1~45 item / All 227 items
Displayed results
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online1~45 item / All 227 items
The torque wrench for the "XC2 series" is a cordless hydraulic pump that is ideal for job sites where there is no power supply or where extension cords cannot reach. If the cord gets in the way in tight spaces, the pendant control can be removed, allowing the pump to be operated with a trigger. Whether at a job site or in a factory, the portability, tightening speed, and battery runtime of the XC2 enhance work efficiency. 【Features】 - Cordless, eliminating the need for extension cords and generators that produce noise and exhaust - Suitable for bolting work that requires mobility and convenience - Comes standard with a 6m detachable pendant control (CC132) - Easy-to-read 100mm glycerin-filled pressure gauge - Adjustable safety relief valve allows for setting and locking of the required pressure *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "XC2 Series" is a cordless hydraulic pump equipped with a high-performance brushless motor that enhances productivity with high flow rates and achieves durability twice that of brush motors. Being cordless eliminates the need for extension cords and generators that produce noise and exhaust. The model with a 4-liter oil capacity can be used for high-capacity applications or multiple cylinders. It is compatible with the Enerpac Connect app, allowing access to tool and work information. 【Features】 - Cordless, eliminating the need for extension cords and generators that produce noise and exhaust - Sealed oil tank design prevents leaks and allows use in any orientation - The model with a 4-liter oil capacity can be used for high-capacity applications or multiple cylinders - Compatible with the Enerpac Connect app for access to tool and work information *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe SC series is a cordless hydraulic pump that eliminates the need for extension cords and generators that produce noise and exhaust emissions. The high-performance brushless motor improves productivity with high flow rates, and its durability is twice that of brush motors, featuring a compact and lightweight design that is easy to use in tight spaces. The sealed oil tank prevents leaks and allows for use in any direction. 【Features】 ■ Cordless, eliminating the need for extension cords and generators that produce noise and exhaust ■ High-performance brushless motor enhances productivity with high flow rates ■ Durability is also twice that of brush motors ■ Compact and lightweight design makes it easy to use in tight spaces ■ Suitable for applications requiring high precision operation, such as lifting and alignment *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce the "custom and customized hydraulic units" handled by Enapak Corporation. Leveraging our extensive experience and proven track record, we respond to the diverse needs of our customers with a wealth of custom hydraulic unit manufacturing achievements. For custom products that can be configured with modular equipment, we can accommodate specifications, design, and manufacturing in a short lead time. 【Features】 ■ Abundant manufacturing experience unique to a comprehensive ultra-high pressure equipment manufacturer ■ Shortened manufacturing period through the modularization of various valves ■ Combination of digital control equipment *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe marine production facility is expected to be built in the Gulf of Mexico, positioned at a water depth of over 5,000 feet. To construct the tension leg platform, it was necessary to slide a module weighing approximately 7,000 tons into place. The "Enerpac strand jack" was used for the loading of utility, drilling, and process modules, providing a pulling force of 1,500 tons during the loading procedure. [Case Overview] ■ Client: Velard Transportation (Gulf of Mexico) ■ Product: Four HSL6500 strand jacks, 65kw hydraulic unit *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationBeluga was tasked with unloading a 1,306-ton hydrocracker from a barge and transporting it to land. Due to the weight and length of the hydrogenation cracking unit, there were no alternatives. The company utilized two "SBL1100 gantry systems" to lift the hydrocracker from the barge to a self-propelled modular trailer (SPMT). After that, the SPMT transported the hydrogenation cracking unit to the shore. 【Case Overview】 ■ Customer: Beluga Projects Logistic, CJSC (Russia) ■ Product: SBL1100 Hydraulic Gantry *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe existing Johnson Street Bridge, which has a history of 90 years, is located in the heart of Victoria, British Columbia, and was in the process of being replaced with a new bridge that will serve the community for the next 100 years. The 1,100-ton bascule bridge box is composed of steel and concrete caissons and needed to be precisely lowered onto 16 large piers. Therefore, we provided 32 "CLSG high-tonnage hydraulic cylinders" and 3 "EVO synchronized lift systems." All three systems are networked, allowing one operator to control all 32 points from a master control user interface. By combining the system with the bar lowering method, the company improved accuracy, productivity, and efficiency, completing the lowering and leveling of the caissons in just three business days. *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationLASO Transportes AS, a large lift and transport specialist based in Portugal, used a combination of the "Enerpac SBL500 telescopic hydraulic gantry" and side shift to accurately position two presses weighing up to 160 tons. At the new factory location, each press was slid into place and rotated on a turntable to face the correct direction for lifting. The presses needed to be placed on a reinforced concrete platform that would support each press and provide a level surface. The company used the "SBL500 gantry" and side shift unit to lift the presses and align them with the platform. "We were able to maneuver the presses in three dimensions using the Enerpac side shift. Without it, accurately positioning the presses would have been very difficult," was the feedback received. *For more details, please refer to the PDF document or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationMinimizing the time that State Route 266 is closed was a primary objective during the reconstruction of the bridge over the Holbrook Canal. The new bridge was initially used as a detour while the defective bridge was being demolished, and once the old bridge was taken down, the new bridge needed to be slid into place at the original bridge's location. To slide the new bridge into its designated position, a lateral bridge sliding method was employed. We provided a hydraulic solution that allowed the new 44.5-foot bridge structure to be pushed into place using the lateral sliding method with PTFE slide elements. We supplied two "RR Series double-acting hydraulic cylinders," each equipped with its own unique "ZU Series hydraulic pump" and integrated pendant control. The pendant control enabled the operator to maintain individual control and manage any misalignment of the bridge structure between the abutments or recovery from wedging. *For more details, please refer to the PDF document or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationBard Engineering GmbH, a wind turbine manufacturer, has developed a unique concept for the foundations of wind turbines. The mast is placed on a support beam located above three main piles that are above the water surface. Our "Synchronous Hydraulic Lifting System" is used to support offshore wind turbines with impressive precision and timing. The installation process was controlled using our computer system, which utilizes stroke sensors and inclinometers. Once the support column is level, it is secured with a 5-meter-high concrete casing around each pile, and concrete is poured into the cavity to create a 13 cm thick ring on the walls of the column and piles. [Case Overview] ■ Client: Bard Engineering GmbH *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe construction of offshore highways presents many challenges. In particular, it is necessary to lift concrete foundation blocks and accurately place them on the seabed, position the supports, and ultimately assist in connecting to the bridge deck. The type of crane technology suitable for this specific project includes strand jacks or winches for lifting, and skids or trolleys for moving the blocks. We have chosen a trolley system that offers several clear advantages. It allows for continuous movement of the blocks and variable speed, enabling high-speed positioning when lowering the crane. Furthermore, it has very limited maintenance costs compared to skidding systems. [Case Overview] ■ Client: Vinci Construction and Demathieu & Bard Construction (Reunion Island) ■ Product: Hydraulic Gantry *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationTo support the construction of the new Joint Support Ship (JSS), the team at Seaspan Shipyards, based in Vancouver, aimed to find a more effective way to keep the vessel level throughout the project. To move large and heavy objects effectively, safely, and accurately, precise control and synchronized movement of all lifting points are required. To achieve this, the "Enerpac EVO synchronized lifting pump" and 12 "high-capacity hydraulic lifting cylinders" were specified and supplied by the local Enerpac distributor, Hyseco. By using only one operator to control 12 lift points from a single intuitive interface, productivity and accuracy were improved, ultimately helping to maintain the structural integrity as the build progressed. *For more details, please refer to the PDF document or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationA luxurious sailing yacht worth millions of dollars was jacked up by 2 meters for renovations. After the modifications, it was necessary to lower the hull to return the yacht to the sea. Although the yacht was made of carbon fiber, it still weighed 80 tons, and the weight was not evenly distributed. The uneven weight distribution posed a serious challenge for safely lowering the yacht. Therefore, the "EVO-W Series Synchronous Lifting System" was used to safely lower the yacht with precise control. The stage lifting operation mode, featuring nine pre-set working modes, allows a single operator to monitor and control the stroke and center of gravity from a touchscreen display. *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationAt Oyu Tolgoi, one of the largest known copper and gold deposits in the world, there was a need to install steel linings in vertical ore bodies with a maximum diameter of 3 meters and depths of 30 to 70 meters, while seeking a safe and reliable solution that provides precision and synchronized control. Enerpac strand jacks, powered by electric or diesel-driven hydraulic power packs, fully control the lifting operations through their unique SCC-Smart Cylinder Control System. These are ideal for customers seeking precise synchronized control with the capability to lift heavy loads in an economical, compact, and reliable installation footprint. The company used four "HSL7006 strand jacks" for the installation of the steel linings. With automatic lock/unlock operations, the system is controlled by one operator from a central location, enhancing safety. It not only strengthens synchronized control during descent but also allows for fine adjustments during lowering to remove obstacles during installation. *For more details, please refer to the PDF document or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationAl Masaood Trading, the sales agent for Enerpac based in Dubai, was tasked with providing a safe, accurate, and compact solution for weighing the cantilever and drill floor of a jack-up rig. The "EVO-W Series Synchronous Lifting System," equipped with weight measurement capabilities, offers an appropriate solution for measuring the weight of the completed jack-up drilling rig's cantilever and drill floor substructure. Using the EVO-W weighing program, the cantilever and drill floor were lifted simultaneously by several millimeters in multiple increments. All lifting and weighing data were displayed on the monitor of the PLC control system, enabling fully coordinated, safe, and efficient operations. *For more details, please refer to the PDF document or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationTo construct an 850m pedestrian riverwalk, it was necessary to lift and place a precast concrete girder weighing 385 tons into position. Universal Cranes mounted a crane on a 280-ton barge and installed a radio-controlled diesel-powered "SyncHoist system" under the crane hook to position the concrete girder. The "SyncHoist" provides precise vertical and horizontal load handling using a single crane instead of requiring multiple cranes. By utilizing SyncHoist technology, it is possible to safely control uneven loads of irregular shapes weighing several hundred tons while also reducing the risk of damage from vibrations of the wire rope caused by sudden starts and stops of the crane. 【Case Overview】 ■ Client: Universal Cranes (Brisbane, Australia) ■ Product: SyncHoist System *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationScales SAS, a major heavy lifting company in France, used the "Enerpac JS-250 Jack-Up Gantry System" to lift the Koumba, which has a diameter of 8.9m and a length of 11.4m. This product is a tunnel boring machine weighing 880 tons, currently in a new phase of the Paris Metro extension project. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Customer: Scales SAS (Paris, France) ■ Product: JS250 Jack-Up System *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe removal of raise bore reamers has generally been a dangerous, complex, costly, and time-consuming process. For this reason, PYBAR Mining Services, a specialist in underground mining, understood the need to develop a safe working method for removing large-diameter reamers in an underground mining environment. Thus, the "Enerpac SL100 Hydraulic Gantry System" was used. The hydraulic gantry provides a safe and efficient way to lift and position heavy loads. It is placed on a skid track and offers means for moving and positioning heavy items. With a maximum lifting capacity of 110 tons, it is operated remotely using the Intellilift wireless control system, which is included with all Enerpac hydraulic gantries. Once the reamer is lifted from the shaft, it is pulled away from the open shaft, and a hole cover is placed over it to create a safe working area. *For more details, please refer to the PDF document or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationAll boreholes of oil wells being drilled must be covered with durable materials to prevent contamination and provide structural support during drilling. The elevator spider is used as a guide to center each casing, and the pins need to be replaced with each drilling to remove corrosion and dirt that accumulates during the process. Additionally, the existing process for removing the pins at MOISS took up to four hours and required continuous hammering. The spindle bar passes through the center of the "RCH series" hollow cylinder attached to a metal sleeve and connects to the pins of the elevator spider. The "RCH series hollow plunger hydraulic cylinder" equipped with the "P series Ultima hydraulic hand pump" provides a hydraulic solution to pull out the pins in under 15 minutes, saving the maintenance team several hours. *For more details, please refer to the PDF document or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe renovation of a historic building in the capital of Georgia required lifting a 3.4-meter-high steel tower. To achieve this, a 16-point SyncLift system and 39 hydraulic jacks were used to synchronously lift the building onto the pylons. A 5.5-meter-long pylon was driven into the concrete foundation from the first floor, and brackets with double-acting hydraulic jacks were installed at the top of each pylon. Four threaded steel rods were passed through each pylon bracket and connected to a structure supporting the building's foundation. Additionally, the SyncLift system allowed the operator to monitor and control all jacks from a single touchscreen controller. *For more details, please refer to the PDF document or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWhen assembling and disassembling tower cranes, it is necessary to secure numerous joints with bolts. The stability of the tower crane depends on the integrity of the bolted connections, and it is important to apply torque accurately to ensure stability. The "S6000 hydraulic torque wrench" provides precise torque output during the assembly of tower crane sections. Additionally, the "S series torque wrench" equipped with the "ZU4 torque wrench pump" ensures that each section is constructed with the highest level of stability. Streif's service team was able to save significant time by using hydraulic torque wrenches compared to manual assembly and disassembly. 【Case Overview】 ■ Customer: Streif (Warsaw, Poland) ■ Product: S6000X hydraulic torque wrench, ZU4T torque wrench pump *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationAfter a devastating earthquake, 2,800 tons of buildings in the city center fell from their foundations, requiring them to be lifted up to 300mm and leveled. Using the EVO synchronized lifting system, we managed the lifting force and extension of 22 high-tonnage double-acting CLRG series hydraulic cylinders, safely and accurately lifting the foundation and buildings to the required positions. Draw wire stroke sensors were installed at each lifting position, providing displacement information to maintain synchronization accuracy across all positions to less than 1mm. By managing lift operations from a single central control system, safety and operational productivity were improved. 【Case Summary】 ■ Customer: Sync Lift Systems Ltd. (Christchurch, New Zealand) ■ Product: EVO Synchronized Lifting System, CLRG Cylinders *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationMaintaining structural integrity throughout the lift was essential not only for ensuring the safety of the lift but also for guaranteeing structural integrity and safety throughout its operational lifespan. To achieve this, we utilized Enerpac PLC-controlled 700 bar synchronized lifting technology to individually control 352 small high-pressure (700 bar) 300-ton hydraulic cylinders, which were integrated into the active skids beneath the steel structure as a group. We were able to sense and control deflection within the required range of 210 mm over a 70-meter span between the pontoon and the main superstructure, thereby protecting its integrity throughout the lifting, weighing, moving, and launching processes. [Case Overview] ■ Client: Marine and Heavy Industry in Malaysia (Johor Bahru) ■ Product: EVO Synchronized Lifting System *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study on the transportation of replacement parts for the reactor vessel head. To provide radiation shielding at the bottom of the head assembly of the reactor vessel, it was necessary to transport a steel plate with a diameter of 14 feet and a thickness of 3 feet through the narrow passage of the equipment hatch in the reactor building. Therefore, to avoid waiting for a large opening to become available, the size and load capacity of the "SPMT600" made it possible to transport the plate through the existing hatch, saving critical time for the project. 【Case Overview】 ■ Customer: PSC (New Orleans, Louisiana, USA) ■ Product: Self-propelled modular trailer SPMT600 *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationBefore Rangemaster installed the new 1,200-ton ring frame hydraulic press, it was necessary to remove the existing hydraulic double-action press. Additionally, the existing printing machine on the second floor had to be dismantled, lifted, and lowered to be moved to the first floor through some limited spaces. To achieve this, the SL400 hydraulic gantry was used to lift the crown and base of the existing press onto load skates. Two gantry units that were on the first floor were moved to the second floor to lift the press and transport it to the new foundation. The press was then lifted from a horizontal position to a vertical position and lowered onto the fixing bolts. [Case Overview] ■ Customer: JH Kemp, Rangemaster (UK) ■ Product: SL400 Hydraulic Gantry *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe Pacific Highway expansion project includes the construction of a new bridge over the Nambucca River. Once completed, the bridge will be 850 meters long, and each girder, weighing up to 158 tons and measuring 41 meters in length, needs to be positioned on precisely controlled bearings. To save time and simplify the placement of the girders, the teams from Universal Cranes and Smithbridge utilized a synchronized hoist system. The SyncHoist system, positioned under the lattice spreader, allowed for finite adjustments of the beams during placement onto the bearings. Additionally, it helped reduce downtime by up to half a day, as the team only needed to adjust the slings instead of changing the rigging gear for each placement. *For more details, please refer to the PDF document or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe Belgian company Stageco built three massive identical stages for the U2 360° tour. One of the construction requirements was that the stage could be assembled and disassembled relatively quickly. Therefore, the company's challenge was how to assemble and dismantle a gigantic structure weighing 230 tons each time. To address this, the company collaborated with Enerpac to develop a unique system based on the Synchronous Lift System. They were able to lift the modular structure quickly and safely to a height of 30 meters. In the world of entertainment, it is clear that shows are becoming increasingly larger and better. This new technology allows set designers even more freedom, enabling them to create grand stages in more locations. In other words, this is a technological step that sets a new trend. *For more details, please refer to the PDF document or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationAs manufacturers optimize production while keeping factories as compact as possible to reduce processing time, the dynamics of the industry are becoming increasingly complex. LASO Transportes AS, a large lift and transport specialist in Portugal, used a combination of the Enerpac SBL500 telescopic hydraulic gantry and side shift to accurately position two presses weighing up to 160 tons. "We were able to operate the presses in three dimensions using the Enerpac side shift. Without it, accurately positioning the presses would have been very difficult," they stated. [Case Summary] ■ Customer: LASO Transportes AS (Portugal) ■ Product: SBL500 hydraulic gantry, gantry side shift accessory ■ Result: Successfully lifted the automotive presses and positioned them in three dimensions to align with a reinforced concrete platform. *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationTransformers, turbines, generators, and other heavy loads often require operation, installation on foundations, or replacement during the construction, maintenance, repair, and shutdown of new buildings. To respond to tight schedules while prioritizing safety when lifting and positioning heavy loads, efficient solutions are necessary. Yew Choon Pte Ltd/Yew Choon Technology, which provides transportation services, owns the Enerpac SBL1100 hydraulic gantry and has further purchased the SBL500 hydraulic gantry to enhance flexibility during lifting operations. This product is fully self-contained, with hydraulic and electrical components integrated into all legs. This makes setup easier, reduces the risk of tripping associated with hydraulic hoses, and allows for unobstructed visibility of the load. *For more details, please refer to the PDF document or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationChanging a flat tire on heavy machinery is one of the particularly dangerous and time-consuming maintenance tasks in underground mining, often taking up to 12 hours to complete in limited spaces with inclines. CME Boilermaking, a leading engineering and manufacturing specialist in Australia, has designed an efficient solution that allows vehicles to be manually jacked up for safe and reliable lifting and maintenance. The company's underground jack system is connected to Enerpac XC series cordless hydraulic pumps and RAR series durable lightweight aluminum cylinders, capable of handling loads of up to 100 tons. "The Enerpac battery pump is the perfect solution, as the absence of cords enhances operator safety," it has been praised. *For more details, please refer to the PDF materials or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationVesuvius processes bricks used inside industrial furnaces. The bricks start in a "soft" state and need to be compressed, hardened, and heated before being placed in the furnace. They are packed into a steel box for compression, which solidifies the bricks; however, after compression, the bricks stick to the steel fixtures, requiring considerable force to remove them. Therefore, a 50-ton hydraulic cylinder and a manual hand pump are used. Pressure is applied to the release rod to remove the bricks from the steel fixtures. The hydraulic system provides a quick and safe solution. [Case Overview] ■ Customer: Vesuvius (Poland) ■ Products: RC series hydraulic cylinders, P series hydraulic hand pumps ■ Result: Provided a quick and safe solution *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe construction of the Las Vegas High Roller observation wheel included the installation of 28 passenger cabins. To ensure accurate and safe installation, a hydraulic drive system was necessary to rotate the wheel into the correct position and alignment. Therefore, Enerpac collaborated with the specialized contractor Schwager Davis Inc. to provide a reliable mechanized system. It consists of a total of 8 drive units, each equipped with 4 large tires, allowing the wheel to rotate in both directions. 【Case Overview】 ■ Client: Caesars Entertainment (United States) ■ Product: Custom hydraulic drive system *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationSouth Carolina Electric & Gas Company (SCE&G) is working on an expansion project for a nuclear power plant and was tasked with installing a 2.4 million pound CA01 module. The CA01 module is not only very large and heavy, but also generally has an irregular shape, making it difficult to handle within the required tolerances, necessitating additional personnel, equipment, and time. In response, Enerpac provided the SyncHoist system, a lifting device under the hook composed of multiple specialized hydraulic cylinders. This system allowed operators to monitor and adjust each lifting point individually or in sync together with precision. *For more details, please refer to the PDF document or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationPetrobras is constructing a new offshore oil platform for oil fields in the Santos Basin off the coast of Rio de Janeiro. Jaragua Equipamentos has been tasked with assembling four modules during the construction of the oil rig. Each module weighs over 700 tons and requires precise lifting and alignment during assembly. To achieve this, the company used the SBL1100 gantry to lift and position each module. By utilizing this product to assemble the oil rig, an efficient and safe solution was realized that allows for the precise positioning of loads weighing 700 tons. [Case Summary] ■ Customer: Jaragua Equipamentos (Brazil) ■ Product: SBL1100 Hydraulic Gantry ■ Result: An efficient and safe solution that allows for the precise positioning of loads weighing 700 tons. *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe KiwiRail project by Downer will permanently improve the country's major trunk railway network, allowing for the transportation of more freight. The Enerpac PUJ-1201E hydraulic electric pump is equipped with a two-stage pump operation to reduce cycle times and enhance productivity. It was used in combination with the Enerpac thin lock ring cylinder, which is employed to support the load of the cantilever section. "The name Enerpac is synonymous with safety and reliability. All the equipment provided for the project functioned seamlessly without interruption," we have received this feedback. [Case Overview] ■ Customer: Downer, Jonel Hydraulics (New Zealand) ■ Products: RCH and RC series cylinders, ZE, ZU, and PUJ series pumps ■ Results: All functioned normally without failure *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the EVO synchronous lifting system and the CLRG series cylinders. The construction of the 4.5 km Waterview Connection highway includes the deployment of a ground pressure balance machine to excavate a 2.5 km underground twin tunnel. To initiate the tunnel excavation process, it was necessary to position a 3,600-ton tunnel boring machine at the starting point. Ten 600-ton cylinders equipped with internal stroke sensors controlled by the EVO synchronous lift system descend to tilt the tunnel boring machine into the starting position. Once the positioning is complete, tunnel excavation begins. After the length of the first tunnel is completed, the system is redeployed to lift and tilt the machine to complete the other parallel lengths of the twin tunnels, ultimately returning to the starting point. *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe removal of raise bore reamers has traditionally been a dangerous and complex process that is costly and time-consuming. For this reason, PYBAR Mining Services, a specialist in underground mining, understood the need to develop a safe working method for removing large-diameter reamers in an underground mining environment. As a solution, the Enerpac SL100 hydraulic gantry system was used. It has a maximum lifting capacity of 110 tons and is operated remotely using the Intellilift wireless control system. The Intellilift controller provides excellent safety and control by eliminating employees from the shaft area during the lifting of the reamer. Once the reamer is lifted from the shaft, it is pulled away from the open shaft and covered with a hole cover, creating a safe working area. *For more details, please refer to the PDF document or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe crawler transporter, built in 1965, has been transporting rockets and spacecraft to the launch pads at Kennedy Space Center for over 40 years. However, modifications were necessary to transport a combination of rockets and launch towers that were heavier than the rockets for which the crawler was designed, and it required considerable force to remove and install new bearings for the redesigned traction roller assembly on the crawler track. Enerpac designed and manufactured custom RR hydraulic cylinders to provide the appropriate amount of force and meet strict dimensional specifications. The ZU hydraulic pump was widely used in this demanding duty cycle application and demonstrated exceptional performance. *For more details, please refer to the PDF document or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationAt Bonneville Power Administration, it is necessary to operate and replace transformers at power plants during outages. The existing process for replacing transformers requires multiple workers to adjust and operate various equipment, and BPA was looking for equipment to simplify the current process and improve safety. With a custom hydraulic skid system, the maintenance team can operate and transport transformers that have limited physical access. One operator can accurately and safely position heavy transformers using push-button controls. [Case Summary] ■ Customer: Bonneville Power Administration (USA) ■ Product: Custom Skidding System ■ Result: One operator can accurately and safely position heavy transformers using push-button controls. *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationMinimizing the time that State Route 266 is closed was a primary objective when reconstructing the bridge over the Holbrook Canal. The new bridge was initially used as a detour while the defective bridge was being demolished, but once the old bridge was taken down, the new bridge had to be slid into place at the original bridge's location. To achieve this, Enerpac provided a hydraulic solution that could push the new 44.5-foot bridge structure into position using a lateral sliding method with PTFE slide elements. The slide was completed in 52 minutes. **Case Overview** - Customer: Kiewit (United States) - Products: RR Series double-acting hydraulic cylinders, ZU Series hydraulic pumps - Result: The slide was completed in 52 minutes. *For more details, please refer to the PDF document or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHiap Seng provides pipeline maintenance services at Shell's Pulau Bukom oil and petrochemical production facility. The removal of corroded or frozen nuts is a common challenge when performing pipe maintenance. Frequent approaches to removing corroded nuts included chisels and hammers, impact wrenches, or gas torches. However, these methods often resulted in damage to the flange surfaces, bolts, or gaskets, taking 15 to 30 minutes per nut. Enerpac supplied the company with NC series hydraulic nut cutters, saving time and allowing for the safe removal of nuts without damaging bolts, flanges, or gaskets. *For more details, please refer to the PDF document or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationIn 2013, Jakarta, the capital of Indonesia, began construction of a Mass Rapid Transit (MRT) system with the expectation of alleviating urban traffic congestion. One of the critical stages of tunnel construction is the pass-through. In this pass-through, it is necessary to move the Tunnel Boring Machine (TBM) through the underground station to the next excavation site, which requires a high-precision system to handle heavy loads with uneven weight distribution. To achieve this, Ekatama Group used a synchronized lifting system and hydraulic jacks to lift and slide the TBM with an accuracy of 1mm throughout all positioning operations. The stroke sensors at each lifting point generated real-time updates and measured load displacement to maintain the precision of 1mm. *For more details, please refer to the PDF document or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationRemoving the 3-meter-long studs from the bucket wheel drive output of the Sandvik stacker reclaimer is a difficult and time-consuming task. In previous operations, it took over 10 hours to remove each stud, and it required up to 120 tons of force to push or pull a total of 16 studs. To safely and timely remove the studs, a custom GT4 hydraulic tensioner was developed. The tensioner extracts each stud in about 30 minutes, significantly saving the maintenance team's time. [Case Overview] ■ Customer: Port Walarta Coal Services (Australia) ■ Product: Custom GT4 Hydraulic Tensioner, ZUTP1500E ■ Result: Significant time savings for the maintenance team *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationTadeo Czerweny, a global company based in Argentina specializing in the power conversion market, was seeking solutions after deciding to expand its manufacturing capacity and produce larger transformers. The immediate need was to vertically lift a heavy platform structure used to assemble the transformer core and transport large transformers within the factory. As a solution, they chose the SBL1100 hydraulic gantry series. This provides more precise and controlled movements compared to using a ceiling crane, and such flexibility allows for use in various operations throughout the manufacturing process. 【Case Overview】 ■Customer: Tadeo Czerweny (Argentina) ■Product: SBL1100 Hydraulic Gantry ■Result: The ability to perform programmed lifting and positioning of heavy loads at various points in the factory with a single piece of equipment, resulting in cost-effectiveness. *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "V82HK" is a hydraulic valve used for opening and closing hydraulic circuits, designed for a maximum operating pressure of 70 MPa. It is suitable for minor pressure relief within the system and for maintaining pressure in low flow rate pumps. The allowable flow rate is 3 L/min, and the port size is NPT 1/4. Please feel free to contact us for inquiries. 【Specifications】 ■ Maximum operating pressure (MPa): 70 ■ Allowable flow rate (L/min): 3 ■ Port size: NPT 1/4 ■ Weight (kg): 0.2 *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration