Construction method Product List and Ranking from 1597 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 日本海洋サービス 大阪支店 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 Temporary bridge temporary pier cable-stayed construction method "LIBRA Method" 横山基礎工事

Construction method Product List

1621~1635 item / All 4237 items

Displayed results

Asbestos removal method "AG-J System"

By incorporating the negative pressure wet removal method, we have ensured safety for the surrounding environment!

The "AG-J System" is an asbestos removal method that completely prevents the leakage of asbestos dust to the outside. To achieve this, the work site is completely isolated and sealed, and then a high-performance dust removal machine creates a negative pressure inside. After creating such a work environment, a special chemical is applied to the asbestos to be removed, keeping it wet to prevent dust from becoming airborne during the work. Workers wear protective masks and specialized protective clothing to ensure safety. 【Work Procedure】 ■Preparation ■Site Entry ■Specialized Protection ■Installation of Specialized Equipment ■Removal Work ■Inspection and Area Clearance, Spraying of Covering Agent on Removal Surface ■Cleanup, Cleaning, Final Disposal, Dismantling of Scaffolding, and Removal after Cleaning *For more details, please refer to the PDF materials or feel free to contact us.

  • 2020-06-23_09h56_30.png
  • 2020-06-23_09h57_00.png
  • 2020-06-23_09h57_13.png
  • 2020-06-23_09h57_27.png
  • 2020-06-23_09h57_45.png
  • 2020-06-23_09h58_09.png
  • Renovation and repair methods
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Liquefaction countermeasure method "Land Guard"

We will introduce construction methods that can mitigate damage even if liquefaction occurs.

"Land Guard" is fundamentally a structural countermeasure method that suppresses ground deformation by enclosing the building foundation ground in a frame shape with a continuous underground wall. It is suitable for soft ground measures, seismic retrofitting, and liquefaction countermeasures. Additionally, our company also offers "Multi Guard," a standalone method for soft ground measures. [Features] ■ Fundamentally a structural countermeasure method ■ Suppresses ground deformation by enclosing the building foundation ground in a frame shape with a continuous underground wall ■ Suitable for soft ground measures, seismic retrofitting, and liquefaction countermeasures *For more details, please refer to the external link page or feel free to contact us.

  • Ground foundation construction method
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hangzhou Advanced Power Chucking Method

A new method that changes the common understanding of existing pile extraction (pile pulling) construction!

The "Pile Tip Power Chucking (PG) Method" is a technique for lifting existing piles while they are encased in a casing. Since the entire existing pile is removed while being enveloped, it is possible to reliably remove piles that are bent, damaged, or have unconnected joints. Additionally, during the lifting process, a filler material is injected into the pile hole while lifting, allowing for simultaneous pile removal and filling. 【Advantages】 ■ Safe and reliable removal of existing piles ■ Reliable filling from the deepest part of the pile hole *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Anti-slip construction method "Kezuru Method"

Revolutionary new method for road surface anti-slip.

The "Kezuru Method" is a construction technique that allows for work on existing asphalt and concrete pavement surfaces that are already solidified. Using a special tool called the Kezuru Bit (patented), it excavates circular grooves as a slip prevention measure. Since it is applied to existing pavement, there is no curing period after construction, allowing for immediate reopening, which means it can be executed without disrupting operating stores or factories. Additionally, it has become possible to work in narrow spaces and on steep slopes (25%) where large machinery could not be used before. [Comparison with Conventional Methods] - Work can be done on solid surfaces - Applicable to asphalt - Expanded range of application - Same effect from any direction - No curing period after construction - Kezuru Method × Ring *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Road construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Paving construction cleaning agent "Kireizer"

Cleanly solve on-site dirt issues! A cleaning agent that removes pavement tire marks, rust, oil stains, and emulsion stains.

We would like to introduce our cleaning agent for paving work, "Kireizer." It effectively removes tire marks, rust, oil stains, and emulsion stains from pavement, providing a clean solution to dirt problems on site. We offer "Kireizer S," which is suitable for general pavement dirt (tire marks, rust, oil stains), and "Kireizer E," which is ideal for stubborn oil stains such as asphalt emulsions and machine oil. 【Product Lineup】 ■ Kireizer S - For general pavement dirt (tire marks, rust, oil stains) ■ Kireizer E - For stubborn oil stains such as asphalt emulsions and machine oil *For more details, please refer to the PDF document or feel free to contact us.

  • Safety and consumables
  • Paving Materials
  • Exterior and paving materials <General>

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Dump truck equipped with a measuring device "Scale Dump"

Lightweight operation is possible while driving at low speeds (5-8 km/h)! Achieving safe and efficient loading and transportation.

The "Scale Dump" is a dump truck equipped with a cargo weighing device. The measurement error is less than 5%. Unlike volume measurement, it is not affected by the density or shape of the object, allowing for weighing while driving at low speeds (5-8 km/h). By directly measuring the loaded weight while loading, it enables safe and efficient loading and transportation. 【Features】 ■ Unlike volume measurement, it is not affected by the density or shape of the object ■ Measurement error is less than 5% ■ Weighing is possible while driving at low speeds (5-8 km/h) ■ The driver can check the weight of the loaded cargo measured by the load cell from the driver's seat, while the loading staff can sequentially confirm it on an external display *For more details, please refer to the PDF document or feel free to contact us.

  • Exterior and paving materials <General>
  • Transport machinery
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Dismantling Adhesive Technology Utilization: SFRC Pavement Removal Method

Even with strongly bonded SFRC pavement, it is possible to remove the pavement quietly without damaging the steel deck.

We would like to introduce the "SFRC Pavement Removal Method" using disassembly adhesive technology. While maintaining its function as an adhesive, it is possible to easily peel off the SFRC pavement by heating the steel deck plate above a certain temperature. There is no need to scrape it off with heavy machinery, allowing for quiet construction. Additionally, no special qualifications are required, and the procedure is simple, making it accessible for anyone to carry out. 【Features】 ■ No load on the structure ■ Can be detached without damaging the steel deck plate ■ SFRC pavement can be removed with low noise ■ Easy disassembly ■ No special qualifications required, and the procedure is simple *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

MONO jointing method

Weldless joint method for wall-type precast connections

The MONO joint method is designed for the lead direct joints of PCa walls in buildings with five stories or fewer made of wall-type precast (PCa) reinforced concrete. It is a welding-free joint method that uses hoop-shaped rebar instead of the conventional joint method that involves flaring welds for the joining bars. Instead of flaring welds, it simply involves bundling oval-shaped hoop bars, which reduces labor in the process. Additionally, since the work does not require special skills, it can also address the issue of skilled labor shortages. 【Features】 ■ Labor-saving ■ Improved quality ■ Shortened process *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Vertical Wave Dissipation Method "Warlock"

Efficiently demonstrating wave dissipation functions in the inner sea, including wave-dissipating revetments, wave-dissipating walls, wave-dissipating breakwaters, and wave-dissipating structures!

"WARLOCK" is a vertical wave-dissipating method that helps reduce reflected waves and overtopping as a wave-dissipating structure in harbors, inland seas, and bays. Structures built with this product have wave-dissipating functions integrated into the embankment itself, eliminating the need for separate wave-dissipating works, making it cost-effective, and it exhibits wave-dissipating effects simultaneously with embankment construction. Additionally, the construction is easy, and once completed, it presents a beautiful landscape with hexagonal holes arranged in an orderly manner. [Applications] ■ Riverbanks ■ Riverbanks, loading areas, and jetties ■ Breakwaters and permeable embankments ■ Wave-dissipating works *For more details, please download the PDF or feel free to contact us.

  • Various blocks

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sloped embankment wave dissipation method "Warlock R type"

A block specifically designed for breakwaters developed based on Warlock's wave dissipation theory.

The "Warlock R-type" is a wave-dissipating method designed to stabilize a sloped embankment by tilting the body from vertical to a 3:1 slope, thereby reducing the soil pressure of the backfill. This design allows for a relatively lightweight and stable structure. The soil pressure coefficient for the 3:1 sloped wall is reduced to about 60% compared to a vertical wall. As a result, the required weight of the embankment can be reduced by approximately 40%, making it possible to create a more economical cross-section. 【Features】 ■ The main body of the revetment dissipates waves, eliminating the need for separate wave-dissipating structures, resulting in an economical cross-section. ■ The wave-dissipating function is supported by academic evidence, providing excellent wave-dissipation effects. ■ Effective in reducing overtopping. ■ Prevents scour by reducing reflected waves. ■ The sloped design of the embankment reduces soil pressure, making it economical, among other benefits. *For more details, please download the PDF or feel free to contact us.

  • Various blocks

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Post-Removal Method "OK Method"

We can extract any type of pile from the tip! Choose from three types of pile extraction methods tailored to the site.

The "OK Method" is a pile extraction technique that forcibly chucks the tip of the pile using a special casing, allowing for the extraction of existing piles from the tip. It enables proper backfilling simultaneously with the extraction of the pile. As it is a noiseless and vibration-free method, it can be implemented in various locations, including urban areas, office districts, and residential areas. 【Features】 ■ Safe construction ■ Smooth operation ■ Short construction period ■ Noiseless and vibration-free work *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Special Construction Method
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

GRID WALL(R) method

Measures against mountain retention, stagnant water, and liquefaction! More economical foundation pile design is possible!

This is a proposal for liquefaction countermeasures that can be adapted to narrow sites using the GRID WALL(R) method combined with foundation piles. With advanced liquefaction countermeasures, it is now possible to design more economical foundation piles that take into account "friction resistance" and "horizontal resistance." The construction machine has a simple structure without protrusions, allowing it to operate very close to the boundary. 【Features】 ■ Achieves both cost reduction and improved safety ■ Highly effective in suppressing wave motion during earthquakes ■ Can be used for earth retention ■ Prevents water leakage ■ Reduces ground deformation and suppresses liquefaction *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Soil Improvement Method "Solid Cube Method"

Significant reduction in excavation time is possible with the minimum necessary excavation volume!

The "Solid Cube Method" is a slurry-type mechanical mixing block ground improvement method. Applicable structures include foundations for buildings and works, as well as temporary structures such as retaining walls, and the applicable ground consists of sandy soil, clayey soil, and loam. Additionally, information from various sensors attached to the bucket mixer and arm displays the bucket's movement trajectory, mixing count, and electrical resistivity value in real-time on the operator's monitor. 【Features】 ■ Efficient excavation method ■ Dedicated bucket mixer with anti-circular mixing function ■ Construction management device that visualizes the interior of the improved body ■ Specimen production using an uncured sample collector ■ Indoor mixing tests with mixed soil, etc. *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Columnar Ground Improvement Method "MRC Method"

Compact, high-performance machines provide high-quality enhancements!

The "MRC Method" is a columnar ground improvement technique that addresses various issues that may arise during excavation work in areas affected by groundwater or where soft ground is deposited. By using compact construction machinery, it minimizes the impact on the local community while providing high-quality ground improvement. 【Features】 ■ Contribution to the community brought by compactness ■ Improvement of structural integrity brought by excellent applicability ■ Expansion of application range and utilization brought by high-performance machinery ■ Reduction of the burden on the local community brought by low costs ■ Improvement of construction safety brought by high reliability *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Achievements: FY 2018, Fuchu City, Hiroshima Prefecture

Excellent durability against repeated loads such as earthquakes! Introducing our achievements in Fuchu City, Hiroshima Prefecture.

We would like to introduce the construction achievements of the DK Bond Method. The implementation of this method closes crack openings and prevents loosening of the bedrock due to weathering, while also dispersing the concentrated stress in the area. This results in excellent durability against repeated loads such as earthquakes and demonstrates a high effectiveness in preventing falling rocks. 【Construction Achievements】 ■Project Number: 3559 ■Client: Hiroshima Prefectural Eastern Construction Office ■Main Contractor: Amano Kiko Co., Ltd. ■Project Name: Fuchu Up and Down Line Road Disaster Prevention Work (Fuchihara Section) ■Prefecture: Hiroshima ■Construction Location: Kawamachi, Fuchu City ■Start Date: June 2018 ■End Date: September 2018 *For more details, please refer to the PDF document or feel free to contact us.

  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration