Construction method Product List and Ranking from 1597 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 エスケー化研 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Gradient Construction Method for Residential Exterior Walls "KF Gradient Method" KFケミカル
  5. 5 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック

Construction method Product List

1276~1290 item / All 4241 items

Displayed results

Coating-type lining method "Zic Resin JE-3PM Method"

To concrete facility areas that are in a relatively mild (pH 2 or higher) corrosive environment.

The "Zick Resin JE-3PM Method" is an epoxy resin-based anti-corrosion coating method designed for use in relatively mild concrete corrosion environments, offering excellent functionality as an anti-corrosion design specification. Thanks to its superior substrate adjustment capabilities, it forms a protective layer with uniform thickness. 【Features】 - Exhibits stable adhesion on both dry and wet surfaces, unaffected by the moisture content of the concrete. - Forms a protective layer with uniform thickness due to excellent substrate adjustment capabilities. - Provides good protective functionality even in acidic environments with a pH of 2 or higher, or in alkaline environments. *For more details, please refer to the PDF document or feel free to contact us.*

  • Sewerage facilities
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Coating Type Lining Method "Zic Resin JE-PM1 Primer Method"

Standard construction method using commonly applied epoxy resin! Method covered by cooperation guarantee.

The "Zick Resin JE-PM1 Primer Method" is an epoxy resin-based anti-corrosion coating method with excellent protective functions, designed as a corrosion protection specification for concrete exposed to acidic corrosive environments. The fiberglass-reinforced anti-corrosion coating layer forms a strong and homogeneous protective layer, effectively isolating the concrete from corrosive environments. 【Features】 ■ Excellent adhesion stability with concrete, maintaining stable adhesive strength over a long period ■ The fiberglass-reinforced anti-corrosion coating layer forms a strong and homogeneous protective layer, effectively isolating the concrete from corrosive environments ■ Sufficient corrosion resistance for the harsh corrosive environments of sewage-related facilities *For more details, please refer to the PDF document or feel free to contact us.

  • Sewerage facilities
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Repair and reinforcement work for concrete structures

Introducing repair and reinforcement work for concrete structures, such as cross-section repair work and water-stopping work!

At New Tech Co., Ltd., a comprehensive consultant for concrete, we undertake repair and reinforcement work for concrete structures. We carry out repair and reinforcement work using the cross-section repair mortar "Naoshitaru Series," as well as fiber reinforcement work and tile lifting repair work. Our company provides a consistent service as a "comprehensive hospital for concrete," offering various concrete tests and mix design (building a healthy body), investigation and diagnosis of concrete structures (from interviews to various precise inspections and diagnoses), concrete repair design (prescriptions), and repair and reinforcement work (administration of medicine and surgery). 【Repair and Reinforcement Work for Concrete Structures】 ■ Cross-section repair work (Naoshitaru method and others) ■ Water stop work (Asstop method) ■ Crack repair work ■ Cover thickness improvement work (Naoshitaru method) ■ Fiber reinforcement work *For more details, please refer to the PDF materials or feel free to contact us.

  • Concrete construction
  • Reinforcement and repair materials
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Kekomu Segment Method"

Significant reduction in on-site construction period is possible! This is a construction method that achieves improved workability and construction accuracy.

The "Kekomu Segment Method" uses a full-circle rotating press-in machine to underwater press-in excavate a concrete composite pipe covered with outer steel plates, constructing a vertical shaft to a specified depth. Unlike conventional methods, after construction, it remains as a manhole structure with part of it left intact, allowing for the omission of on-site pouring work. Additionally, the connection of the segments is designed to be flexible, accommodating seismic level 2. 【Features】 ■ Work inside the vertical shaft to construct the manhole can be omitted by building an inner frame ■ Process time reduced to one-third ■ Complies with seismic level 2 ■ Improved environmental performance, constructability, and construction accuracy *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

ESP Civil Engineering Method

Human labor construction is possible! Due to the independent bubble structure, it is difficult to absorb, and there is no change in material properties.

The "ESP Civil Engineering Method" is a construction method that, due to its lightweight nature, does not require large construction machinery and allows for manual and rapid construction. When stacked, it forms a self-supporting surface, and because its Poisson's ratio is close to 0, it can be simplified from structures like retaining walls to protective walls. The characteristics of the independent bubble foam material provide excellent cushioning, effectively reducing impact and vibration. 【Features】 ■ Reduction of maintenance costs ■ Shortening of construction period ■ Savings on land use ■ Reduction of excavation volume ■ Easy on-site processing *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Lightweight Greening Method "Super Soil Ren Method"

A green oasis that refreshes the city! We will introduce a construction method that contributes to CO2 reduction through rooftop insulation.

The "Super Soil Ren Method" is a lightweight greening technique that significantly improves rooftop insulation effectiveness. There is a surface temperature difference of nearly 30°C between the greening area and the exposed area. This enhances heating and cooling efficiency, contributing to energy conservation and heat island mitigation. When calculating the annual heating and cooling load, a reduction effect of approximately 27% for cooling and about 41% for heating can be expected. 【Features】 ■ Significantly improves rooftop insulation effectiveness ■ Nearly 30°C surface temperature difference between the greening area and the exposed area ■ Enhances heating and cooling efficiency, effective for energy conservation and heat island mitigation ■ High insulation effectiveness leads to savings on heating and cooling costs, contributing to environmental conservation *For more details, please refer to the PDF materials or feel free to contact us.

  • Heat insulation and heat shielding methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Floor finish "Polished Concrete"

Providing the natural texture of "stone," a product of nature.

"Polished concrete" is a flooring finish that showcases the cross-section of the stone (aggregate) by "grinding" and "polishing" a light-colored inorganic concrete surface, resulting in a natural texture and a durable, shiny floor surface. There are two types available: the natural "Super Floor" and the infinitely designable "Terrazzo," making it possible to create various spaces for use in showrooms and other commercial facilities. [Features] ■ "Grinding" and "polishing" the concrete surface ■ Natural texture ■ Durable floor surface *For more details, please download the PDF or feel free to contact us.

  • Interior construction
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hydraulic Precast Pile Boring Method "SPACE21 Method"

A foundation pile method that enables construction under harsh conditions with a lightweight and compact machine!

The "SPACE21 Method" is a hydraulic full-rotation prefabricated pile excavation method developed for efficiently installing prefabricated piles (steel pipe piles and concrete piles) under conditions such as low spaces and narrow locations. Since it does not require a leader for conventional pile drivers, it significantly improves headroom loss and is highly effective for short-length splicing pile installation in low spaces. As of December 2023, there have already been over 520 construction achievements, including those for public institutions. 【Features】 ■ Significantly improved workability in low spaces ■ Advantageous for construction in narrow yards ■ Easily movable and can be brought to underground excavation bottoms ■ Low vibration and low noise construction ■ Capable of various close-proximity construction, etc. *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

From drone roof inspection to construction: Maintenance for factories and warehouses.

We will conduct a roof inspection with a drone without climbing onto the roof and handle the construction as well.

【From Drone Roof Inspection to Construction】Maintenance for Factories and Warehouses We conduct roof inspections using drones without climbing onto the roof and take care of the construction as well. ■ Roof Inspection by Drone ○ Inspection Details We will take photos of the entire building and get close to the roof. If necessary, you can specify the areas to be photographed. The inspected photos will be compiled and reported in a designated format. ○ Inspection Process - Request for inspection - Preliminary survey and hearing - Roof inspection using a drone (approximately 1 hour) - Submission of inspection report - Submission of construction estimate The inspection fee will be zero if you request the renovation work as well.

  • Roof and gutter construction
  • Non-destructive testing

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Information about the rehabilitation method "RMI Method"

We will rehabilitate existing manholes with reduced load-bearing capacity.

The "RMI Method" is a rehabilitation method using resin manholes. The inserted resin manhole ensures self-supporting strength on its own. It has acid resistance equivalent to newly installed resin manholes. Additionally, it is adaptable to seismic levels 1 and 2, and it is a method that does not require special technology or machinery. 【Features】 ■ Workability ■ Acid resistance ■ Load capacity ■ Water tightness ■ Seismic resistance *For more details, please download the PDF or feel free to contact us.

  • Other earthworks, foundation works, and exterior floors
  • Inspection hatches, manhole covers, and ditch covers
  • Manhole body

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Heat insulation method using the heat-insulating material "Reflectix."

Achieved a WBGT value of less than 28°C even in midsummer without air conditioning. Also blocks cold radiant heat in winter. Suitable for new construction and renovations.

Our company offers a heat insulation material called "Reflectix," which achieves a heat reflectance rate of 99%. We implement a "heat insulation method" for roofs and walls of factories and warehouses. By cutting radiant heat, it is possible to significantly improve the indoor environment and reduce energy costs. In summer, it blocks heat rays from the sun, allowing air conditioning to lower room temperature with lower output. In winter, it blocks cold radiant heat from outside and reflects indoor heat, preventing it from escaping. 【Features】 ■ Effective against condensation ■ Immediate operation of machinery even on winter mornings ■ Reduces indoor temperature differences (Contributes to reducing employee burden and improving precision in processing) ■ Energy-saving simulations can be conducted in advance *For more details, please refer to the materials. Feel free to contact us with any inquiries.

  • Heat shielding sheet

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reinforcement work for existing rockfall protection fence "Reinforced Fence"

Reuse the existing rockfall protection fence as is to improve performance.

The "Reinforced Fence" is a method for strengthening existing rockfall protection fences that lack durability and height. It can increase the height of the protection fence up to a maximum of 6.0 meters and enhance the corresponding rockfall energy up to a maximum of 200 kJ. ■ Reinforcement of existing rockfall protection fences ■ Height increased up to a maximum of 6.0 meters ■ Rockfall energy increased up to a maximum of 200 kJ Ministry of Land, Infrastructure, Transport and Tourism New Technology Information System (NETIS) Registration Number: HR-110028-V *Registration period has ended *For more details, please download the PDF or feel free to contact us.

  • Road construction
  • Railway Construction
  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete Pile "ONEPILE・HI-ONEPILE"

This concrete pile is suitable not only for impact construction methods but also for inner excavation methods!

"ONEPILE・HI-ONEPILE" is a high-strength PC pile jointly developed by Chichibu Onoda Co., Ltd. and Japan Concrete Industry Co., Ltd. It has high strength, can withstand significant impact forces, and easily penetrates hard intermediate layers. Additionally, due to the introduction of prestress, it is possible to prevent the occurrence of cracks caused by bending tensile forces. 【Features】 ■ Applicable to all construction methods ■ High strength ■ Introduction of prestress ■ Prevention of crack occurrence *For more details, please download the PDF or feel free to contact us.

  • Prefabricated Concrete Products

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Relative Stirring Type Deep Mixing Method "DCS Method"

A deep mixing ground improvement construction system that achieves excellent quality!

The "DCS Method" is a cement-based deep mixing ground improvement construction system that creates DCS columns (soil cement columns). By injecting a solidifying agent (cement-based slurry) into the ground and mixing the soil, DCS columns (soil cement columns) are formed. The solidifying agent discharged from the DCS mixing blades (frame-type composite relative mixing blades) is effectively mixed and stirred with various soils, resulting in DCS columns that maintain excellent quality. 【Features】 ■ Large diameter columns of Φ2,000mm ■ Capable of reaching depths of up to 50m ■ Excellent mixing power through relative mixing ■ Outstanding capability to handle hard ground *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Mid-level mixed processing method "WILL Method (Slurry Oscillation Agitation Method)"

Construction of high-quality improved bodies! A mid-level mixed treatment method that pursues high quality, safety, and cost-effectiveness.

The "WILL Method (Slurry Oscillation Mixing Method)" is a construction technique that injects slurry-like solidifying agents and improvement materials through a special mixing blade attached to the tip of a backhoe-type base machine, forcibly mixing the solidifying agents with the in-situ soil to form a stable improved body. By using two types of response screw-type mixing blades, it can accommodate not only weak, viscous soil layers but also compact sandy soil and gravel layers with an N value exceeding 30. Additionally, by selecting the appropriate base machine, it can handle medium-depth improvements of up to approximately 13 meters. 【Features】 ■ Construction of high-quality improved bodies ■ High excavation performance ■ Reduced environmental impact ■ High mobility and safety ■ Reliable quality control *For more details, please refer to the PDF document or feel free to contact us.

  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration