Construction method Product List and Ranking from 1578 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Aug 12, 2026~Sep 08, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Aug 12, 2026~Sep 08, 2026
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. SIKA JAPAN Ltd. Tokyo//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 キシムラ Kanagawa//Service Industry
  5. 5 三晃金属工業 Tokyo//General contractors and subcontractors

Construction method Product ranking

Last Updated: Aggregation Period:Aug 12, 2026~Sep 08, 2026
This ranking is based on the number of page views on our site.

  1. External insulation method using roof mats for dry construction on flat roofs.
  2. 【物理的損傷を抑制】防砂シート引込軽減工法 キシムラ
  3. 【斜面安定化工法】レッドゾーン解除実績有【景観配慮・コスト縮減】 ダイカ
  4. 4 Improving work efficiency for river bridge pier repair and reinforcement! Optional depth anchoring type temporary cofferdam method. 第一建設工業 本社・新潟支店
  5. 5 Rooftop greening system - Rooftop greening without the need for irrigation - Evergreen Kiri grass bag method 緑化計画研究所

Construction method Product List

961~990 item / All 4360 items

Displayed results

Iron powder bubble method

Improvement effect and excellent construction efficiency! Can be implemented in narrow spaces and is an environmentally friendly soil purification method.

The "Iron Powder Bubble Method" is a soil purification technique that encapsulates iron powder in bubbles using compact plant equipment, ensuring reliable delivery of the liquid underground. The ball bearing effect of the bubbles reduces drilling resistance. The amount of water used is about one-fifteenth of that used in conventional methods. 【Features】 ■ Excellent improvement effect ■ Good construction efficiency ■ Environmentally friendly ■ Usable in narrow spaces *For more details, please refer to the catalog or feel free to contact us.

  • Ground improvement
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Mechanical stirring method

Soil purification method that allows for the delivery of bio-Fenton and other treatments! Can be implemented even in confined spaces.

The "Mechanical Agitation Method" is a soil purification technique that allows for the delivery of bio-nutrients and Fenton (catalysts and oxidants) among others. It can be implemented in compact plant facilities, making it suitable for narrow spaces. 【Features】 ■ Ensures reliable agitation and mixing with a diameter of 800 to 1000 mm ■ Ground reinforcement (foundation) is possible by delivering solidifying agents *For more details, please refer to the catalog or feel free to contact us.

  • Ground improvement
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

HiroWork Kmighty Method

NETIS registration! The "full-length extraction method" pulls out existing piles with ultra-low vibration and ultra-low noise.

By combining a specially developed flexible casing and an auger drilling motor to generate rotational force with a high-pressure water jet, this "full-length extraction method" releases the friction between existing piles and the ground, allowing for the extraction of existing piles with ultra-low vibration and ultra-low noise. 【Features】 1. NETIS registration No. KT-120066-A 2. Ultra-low vibration and ultra-low noise 3. Compatible with inclined piles 4. Suitable for close proximity and narrow space construction 5. High work efficiency for various pile types with high-pressure water jet 6. Step construction is possible 7. Reduction of work time 8. Safety during operation For more details, please refer to the catalog or feel free to contact us.

  • Civil Engineering Method
  • Pile and foundation work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

RBP wall construction method

[NETIS Registration] A cut slope reinforcement construction method that enables safe construction by combining reverse bolt panel version and rebar insertion work.

The "RBP Wall Method" combines reverse bolt paneling and rebar insertion work to prevent collapse through the stabilization of cut slopes and natural slopes. It is applicable in areas with low ground stress, places with limited space, and at cut locations adjacent to structures, for purposes such as road widening, land development, steep slope countermeasures, fall prevention measures, and slope stabilization works. Excavation of the ground is performed using a sloping method that cuts down from the top of the slope while securing it with reverse bolt panels. For more details, please refer to the catalog or feel free to contact us.

  • Civil Engineering Method
  • Earthquake-resistant construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

PJG method

NETIS registration! Ultra-high pressure injection mixing method that allows for high-speed construction and adjustment of the improvement range.

In recent jet grouting methods, there has been a demand for high-speed construction on site. Additionally, the jet grouting method always faces issues such as the use of large amounts of hardening materials and the discharge of significant amounts of slurry. The concept of the PJG method allows for the adjustment of the improvement range in necessary areas, leading to a reduction in the amount of hardening materials used and the volume of slurry discharged. By enabling even faster construction, we have achieved further reductions in the use of hardening materials and slurry volume. *For more details, please feel free to contact us.*

  • Ground improvement
  • Civil Engineering Method
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Zypex method

The durability of concrete has dramatically improved! [NETIS registered] We are exploring new possibilities for concrete that continues to regenerate semi-permanently.

Zypex is a concrete modification material that densifies the structure by promoting the growth of cement crystals in defects such as voids and cracks within the concrete, thereby blocking deterioration factors like water and enhancing waterproof performance to improve the durability of the structure. ■Mechanism of Concrete Densification■ The mechanism of densification by Zypex involves mixing concentrated powder with a specified amount of clean water to create a paste, which is then applied or sprayed onto the surface of the concrete. This allows catalytic compounds to penetrate deep into the concrete, promoting the growth of new cement crystals at the capillary voids and crack interfaces, thereby densifying the concrete structure itself. The depth of modification through crystallization can vary depending on the concrete conditions, but it can extend to over 30 cm in a moist environment.

  • Waterproofing work
  • Renovation and repair methods
  • Waterproofing Agent
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

High Grip Grout Method

[NETIS Registration] Chemical injection method that reduces injection loss during construction.

The High Grip Grout Method is a grouting technique that enhances the prevention of chemical leakage from drilled holes using ground packers, ensures a large source of chemical penetration with special sealing materials, and improves injection efficiency through a centralized management system for chemical injection. *NETIS Registered Technology: CB-180028-A [Ground Packers] Ground packers are designed with a structure that prevents the leakage of filling materials (a double structure of fabric and rubber), which suppresses shrinkage after the expansion of the ground packer and enhances the adhesion between the drilled hole and the ground packer. This prevents the leakage of chemicals from the drilled hole. [Special Sealing Materials] The sealing materials use a special substance that fluidizes when reacting with chemicals, protecting the hole walls during drilling and ensuring a large penetration area during chemical injection. This allows for a reduction in injection pressure and the creation of a large-diameter modified body with a diameter of 2.5 meters. [Injection Management System] The system used in this method can simultaneously manage multiple chemical injection pumps (16 points). This improves the efficiency of injection and achieves cost reduction through shortened processes. *For more details, please refer to the catalog or feel free to contact us.

  • 施工手順.jpg
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SAT column method

Quickly construct columns with a safe and robust deep mixing method! High-quality columns can be created in sandy soil, clay, loam, and other ground types. *Building technology performance certification obtained.

This construction method is a mechanical mixing deep mixing treatment method that creates columnar ground improvement bodies by excavating and mixing the ground while discharging a slurry of cement-based solidifying material. It has a maximum design strength of Fc=2,500KN/m2, which is high strength, and the dedicated special mixing machine has high mixing efficiency, allowing for the creation of high-quality columns in sandy soil, clayey soil, loam, and other ground types. **Features of the SAT Column Method** - Building technology performance certification GBRC No. 18-28 - Use of a dedicated mixing machine for the SAT column method - Supports various improvement forms according to purpose, including pile type (pile arrangement, circular arrangement, lap arrangement), block type, and wall type - Thorough management system with real-time management devices to construct safe and robust columns - Capable of selecting equipment from small to large heavy machinery and related equipment to accommodate a variety of sites, including buildings, civil engineering structures, and temporary structures - Achieves low cost with a lineup of solidifying material amounts with a reduced increase factor (variation coefficient of 25%) and improvement diameters ranging from φ400 to 1600mm *For more details, please download the PDF document or feel free to contact us.*

  • SATコラム.JPG
  • SATコラム2.JPG
  • SATコラム3.JPG
  • SATコラム4.JPG
  • SATコラム5.JPG
  • Ground foundation construction method
  • Civil Engineering Method
  • Ground improvement
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Tekot pile method

Low-cost steel pipe piles suitable for small-scale housing to mid-rise buildings.

**Features of Tecot Piles** ■ Highly Reliable Piles Tecot Piles - Driven piles certified by the Minister of Land, Infrastructure, Transport and Tourism, Japan Architectural Center TACP-0355 TACP-0356 Tecot Pile SR - Driven piles certified by the Japan Architectural Comprehensive Testing Institute GBRC-10-08 ■ High Load-Bearing Capacity Adopts a tip wing diameter of 250 to 650 mm with a load-bearing coefficient α = 270 ■ Reliable Quality Control Conducts slide weight tests to confirm the load-bearing capacity of the pile tip ■ Environmentally Friendly Since it is installed by rotary penetration, construction can be done without residual soil, generating no industrial waste. ■ Low Cost In addition to standard round steel pipes, square steel pipes are also used, enabling low costs.

  • Piles, caissons, sheet piles
  • Ground foundation construction method
  • Pile and foundation work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-altitude slide construction method

It is a full casing (full rotary) method that enables work up to a depth of 4.4 meters.

We have made it possible to carry out construction that was previously impossible. - Foundation work inside the gymnasium: Previously, part of the wall had to be demolished to bring in machinery, but it is now possible to bring in equipment without altering the current state. - Foundation work along the railway: Work that requires crane booms to extend higher than the tracks is typically done at night, but since we do not use cranes, daytime work is possible. - Bridge widening and under-beam work: Heavy machinery can access the existing under-beam area, allowing vehicles to continue using the existing bridge during construction. - Work under high-voltage power lines: Construction under high-voltage power lines is also feasible.

  • Foundation construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shinbee method

Ground improvement method using soil-cement columns with thin-walled steel pipes.

■ Performance-Proven Construction Method Building Technology Performance Certification GBRC Performance Certification No. 13-04 Rev. 2 This method has been reviewed by a third-party organization, which certifies the performance of the technology. ■ High Load-Bearing Capacity and High Strength This method combines the benefits of steel pipes with stable quality and strength of columnar improvement bodies. ■ High-Quality Mixing The specialized mixer, equipped with a comb section and eight blades, provides high-quality mixing. ■ Wide Range of Soil Types This method can accommodate a wider range of soil types than typical columnar improvement methods, as the steel pipes can complement quality and strength to mitigate variations in strength due to soil type. ■ Short Construction Period Due to high surface friction and quality, it is possible to shorten the pile length compared to conventional columnar improvement methods, leading to a reduction in construction time. ■ Suitable for Narrow Sites Heavy machinery is selected based on site conditions to advance the project more efficiently.

  • Pile and foundation work
  • Ground foundation construction method
  • Ground improvement
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

For deep excavation work and cutting/removal of underground obstacles! Super Top Method.

The construction of place-driven piles in ground with boulders or bedrock, as well as deep excavation work, demonstrates its effectiveness in cutting and removing underground obstacles.

To safely carry out difficult all-casing deep drilling, maintaining high vertical accuracy while pushing in the casing and the reliability of the chuck device are key points. The RT series tubing equipment used in the Super Top method features a wedge-type chuck device and boasts one of the largest rotational torque and pull-out force in its class. Additionally, aiming for efficient and economical rock cutting, it is equipped with a casing pushing automatic control mechanism (B-CON mechanism) that can maintain the bit load at a constant value through "sequence control." The excellent workability and safety of the Super Top method with these features have been demonstrated through "technical review certification."

  • Foundation construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Soil retention material pull-out simultaneous filling GEOTETS method

Leave no gaps, allow no subsidence.

This is a method of filling a dedicated permanent grout material into the voids created underground "simultaneously with the extraction" of soil retention materials such as steel sheet piles and H-beams. By securely filling the voids, it highly suppresses subsidence and cracking of the surrounding ground. It is optimal under conditions where ground displacement is not permitted, such as near soft ground, important structures, river embankments, and soil contamination countermeasures. ◆ 20-50% cost reduction compared to leaving materials in place By reusing steel materials, there is no need for purchase, leading to significant cost savings. In disaster recovery work, the repurposing of steel allows for continuous construction, contributing to early recovery. ◆ Elimination of underground obstacles By safely removing soil retention materials that were previously left in place, future underground obstacles are eliminated. ◆ No impact on surrounding ground To immediately fill the voids and looseness of the ground during material extraction, it suppresses subsidence of the surrounding ground.

  • 着工前?.jpg
  • 充填材リーク状況?.jpg
  • 施工状況?.jpg
  • 施工完了➃.jpg
  • 土砂付着大.JPG
  • RIMG0025.JPG
  • R0098409.JPG
  • R0098365.JPG
  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

GEOTETS method

Soft ground is of course applicable, as well as various ground conditions and extraction methods!

The "GEOTETS Method" is a technology that allows for the safe extraction of steel sheet piles and other materials, avoiding residuals in proximity construction and embankments. It is a patented method for counteracting settlement when extracting various types of piles, with a proven track record including steel sheet piles, H-beams, steel pipe piles, precast piles, and wooden piles. By simultaneously filling with a dedicated filling material while extracting, it has become possible to remove materials safely without significantly affecting the surrounding ground after extraction. 【Features】 ■ 20-50% cost reduction compared to residuals ■ Elimination of underground obstacles ■ No impact on surrounding ground, similar to residuals ■ Attracting attention from river management authorities as a method that does not create water pathways ■ Underwater construction is also possible ■ A method for blocking the movement of contaminants in the field of soil contamination remediation *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Wireless Construction Method "ACEUP"

A new construction method that dramatically changes the conventional wisdom of steel frame construction!

"ACEUP" is a wireless construction method that does not use trawire or distortion correction wire. Since it allows for independent adjustment of each column, it is easy to ensure accuracy. Unlike wire construction, it enables structural work without putting stress on the columns. 【Features】 ■ Reduction of construction personnel is possible ■ Significant reduction in work time for column erection ■ Reduction in work time for beam installation is possible ■ Reduces high-altitude work and eliminates the need for dangerous distortion correction tasks *For more details, please contact us or download the catalog.

  • Special Construction Method
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Solar Mounting System D-SWAT SAMURAI Replacement Method

Roof renovation replacement method. SAMURAI's replacement and relocation can be done easily.

【D-SWAT SAMURAI Replacement Method】 The SAMURAI can be easily replaced and relocated. ■ Roof Renovation Replacement It is possible to replace the existing aging roofing material with newly installed metal roofing materials using a cover method. ■ Module Relocation Supports the relocation of modules during home expansion or renovation (e.g., from residential roof to carport). ■ Reuse & Ecology Existing modules and step bars can be reused, achieving economical and environmentally friendly construction. ■ Comprehensive Leak Prevention Measures By adopting the D-SWAT catch method, construction can be performed without making holes in the roof (excluding overlapping folded plates). *Note If the solar cell modules (SAMURAI) and step bars are reused through the SAMURAI replacement method, all existing manufacturer warranties (both free and paid) from Kyocera Corporation will become void. Please be aware of this in advance.

  • Galvanized steel sheet
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Solar Mounting System: D-SWAT EconoRoots Type R Replacement Method

Reusing existing modules is possible with the compatible catch frame! Compatible with the entire "D-SWAT" lineup.

The replacement and relocation of the "ECONOROOTS type R" has become possible with a catch. By using the compatible catch frame, it is possible to reuse existing modules and existing racks. It supports the relocation of modules during home expansions or renovations (e.g., from residential roofs to carports). 【Features】 ■ Roof renovation replacement ■ Module relocation ■ Reuse & ecology ■ Comprehensive leak prevention measures *For more details, please refer to the PDF materials or feel free to contact us.

  • Roof and gutter construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"S Catch" fitting for separator angles

It is possible to avoid interference with rebar! We can accept either materials or construction!

The "S Catch" is a bracket for separation angles of a single-sided formwork. It can slide, allowing flexibility in the position of the separator, and can avoid interference with rebar. Additionally, it eliminates the need for concurrent work with carpenters, which can shorten the construction period. 【Features】 ■ It can slide, allowing flexibility in the position of the separator ■ Eliminates concurrent work with carpenters ■ Enables shortening of the construction period ■ Eliminates the hassle of welding the separator ■ Leads to cost reduction *For more details, please refer to the PDF document or feel free to contact us.

  • Subsidiary materials
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Sumitomo Metal System Architecture"

We offer a diverse menu! We will provide proposals that make the most of the system's advantages.

"Sumikin System Architecture" is a construction method characterized by "high seismic resistance," "low cost," and "short construction period." We offer a range of buildings including the single-story standard system architecture "Tio," the freely designed single-story and two-story system architecture "Toreo," and the mid-rise system architecture "Rafitto" for 3 to 6 stories. By extensively using high-strength bolt connections, we achieve excellent seismic performance. Additionally, we respond quickly not only to statutory inspections but also to unexpected accidents. [Features] ■ High seismic performance ■ Abundant finishing materials ■ Environmentally conscious ■ Low cost and short construction period ■ Reliable maintenance *For more details, please refer to the PDF materials or feel free to contact us.

  • Systems Architecture
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Preservation technology waterproofing

We propose appropriate waterproofing methods! Preserving the value of buildings, which are quality social assets, for future generations...

It is Sugitec's mission to maintain the value of buildings, which are quality social assets, for future generations. Preserving waterproofing functionality is important from the perspective of the asset value of the building. There should be no leakage, and the required durability and water tightness must be ensured. Maintaining the image of the building is the purpose of preservation. ◎ Sugitec offers appropriate waterproofing methods ◎ 【Examples of waterproofing methods】 ■ Urethane coating waterproofing ■ PVC waterproofing ■ Vulcanized rubber sheet waterproofing ■ Asphalt waterproofing, etc. * For more details, please contact us.

  • Waterproofing work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rigid porous sound-absorbing material "Shizuka Light" product catalog

Noise control materials! Creating quiet, comfortable, and safe towns and cities! Effective for various applications!

This document is a product catalog featuring the sound-absorbing material "Shizukalite," which is a key solution for protecting living environments from the flood of various sounds. This product is composed of over 80% fine continuous bubbles and has high sound-absorbing performance equivalent to that of fiber-based sound-absorbing materials. Additionally, it excels in sound insulation, durability, and weather resistance. The Shizukalite products "Shizukalite Board" and "Shaonkyu Flex" are actively used in various applications as materials that create quiet, comfortable, and safe towns and cities, accumulating achievements and positive feedback. The catalog includes examples of installation, features and benefits, product specifications, shapes, and more. [Contents (excerpt)] ■ What is Shizukalite? ■ Shizukalite in action: case studies ■ Shizukalite Board ■ Shaonkyu Flex ■ Installation and maintenance, etc. *For more details, please refer to the PDF document or feel free to contact us.

  • Concrete wall
  • board
  • Soundproofing panels
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Anchor hardware embedded during the manufacturing stage! 'Factory Embedded Anchor Panel'

Usable for various purposes, from low-rise to super high-rise buildings. During the panel manufacturing stage, it is firmly welded and embedded into the internal reinforcement bars (rebar) of the panel!

The anchor section for attaching panels to the structural framework can be considered the heart of ensuring the seismic safety of ALC panels. The key component is the anchor hardware. The anchor hardware is firmly welded and fixed to the reinforcing bars (rebar) inside the panel during the panel manufacturing stage, resulting in what is known as a "factory-embedded anchor panel." 【Features】 Seismic safety Improved construction efficiency Effective in reducing tsunami wave forces, etc. *For more details, please refer to the PDF materials or feel free to contact us.

  • ALC
  • panel
  • Concrete block, ALC panel, extrusion molded cement board construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Stone Master Construction Achievements

Publication of construction achievements from March 1991 to December 2011!

This document is a list of construction achievements by Tack and Company, Inc. It includes details such as construction dates, site names, and construction areas. There are numerous achievements, including anti-slip treatment of marble in entrance halls, anti-slip treatment of porcelain tiles in bathrooms, and cleaning of sandstone floors. [Contents] ■ March 1991: Entrance hall of the Japan Industrial Bank Head Office (now Mizuho Bank Head Office) ■ April 1993: Entrance hall of Park Forest Akasaka ■ October 1994: Entrance of HIROSE Architectural Design Office ■ February 1995: Common areas of Maya Shinanocho No. 3 ■ July 1995: External entrance of the Canadian Embassy *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Daisan Co., Ltd. "Bike Scaffolding BX Method"

New method for residential scaffolding! The handrail-first method prevents falls and drops from the roof!

The "Bika Scaffold BX Method" is a new construction method that safely and efficiently installs fall prevention handrails from the roof using a handrail-first approach for residential scaffolding. Particularly in renovation work, the frequency of accessing the roof decreases, which helps prevent troubles such as damage to items on the roof. Additionally, the number of places where wedges need to be driven is reduced by 37.5%, which also lessens noise during construction, providing benefits to the clients. We strive to provide a sense of security to the surrounding area and to prevent troubles before they occur. 【Features】 - Prevention of damage and complaints related to items on the roof - Reduction of noise during construction - Assurance for the surrounding area during work - Prevention of fall accidents on site - Enhancement of corporate image For more details, please contact us or download the catalog.

  • Safety and consumables
  • Scaffolding and Support Materials
  • Roof and gutter construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Special Network "CONTINEWM"

Just install it on the outdoor and indoor units! It will reduce your air conditioning electricity costs.

"CONTINEWM" is a device that, when installed on outdoor and indoor units, increases the efficiency of electricity usage and reduces air conditioning running costs. It can be installed without power interruption, allowing for construction without stopping business operations. Since it does not involve any modifications, it does not affect the warranty conditions of air conditioning equipment manufacturers. This product has been implemented in over 300 locations, including publicly listed companies, in the United States and Thailand. 【Features】 ■ Improved efficiency of electricity usage ■ Reduced air conditioning running costs ■ No impact on warranty conditions of air conditioning equipment manufacturers ■ Installation without power interruption ■ Can be installed without stopping business operations *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Setter method for detachable horizontal expandable devices.

More accurate and easier installation of detachable horizontal expansion devices! A unique construction method that pursues construction efficiency.

The "Setter Method" is a unique technique that ensures the reliable integration of expansion devices and post-poured concrete. It allows for the precise placement and fixation of removable expansion device anchor bolts in the end notch of beams, enabling post-poured concrete to be solidly filled without gaps. 【Features】 ■ Easy to ensure the flatness of the pavement surface and the joint body ■ Accurate positioning of anchor bolts ■ Simple installation and removal of special formwork (Setter) ■ Easy complete pouring and verification of post-poured concrete on the underside of the joint ■ Easy application of leveling material to prevent gaps caused by concrete drying shrinkage *For more details, please download the PDF or feel free to contact us.

  • 脱着式ヨコ型伸縮装置用 セッター工法_02.jpg
  • Bridge Materials
  • Bridge Construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Small Diameter Pipe Propulsion Method "Three Pipe King (R) DRM MVP1450"

The construction pipe diameter can accommodate small diameter pipe jacking methods with PVC pipes ranging from φ150 to 250!

The "Sanguan King (R) DRM MVP1450" is a thrusting machine that can be launched in areas with many buried objects such as gas pipes and water pipes, and can only be installed in a shaft with an inner diameter of 1450 (liner 1500). If the pressure of the hydraulic unit is 21MPa or higher, it can be operated with your existing unit. 【Main Specifications】 ■ Minimum launch shaft: φ1450 (1500 liner plate) ■ Pipe type for construction: Rigid PVC pipe (adhesive spiral joint) ■ Thrusting - Thrust force: 206KN (21MPa) 294KN (30MPa) - Pull force: 140KN (21MPa) 202KN (30MPa) - Speed: -cm/min - Stroke: 1,080min, etc. *For more details, please download the PDF or feel free to contact us.

  • Drilling Machine
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Clintile Comprehensive Catalog

Highly practical non-slip flooring! Tiles that are essential for developing social infrastructure.

The rubber-insert non-slip tiles "Klintile" from Sado Island are an essential element in developing the social infrastructure that supports people's lives. They achieve double the durability of JIS standards, excellent soundproofing effects, safe and comfortable walking, and shortened construction periods. With a constant focus on high safety and practicality, we continue to develop innovative products that meet the needs of the times and supply them to society. 【Features】 ■ Safety: Hard rubber is placed on the tile surface to increase slip resistance. ■ Durability: As a precast product with a special structure, it excels in strength, wear resistance, and weather resistance. ■ Soundproofing: Cuts noise generated on indoor, above-ground, and underground floors of various buildings. ■ Walkability: Allows for stable walking without tripping when using stairs or walking on the road. 【Featured Products】 ■ Tile "Klin Non-Slip Tile" ■ Guidance tile for visually impaired individuals "Klin Guard Tile" ■ Centrifugal molded stair block "Step Block" ■ Natural stone stair stone "Klin Step Stone" ■ Artificial granite flooring material "Klin S.G. Stone" *For more details, please refer to the catalog or feel free to contact us.

  • tile
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Soil Reinforcement Method "Taille Armé Method"

Construction is possible even on relatively soft ground! A soil reinforcement method that allows for high vertical embankments.

The "Tail Arm Method" is a soil reinforcement technique that allows for high vertical embankments at a lower cost compared to traditional retaining walls. Due to the vertical embankment, the land required is minimized, enabling effective use of the site. The assembly and construction of components do not require specialized skills or techniques, as they are combinations of standard materials. All materials used are standard products manufactured at factories certified by the Japan Tail Arm Association, under strict quality control, ensuring safety on site. 【Features】 ■ Requires minimal land ■ Can be constructed in a short period ■ No special techniques needed ■ Capable of achieving high vertical embankments ■ Quality control of components is reliable *For more details, please refer to the PDF document or feel free to contact us.

  • Retaining wall
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration