Here are some examples of accidents that can occur due to voids, insufficient filling, and inadequate compaction during concrete placement.
Tunnel construction, bridge construction, road construction, river and coastal construction, agricultural civil engineering, and building construction. Additionally, during concrete placement work for various concrete structures, accidents and troubles may occur due to voids, insufficient filling, and inadequate compaction, as described below.
【Examples of Accidents (Partial)】
- Cave-in accidents
- Cavities formed due to groundwater, leading to cracks (cracks are more likely to occur in areas with insufficient filling)
→ Poor long-term durability resulting in collapse
- Water leakage from cracks
→ In cold regions, water leakage can freeze, leading to slip accidents
To prevent such accidents and troubles during concrete placement work, we offer the following product ▼▼▼
【NETIS Registration Number TH-180010-VE】 Juuten MierukaⓇ
This product can accurately assess the filling condition in areas that are not visible during concrete placement and in areas prone to air pockets. Furthermore, by adding management functions for compaction levels, it contributes to improving the quality of concrete construction!
For detailed product information, please download the catalog from the link below.