength and toughness of brick walls without altering their appearance by embedding high-strength, high-durability aramid rods into the joints of existing brick structures and replacing part of the joint with a reinforcing joint material. Aramid rods possess more than five times the tensile strength of ordinary steel materials, and by inserting straight rods into horizontal joints and U-shaped rods into vertical joints, the seismic resistance of the brick wall is improved. Since the construction is limited to the joint areas, it does not affect the design of the brick wall. 【Features】 ■ Uses lightweight reinforcement materials, resulting in no increase in weight after reinforcement ■ Prevents the collapse of brick walls due to aramid rods even after cracking occurs ■ Limited to joint area construction, thus not affecting the design of the brick wall ■ Implemented through responsible construction by members of the Brick Structure Seismic Reinforcement Research Association *For more details, please refer to the PDF document or feel free to contact us.

  • 2020-06-22_16h37_30.png
  • 2020-06-22_16h39_47.png
  • 2020-06-22_16h38_22.png
  • 2020-06-22_16h39_05.png
  • RIMG0004.jpg
  • P5138395.JPG
  • IMGP0019.JPG
  • RIMG0062.jpg
  • P5228618.JPG
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration