FCR Liner Method (for Different Diameters) [FCR Method Association]
Repairing the hidden pipe with different diameters on the left and right as it is.
Due to the expansion of single-track lines to double-track lines and the construction of roads parallel to the railway, numerous railway drainage systems (such as inverted siphons and inverted pipes) with different diameters on the left and right sides have been installed. In conventional methods, the lining was adjusted to fit the smaller diameter, and mortar was injected into the gaps to complete the work. We have developed the "FCR Liner Method (for different diameters)" that allows for repairs of inverted siphons with different diameters without changing their original size. *For more details, please download the PDF or feel free to contact us.
- Company:FCR
- Price:Other